laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.
L = 10 mP1 = 40 kN at 5 mP2 = 40 kN at 6 m
RA = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 6 mP = 50 kN at 3.5 mw = 3 kN/m from 4 to 6 m
RB = kN
3.Truss: method of jointsMedium
Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.
span = 4 mheight = 3 mB is 1 m from Avertical load = 30 kN
FAB = kN
4.Truss: method of jointsHard
Use the method of joints to find the force FBC in member BC. Give tension as positive and compression as negative.
span = 8 mheight = 2 mB is 2 m from Avertical load = 10 kNhorizontal load = 30 kN ←
FBC = kN
5.Shear force & bending momentMedium
Find the bending moment Mx at the section x = 4.5 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 6 mw = 3 kN/m from 0 to 6 mx = 4.5 m
Mx = kN·m
6.Shear force & bending momentHard
Find the bending moment Mx at the section x = 7 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 8 mP = 60 kN at 7 mw = 5 kN/m from 0 to 8 mx = 7 m
Mx = kN·m
7.Beam deflectionMedium
A cantilever carries a uniformly distributed load w over its whole length and a point load P at its free end. Using superposition, find the deflection δ at the free end.
P = 24 kNw = 12 kN/mL = 4 mE = 200 GPa (steel)I = 57 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
A propped cantilever is fixed at A and simply supported (propped) at B. It carries a point load P at midspan. EI is constant. Find the reaction RB at the prop.
L = 5 mP = 25 kN at 2.5 m
RB = kN
9.Column bucklingMedium
A column of length L made of steel is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 6 mE = 200 GPa (steel)d = 80 mm
Pcr = kN
10.Column bucklingHard
A solid round column of length L made of aluminium is fixed at the base and pinned at the top. It must carry 30 kN with a factor of safety of 3 against buckling. Find the smallest diameter d.
P = 30 kNn = 3L = 6 mE = 70 GPa (aluminium)
d = mm
11.Centroid & second moment of areaMedium
A channel section lies with its open side up: a base plate 120 mm wide with two upright legs, 60 mm high overall. Base and legs are all 12 mm thick. Find the height ȳ of the centroid above the bottom edge.
b = 120 mmh = 60 mmt = 12 mm
ȳ = mm
12.Centroid & second moment of areaHard
The T-section is used as a beam with the flange on top and carries a sagging bending moment of 30 kN·m. Find the bending stress σbottom at the bottom edge.
A 6.5 m thick overconsolidated clay layer has Cc = 0.35, Cr = 0.04 and e₀ = 1.2. At its mid-depth the effective vertical stress is 115 kPa and the preconsolidation pressure is 145 kPa. A new building adds 40 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 5 m thick has a coefficient of consolidation cv = 1.5 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 70% average consolidation the time factor is Tv = 0.403. How many years t does the layer take to reach 70% consolidation?
A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 2 m wide sits in the wall of a tank of glycerin, with its top edge 0.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.
Water (ρ = 1000 kg/m³) flows at 2.9 m/s through a horizontal pipe, 200 m long, with an inside diameter of 150 mm. Use the Darcy friction factor f = 0.028 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.
Two open reservoirs are joined by a pipe 150 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.025. The water surface of the upper reservoir is 9 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.
A trapezoidal unfinished concrete channel has a bottom width of 3.5 m and side slopes of 1:1 (horizontal:vertical). Water flows uniformly 1.6 m deep. Manning n = 0.014 and the bed slope is S = 0.0015. Find the flow rate Q in m³/s.
b = 3.5 my = 1.6 mz = 1n = 0.014S = 0.0015
Q = m³/s
22.Open-channel flow (Manning)Hard
A rectangular clean earth channel 3.5 m wide must carry 21 m³/s in uniform flow at a depth of 2.4 m. Manning n = 0.022. Find the required bed slope S (in m/m).
Q = 21 m³/sb = 3.5 my = 2.4 mn = 0.022
S = m/m
23.Pumps & pump powerMedium
A pump delivers 25 L/s of water (ρ = 1000 kg/m³) against a head of 16 m. The pump efficiency is 85% and the electric motor driving it has an efficiency of 92%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.
A pump moves 100 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 9 m higher. The pipe is 150 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.022; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.
You need €5 000 in 5 years. An account pays 3.6% per year, compounded quarterly. How much must you deposit today? Find the present value PV.
FV = €5 0003.6% / 4n = 5
PV = €
26.Time value of moneyHard
A mortgage of €300 000 is repaid with equal monthly payments over 25 years at 7.2% per year, compounded monthly. How much is still owed just after the payment at the end of year 8? Find the outstanding balance B.
P = €300 0007.2% / 12N = 300k = 96
B = €
27.NPV & IRRMedium
A machine costs €60 000 today, lasts 6 years and costs €1 500 per year to run (paid at the end of each year). The cost of capital is 6%. Find its equivalent annual cost EAC.
