FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 45 kNP2​ = 20 kNABCRA​ = ?1 m5 m4 m

The beam has a pin at A and a roller at B, 6 m from A, and overhangs B to the free end C. Find the vertical reaction RA, taking upward as positive.

AB = 6 mAC = 10 mP1 = 45 kN at 1 mP2 = 20 kN at 10 m
RA = kN
2.Beam support reactionsHard
P = 55 kN, 40°Q = 70 kNABRA​ = ?2 m3 m3 m

The simply supported beam has a pin at A and a roller at B. A load P acts at 5 m from A, inclined at 40° to the horizontal, and a vertical load Q acts at 2 m from A. Find the magnitude of the total reaction force RA at the pin A.

L = 8 mP = 55 kN at 5 m, θ = 40°Q = 70 kN at 2 m
RA = kN
3.Truss: method of jointsMedium
ABCDEFGH35 kN40 kN4 × 4 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 35 kN ↓F: 40 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
4.Truss: method of jointsHard
ABCDEFGH10 kN15 kN15 kN10 kN15 kN35 kN4 × 3 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 10 kN ↓C: 15 kN ↓F: 15 kN ↓F: 10 kN →G: 15 kN ↓H: 35 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
5.Shear force & bending momentMedium
M0​ = 40 kN·mAB5 m3 m

The simply supported beam carries a clockwise couple M0 = 40 kN·m at x = 5 m from A, and no other load. Find the bending moment Mx just to the right of the couple. Use sagging moments positive and upward shear on the left face positive.

L = 8 mM0 = 40 kN·m clockwise, at 5 m
Mx = kN·m
6.Shear force & bending momentHard
w = 5 kN/mP = 40 kNABsection2 m2 m

Find the bending moment Mx at the section x = 2 m from support A. Use sagging moments positive and upward shear on the left face positive.

L = 4 mP = 40 kN at 2 mw = 5 kN/m from 0 to 4 mx = 2 m
Mx = kN·m
7.Beam deflectionMedium
w = 2 kN/mABθ5 m

A simply supported beam carries a uniformly distributed load w over its whole span. Find the slope θA of the beam at support A, in radians.

w = 2 kN/mL = 5 mE = 11 GPa (timber)I = 84 × 10⁶ mm⁴
θA = rad
8.Beam deflectionHard
w = 2 kN/mP = 21 kNδL = 5 m

A simply supported beam carries a uniformly distributed load w and a point load P at midspan. Using superposition, find the midspan deflection δmax.

P = 21 kNw = 2 kN/mL = 5 mE = 200 GPa (steel)I = 120 × 10⁶ mm⁴
δmax = mm
9.Column bucklingMedium
PL = 2 md = 30 mmcross-section

A column of length L made of steel is fixed at both ends. Using Euler’s formula, find its critical buckling load Pcr.

L = 2 mE = 200 GPa (steel)d = 30 mm
Pcr = kN
10.Column bucklingHard
PL = 2.5 md = 40 mmcross-section

A column of length L made of steel is fixed at the base and free at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 2.5 mE = 200 GPa (steel)d = 40 mm
σcr = MPa
11.Centroid & second moment of areaMedium
100302208xdimensions in mm

Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.

bf = 100 mmtf = 30 mmtw = 8 mmhw = 220 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
100 mm200 mm130 mm50 × 40xIx​ = ?

A 100 mm × 200 mm plate has a rectangular cut-out 50 mm wide and 40 mm high, centred on the vertical centre line with its centre 130 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 100 mmh = 200 mmcut-out: 50 × 40 mmhole centre: y = 130 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
sandγd​ = 17 kN/m³γsat​ = 19 kN/m³7 mwater tableXz = 7 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 7 mzw = 1 mγw = 9.81 kN/m³sand: γd = 17 kN/m³sand: γsat = 19 kN/m³
σ = kPa
14.Effective stress in soilHard
sandγd​ = 17 kN/m³γsat​ = 18.5 kN/m³3 mclayγsat​ = 17 kN/m³4 mwater tableXz = 5 m

For the soil profile shown, find the pore water pressure u at point X.

z = 5 mzw = 2 mγw = 9.81 kN/m³sand: γd = 17 kN/m³sand: γsat = 18.5 kN/m³clay: γsat = 17 kN/m³
u = kPa
15.Consolidation settlementMedium
Δσ = 75 kPasandclayCc​ = 0.25, Cr​ = 0.05e0​ = 0.65σ′0​ = 90 kPaσ′p​ = 180 kPa7 mwater table