C0 = €60 000M = €1 500n = 6r = 6%
EAC = €
28.NPV & IRRHard
A project costs €25 000 and returns €10 000, €10 500, €14 000 at the end of years 1 to 3. Cash flows can be reinvested at the cost of capital of 12%. Find the modified internal rate of return MIRR in percent.
The delivery times are normally distributed with mean 32 min and standard deviation 6 min. What fraction lies between 23 and 38.3 min? Give P as a decimal.
μ = 32σ = 6x1 = 23x2 = 38.3
P =
30.Normal distributionHard
The mass X of a product from line 1 and Y from line 2 are independent and normal: X has mean 500 g and standard deviation 8 g, Y has mean 490 g and standard deviation 6 g. Find the probability P that X is greater than Y. Round z to two decimals.
μX = 500 g, σX = 8 gμY = 490 g, σY = 6 g
P =
3Solutions
1.Beam support reactions
Answer: RA = 36 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·10 = 40·5 + 40·6
RB = 440/10 = 44 kN
ΣFy = 0: RA = 80 − 44 = 36 kN
Answer
RA = 36 kN
2.Beam support reactions
Answer: RB = 34.17 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
UDL resultant: W = w·ℓ = 3·2 = 6 kN, acting at x̄ = 5 m
ΣMA = 0: RB·6 = 50·3.5 + 3·2·5
RB = 205/6 = 34.17 kN
ΣFy = 0: RA = 56 − 34.17 = 21.83 kN
Answer
RB = 34.17 kN
3.Truss: method of joints
Answer: FAB = −23.72 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·4 = 30·1 → Cy = 7.5 kN
ΣFy = 0: Ay = 30 − 7.5 = 22.5 kN
Joint A
Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.
sin α = 3/3.162 = 0.9487
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −22.5/0.9487 = −23.72 kN
Answer
FAB = −23.72 kN (compression)
4.Truss: method of joints
Answer: FBC = 15.81 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·8 = 10·2 − 30·2 → Cy = −5 kN
ΣFy = 0: Ay = 10 − −5 = 15 kN
ΣFx = 0: Ax = 30 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
sin γ = 2/6.325 = 0.3162, cos γ = 6/6.325 = 0.9487
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 3·6 = 18 kN, acting at x̄ = 3 m
ΣMA = 0: RB·6 = 3·6·3
RB = 54/6 = 9 kN
ΣFy = 0: RA = 18 − 9 = 9 kN
Cut at x = 4.5 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 9·4.5 − 3·4.5·2.25 = 10.13 kN·m
Answer
Mx = 10.13 kN·m
6.Shear force & bending moment
Answer: Mx = 70 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 5·8 = 40 kN, acting at x̄ = 4 m
ΣMA = 0: RB·8 = 60·7 + 5·8·4
RB = 580/8 = 72.5 kN
ΣFy = 0: RA = 100 − 72.5 = 27.5 kN
Cut at x = 7 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 27.5·7 − 5·7·3.5 = 70 kN·m
Answer
Mx = 70 kN·m
7.Beam deflection
Answer: δ = 78.6 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 24000 N, w = 12 N/mm, L = 4000 mm
EI = 1.14 × 10¹³ N·mm²
Each load on its own
δP = PL³/(3EI) = 24000·4000³/(3·1.14 × 10¹³) = 44.91 mm
δw = wL⁴/(8EI) = 12·4000⁴/(8·1.14 × 10¹³) = 33.68 mm
Add them
δ = 44.91 + 33.68 = 78.6 mm
Answer
δ = 78.6 mm
8.Beam deflection
Answer: RB = 7.813 kN
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).
Remove the prop
Without the prop the beam is a cantilever. Its free end would deflect under the load.
δload = P(L/2)²(3L − L/2)/(6EI) = 5PL³/(48EI)
Compatibility at the prop
The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Required critical load
Pcr = n·P = 3·30000 = 90000 N
KL = 0.7·6000 = 4200 mm
Solve for the diameter
d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·90000·4200²/(π³·70000))^(1/4) = 82.72 mm
Answer
d = 82.72 mm
Check: the slenderness KL/r is 203.1, so the column is slender and Euler applies.
11.Centroid & second moment of area
Answer: ȳ = 19.33 mm
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into rectangles
Take the base at full width and the two legs above it (height h − t), so nothing is counted twice.
base: A1 = 120·12 = 1440 mm², y1 = 6 mm
two legs: A2 = 2·12·48 = 1152 mm², y2 = 12 + 48/2 = 36 mm
Centroid
ȳ = (1440·6 + 1152·36)/2592 = 19.33 mm
Answer
ȳ = 19.33 mm
12.Centroid & second moment of area
Answer: σbottom = 257.5 MPa
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 240·30 = 7200 mm², yf = 120 + 30/2 = 135 mm
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·5 = 49.05 kPa
Answer
u = 49.05 kPa
14.Effective stress in soil
Answer: σ′ = 69.6 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·2 + γsat,sand·1 + γsat,clay·3.5
σ = 16.5·2 + 19.5·1 + 17.5·3.5 = 113.8 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·4.5 = 44.15 kPa
Effective stress
σ′ = σ − u = 113.8 − 44.15 = 69.6 kPa
Answer
σ′ = 69.6 kPa
15.Consolidation settlement
Answer: S = 41.85 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 115 + 40 = 155 kPa > 145 kPa
Settlement
Recompression up to σ′p, virgin compression beyond it.