A 7 m thick overconsolidated clay layer has Cc = 0.25, Cr = 0.05 and e₀ = 0.65. At its mid-depth the effective vertical stress is 90 kPa and the preconsolidation pressure is 180 kPa. A new building adds 75 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 7 mCc = 0.25Cr = 0.05e0 = 0.65σ′0 = 90 kPaσ′p = 180 kPaΔσ = 75 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 4 m4 msandwater table

In a laboratory oedometer test, a clay specimen 19 mm thick, drained at the top and bottom, reaches 50% consolidation in 5 min. In the field the same clay forms a layer 4 m thick. It lies between two sand layers, so water drains out at the top and the bottom. How many days t does the field layer take to reach 50% consolidation?

hlab = 19 mmtlab = 5 minH = 4 mfield: double drainage
t = days
17.Hydrostatic forceMedium
gated = 2 mH = 2 m

A vertical rectangular gate 1 m wide sits in the wall of a tank of water, with its top edge 2 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 2 mH = 2 mb = 1 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 2 mH = 2.5 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of glycerin, with its top edge 2 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 2 mH = 2.5 mb = 2 mρ = 1260 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
V = 1.6 m/sD = 200 mmL = 200 mf = 0.02

Water (ρ = 1000 kg/m³) flows at 1.6 m/s through a horizontal pipe, 200 m long, with an inside diameter of 200 mm. Use the Darcy friction factor f = 0.02 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 1.6 m/sL = 200 mD = 200 mmf = 0.02ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 2Δz = ?L = 200 m, D = 200 mm, f = 0.0252× bend (K = 0.3)

Two open reservoirs are joined by a pipe 200 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.025. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 2) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 60 L/s?

Q = 60 L/sL = 200 mD = 200 mmf = 0.025Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 2Kexit = 1.0
Δz = m
21.Open-channel flow (Manning)Medium
b = 4 my = 2.5 mn = 0.014, S = 0.004

A rectangular unfinished concrete channel is 4 m wide. Water flows uniformly 2.5 m deep. Manning n = 0.014 and the bed slope is S = 0.004. Find the flow rate Q in m³/s.

b = 4 my = 2.5 mn = 0.014S = 0.004
Q = m³/s
22.Open-channel flow (Manning)Hard
D = 600 mmn = 0.013, V = 0.6 m/s

A concrete sewer with an inside diameter of 600 mm (Manning n = 0.013) must reach a self-cleansing velocity of 0.6 m/s when flowing just full. Find the minimum slope S (in m/m).

D = 600 mmn = 0.013V = 0.6 m/s
S = m/m
23.Pumps & pump powerMedium
PQ = 100 L/sH = 66 m

A pump delivers 100 L/s of water (ρ = 1000 kg/m³) against a head of 66 m. The pump efficiency is 72% and the electric motor driving it has an efficiency of 95%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.

Q = 100 L/sH = 66 mηpump = 72%ηmotor = 95%g = 9.81 m/s²
Pel = kW
24.Pumps & pump powerHard
PQ = 80 L/sΔz = 30 mL = 150 m, D = 200 mm, f = 0.018, ΣK = 8

A pump moves 80 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 30 m higher. The pipe is 150 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.018; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.

Q = 80 L/sΔz = 30 mL = 150 mD = 200 mmf = 0.018ΣK = 8
H = m
25.Time value of moneyMedium
years0123…11€20 000FV = ?

You invest €20 000 at 5% per year with continuous compounding. Find the value FV after 11 years.

PV = €20 000r = 5%t = 11
FV = €
26.Time value of moneyHard
months01…36…240€150 000AB = ?A5.4% / 12

A mortgage of €150 000 is repaid with equal monthly payments over 20 years at 5.4% per year, compounded monthly. How much is still owed just after the payment at the end of year 3? Find the outstanding balance B.

P = €150 0005.4% / 12N = 240k = 36
B = €
27.NPV & IRRMedium
years01234−45 00011 00018 00020 00021 000

An investment of €45 000 gives these cash flows at the end of years 1 to 4: €11 000, €18 000, €20 000, €21 000. The cost of capital is 10%. Find the net present value NPV.

r = 10%CF0 = −45 000CF1 = 11 000CF2 = 18 000CF3 = 20 000CF4 = 21 000
NPV = €
28.NPV & IRRHard
years0123−10 0004 0005 5004 000

A project costs €10 000 and returns €4 000, €5 500, €4 000 at the end of years 1 to 3. Find its internal rate of return IRR in percent.

CF0 = −10 000CF1 = 4 000CF2 = 5 500CF3 = 4 000
IRR = %
29.Normal distributionMedium
32 min35.8 minX + Y?

X is normal with mean 12 min and standard deviation 1.5 min; Y is independent and normal with mean 20 min and standard deviation 2 min. Find the probability P that X + Y is more than 35.8 min. Round z to two decimals.

μX = 12, σX = 1.5μY = 20, σY = 2X + Y > 35.8 min
P =
30.Normal distributionHard
0.03 mm0D − d?

Hole diameters D are normal with mean 25.03 mm and standard deviation 0.02 mm. Shaft diameters d are independent and normal with mean 25 mm and standard deviation 0.01 mm. A randomly chosen shaft fits when D − d > 0. Find the probability P that it fits. Round z to two decimals.

hole: μ = 25.03 mm, σ = 0.02 mmshaft: μ = 25 mm, σ = 0.01 mm
P =

3Solutions

1.Beam support reactions

Answer: RA = 24.17 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Moments about A

Counter-clockwise positive.

ΣMA = 0: RB·6 = 45·1 + 20·10
RB = 245/6 = 40.83 kN

Vertical equilibrium

RA = 45 + 20 − 40.83 = 24.17 kN

Answer

RA = 24.17 kN
2.Beam support reactions

Answer: RA = 78.1 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Components of P

Pv = 55·sin 40° = 35.35 kN
Ph = 55·cos 40° = 42.13 kN

Reactions

ΣMA = 0: RB·8 = 35.35·5 + 70·2 → RB = 39.6 kN
Ay = 35.35 + 70 − 39.6 = 65.76 kN
Ax = Ph = 42.13 kN

Resultant at A

RA = √(42.13² + 65.76²) = 78.1 kN

Answer

RA = 78.1 kN
3.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 75 kN (T), BC: 50 kN (T), CD: 50 kN (T), DE: 25 kN (T), FG: 75 kN (C), GH: 25 kN (C), AF: 93.75 kN (C), HE: 31.25 kN (C), BF: 16.25 kN (T), CG: 0, DH: 18.75 kN (T), BG: 31.25 kN (T), DG: 31.25 kN (C)

Answer

Zero-force member: CG
4.Truss: method of joints

Answer: member DH

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint D

CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.

ΣF⊥ = 0 → FDH = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 39.37 kN (T), BC: 39.37 kN (T), CD: 38.12 kN (T), DE: 38.12 kN (T), FG: 50 kN (C), GH: 50 kN (C), AF: 48.96 kN (C), HE: 63.54 kN (C), BF: 10 kN (T), CG: 15 kN (C), DH: 0, FC: 17.71 kN (T), HC: 19.79 kN (T)

Answer

Zero-force member: DH
5.Shear force & bending moment

Answer: Mx = 15 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. An applied couple makes the bending moment diagram jump by the size of the couple.

Support reactions

Moments about A, counter-clockwise positive: RB·L − M0 = 0. Vertical balance: RA + RB = 0.

RB = M0/L = 40/8 = 5 kN (upward)
RA = −RB = −5 kN (downward)

Cut just right of the couple

The left part now contains RA and the couple.

Mx = RA·a + M0 = −5·5 + 40 = 15 kN·m

Answer

Mx = 15 kN·m
6.Shear force & bending moment

Answer: Mx = 50 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 5·4 = 20 kN, acting at x̄ = 2 m
ΣMA = 0: RB·4 = 40·2 + 5·4·2
RB = 120/4 = 30 kN
ΣFy = 0: RA = 60 − 30 = 30 kN
w = 5 kN/mP = 40 kNABRA​ = 30RB​ = 30section2 m2 m

Cut at x = 2 m and keep the left part

Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.

M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 30·2 − 5·2·1 = 50 kN·m

Answer

Mx = 50 kN·m
7.Beam deflection

Answer: θA = 0.01127 rad

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). The slope θ = dv/dx is the first integral of M/(EI); in consistent units it comes out in radians.

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 2 N/mm, L = 5000 mm
EI = 9.24 × 10¹¹ N·mm²

End slope

θA = wL³/(24EI) = 2·5000³/(24·9.24 × 10¹¹) = 0.01127 rad

Answer

θA = 0.01127 rad

That is 0.6459°.

8.Beam deflection

Answer: δmax = 2.957 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 21000 N, w = 2 N/mm, L = 5000 mm, EI = 2.4 × 10¹³ N·mm²

Each load on its own

δP = PL³/(48EI) = 21000·5000³/(48·2.4 × 10¹³) = 2.279 mm
δw = 5wL⁴/(384EI) = 5·2·5000⁴/(384·2.4 × 10¹³) = 0.6782 mm

Add them

δmax = 2.279 + 0.6782 = 2.957 mm

Answer

δmax = 2.957 mm
9.Column buckling

Answer: Pcr = 78.48 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·30⁴/64 = 39761 mm⁴

Effective length

KL = 0.5·2000 = 1000 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·39761/1000² = 78485 N = 78.48 kN

Answer

Pcr = 78.48 kN
10.Column buckling

Answer: σcr = 7.896 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·40⁴/64 = 125664 mm⁴

Radius of gyration and slenderness

A = 1257 mm²
r = √(I/A) = √(125664/1257) = 10 mm
KL = 2·2500 = 5000 mm
KL/r = 5000/10 = 500

Critical stress

σcr = π²E/(KL/r)² = π²·200000/500² = 7.896 MPa

Answer

σcr = 7.896 MPa
11.Centroid & second moment of area

Answer: Ix = 24.66 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 100·30 = 3000 mm², yf = 220 + 30/2 = 235 mm
web: Aw = 8·220 = 1760 mm², yw = 220/2 = 110 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (3000·235 + 1760·110)/4760 = 188.8 mm

Parallel-axis theorem

flange: 100·30³/12 + 3000·(235 − 188.8)² = 6.633 × 10⁶ mm⁴
web: 8·220³/12 + 1760·(110 − 188.8)² = 1.802 × 10⁷ mm⁴
Ix = 6.633 × 10⁶ + 1.802 × 10⁷ = 2.466 × 10⁷ mm⁴ = 24.66 × 10⁶ mm⁴

Answer

Ix = 24.66 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: Ix = 64.4 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (20000·100 − 2000·130)/(20000 − 2000) = 96.67 mm

Full plate about ȳ

100·200³/12 + 20000·3.333² = 66.89 × 10⁶ mm⁴

Hole about ȳ

50·40³/12 + 2000·33.33² = 2.489 × 10⁶ mm⁴

Subtract

Ix = 64.4 × 10⁶ mm⁴

Answer

Ix = 64.4 × 10⁶ mm⁴
13.Effective stress in soil

Answer: σ = 131 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 17·1 + 19·6 = 131 kPa

Answer

σ = 131 kPa
14.Effective stress in soil

Answer: u = 29.43 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·3 = 29.43 kPa

Answer

u = 29.43 kPa
15.Consolidation settlement

Answer: S = 55.84 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 90 + 75 = 165 kPa ≤ 180 kPa

Settlement

The clay stays on its recompression line.

S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.05·7/(1 + 0.65)·log₁₀(165/90) = 55.84 mm

Answer

S = 55.84 mm
16.Consolidation settlement

Answer: t = 153.9 days

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage paths

Hdr,lab = 19/2 = 9.5 mm = 0.0095 m
Hdr,field = 4/2 = 2 m

Scale the time

t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.

tfield = 5·(2/0.0095)² = 221607 min
tfield = 221607/1440 = 153.9 days

Answer

t = 153.9 days
17.Hydrostatic force

Answer: F = 58.86 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 2 + 2/2 = 3 m
A = H·b = 2·1 = 2 m²
gated = 2 mH = 2 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·3·2 = 58.86 kN

Answer

F = 58.86 kN
18.Hydrostatic force

Answer: ycp = 3.41 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 2 + 2.5/2 = 3.25 m
A = H·b = 2.5·2 = 5 m²
gated = 2 mH = 2.5 mF

Resultant force

F = ρ·g·yc·A = 1260·9.81·3.25·5 = 200.9 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 2·2.5³/12 = 2.604 m⁴
ycp = yc + Ic/(yc·A) = 3.25 + 2.604/(3.25·5) = 3.41 m

Answer

ycp = 3.41 m
19.Pipe friction & head loss

Answer: Δp = 25.6 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.02·(200/0.2)·1.6²/(2·9.81) = 2.61 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·2.61 = 25600 Pa = 25.6 kPa

Answer

Δp = 25.6 kPa
20.Pipe friction & head loss

Answer: Δz = 5.41 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.06/0.03142 = 1.91 m/s
V²/(2g) = 0.1859 m

Loss coefficients

f·L/D = 0.025·200/0.2 = 25
ΣK = 0.5 + 2·0.3 + 2 + 1.0 = 4.1

Total head loss

hf = 25·0.1859 = 4.648 m
hm = 4.1·0.1859 = 0.7622 m
Δz = hf + hm = 5.41 m

Answer

Δz = 5.41 m
21.Open-channel flow (Manning)

Answer: Q = 48.46 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 4·2.5 = 10 m²
P = b + 2y = 4 + 2·2.5 = 9 m
R = A/P = 1.111 m

Velocity

V = (1/0.014)·1.1112/3·0.0041/2 = 4.846 m/s

Flow rate

Q = A·V = 10·4.846 = 48.46 m³/s

Answer

Q = 48.46 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.0007634 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Hydraulic radius

R = D/4 = 0.6/4 = 0.15 m

Solve Manning for S

S = (n·V/R2/3)² = (0.013·0.6/0.2823)² = 0.0007634

Answer

S = 0.0007634

That is a fall of 0.7634 m per kilometre.

23.Pumps & pump power

Answer: Pel = 94.66 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.1·66 = 64.75 kW

Shaft power

Pshaft = 64.75/0.72 = 89.92 kW

Electrical power

Pel = 89.92/0.95 = 94.66 kW

Answer

Pel = 94.66 kW
24.Pumps & pump power

Answer: H = 37.11 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.08/0.03142 = 2.546 m/s
V²/(2g) = 0.3305 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (13.5 + 8)·0.3305 = 7.106 m

Pump head

Both surfaces are open and practically at rest, so pressure and velocity terms drop out.

H = Δz + hL = 30 + 7.106 = 37.11 m

Answer

H = 37.11 m
25.Time value of money

Answer: FV = 34665 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Exponent

r·t = 0.05·11 = 0.55
e0.55 = 1.733

Future value

FV = 20 000·1.733 = €34 665.06

Answer

FV = €34 665.06
26.Time value of money

Answer: B = 136418 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly payment

i = 0.0045, N = 240
A = 150 000·0.0045/(1 − (1 + 0.0045)−240) = €1 023.38

Present value of the remaining payments

Whatever is still owed must be exactly paid off by the remaining payments.

N − k = 240 − 36 = 204
B = 1023·(1 − (1 + 0.0045)−204)/0.0045 = €136 418.47

Answer

B = €136 418.47
27.NPV & IRR

Answer: NPV = 9246 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of each cash flow

CF0 = −45 000
CF1/(1 + 0.1)1 = 11 000/1.1 = 10 000.00
CF2/(1 + 0.1)2 = 18 000/1.21 = 14 876.03
CF3/(1 + 0.1)3 = 20 000/1.331 = 15 026.30
CF4/(1 + 0.1)4 = 21 000/1.464 = 14 343.28

Add them up

NPV = €9 245.61

Answer

NPV = €9 245.61

NPV is positive, so the project earns more than the required return.

28.NPV & IRR

Answer: IRR = 16.6 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(15%) = 267.12
NPV(20%) = −532.41

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 15 + 5·267.12/(267.12 − (−532.41)) = 16.67%
exact: NPV(16.6%) = 0 → IRR = 16.6%

Answer

IRR = 16.6%
29.Normal distribution

Answer: P = 0.06426

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the sum

μ = 32 min, σ = √(1.5² + 2²) = 2.5 min

Standardise

z = (35.8 − 32)/2.5 = 1.52

Upper tail

P = 1 − Φ(1.52) = 1 − 0.9357 = 0.06426

Answer

P = 0.06426
30.Normal distribution

Answer: P = 0.9099

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the difference

μ = 25.03 − 25 = 0.03 mm, σ = 0.02236 mm

Standardise

z = (0 − 0.03)/0.02236 = −1.34

Probability

P = 1 − Φ(−1.34) = 0.9099

Answer

P = 0.9099

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.

ExamProblems · examproblems.com/courses/fe-exam-civil