S = 0.04·6.5/(1 + 1.2)·log₁₀(145/115) + 0.35·6.5/(1 + 1.2)·log₁₀(155/145)
S = 11.9 + 29.95 = 41.85 mm
Answer
S = 41.85 mm
16.Consolidation settlement
Answer: t = 6.717 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H = 5 m
Time
t = Tv·Hdr²/cv = 0.403·5²/1.5 = 6.717 years
Answer
t = 6.717 years
17.Hydrostatic force
Answer: F = 99.33 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1.5 + 1.5/2 = 2.25 m
A = H·b = 1.5·3 = 4.5 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·2.25·4.5 = 99.33 kN
Answer
F = 99.33 kN
18.Hydrostatic force
Answer: ycp = 1.4 m
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 0.5 + 1.5/2 = 1.25 m
A = H·b = 1.5·2 = 3 m²
Resultant force
F = ρ·g·yc·A = 1260·9.81·1.25·3 = 46.35 kN
Centre of pressure
Pressure grows with depth, so the resultant acts below the centroid.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Head loss
hf = f·(L/D)·V²/(2g) = 0.028·(200/0.15)·2.9²/(2·9.81) = 16 m
Pressure drop
The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.
Δp = ρ·g·hf = 1000·9.81·16 = 156987 Pa = 157 kPa
Answer
Δp = 157 kPa
20.Pipe friction & head loss
Answer: Q = 137.8 L/s
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Loss coefficients
f·L/D = 0.025·150/0.25 = 15
ΣK = 0.5 + 3·0.3 + 5 + 1.0 = 7.4
Energy equation
Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (3.5 + 1·1.6)·1.6 = 8.16 m²
P = b + 2y·√(1 + z²) = 3.5 + 2·1.6·√(1 + 1²) = 8.025 m
R = A/P = 1.017 m
Velocity
V = (1/0.014)·1.0172/3·0.00151/2 = 2.797 m/s
Flow rate
Q = A·V = 8.16·2.797 = 22.83 m³/s
Answer
Q = 22.83 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.002977 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.025·16 = 3.924 kW
Shaft power
Pshaft = 3.924/0.85 = 4.616 kW
Electrical power
Pel = 4.616/0.92 = 5.018 kW
Answer
Pel = 5.018 kW
24.Pumps & pump power
Answer: H = 13.48 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are open and practically at rest, so pressure and velocity terms drop out.
H = Δz + hL = 9 + 4.484 = 13.48 m
Answer
H = 13.48 m
25.Time value of money
Answer: PV = 4180 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rate and number of periods
i = 0.036000000000000004/4 = 0.009
N = 4·5 = 20
Present value
PV = FV/(1 + i)N = 5 000/1.196 = €4 179.72
Answer
PV = €4 179.72
26.Time value of money
Answer: B = 253609 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Whatever is still owed must be exactly paid off by the remaining payments.
N − k = 300 − 96 = 204
B = 2159·(1 − (1 + 0.006)−204)/0.006 = €253 608.59
Answer
B = €253 608.59
27.NPV & IRR
Answer: EAC = 13702 €
Equivalent annual cost: spread the present value of all costs over the life as an equal yearly amount (an annuity): EAC = PV·r/(1 − (1 + r)⁻ⁿ). It lets you compare machines with different lives.
Annuity factor
(1 − 1.06−6)/0.06 = 4.917
Annualised purchase price
60 000/4.917 = 12 201.76
EAC
EAC = 12 201.76 + 1 500 = €13 701.76
Answer
EAC = €13 701.76
28.NPV & IRR
Answer: MIRR = 15.28 %
Modified IRR: compound every inflow forward to the end of the project at the reinvestment rate (usually the cost of capital) to get the terminal value TV. MIRR is the rate that turns the initial investment into TV: MIRR = (TV/C₀)^(1/n) − 1.
Terminal value of the inflows
10 000·1.122 = 12 544.00
10 500·1.121 = 11 760.00
14 000·1.120 = 14 000.00
TV = 38 304.00
MIRR
MIRR = (38 304.00/25 000)1/3 − 1 = 15.28%
Answer
MIRR = 15.28%
29.Normal distribution
Answer: P = 0.7863
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z-scores
z₁ = (23 − 32)/6 = −1.5
z₂ = (38.3 − 32)/6 = 1.05
Area between
P = Φ(1.05) − Φ(−1.5) = 0.8531 − 0.06681 = 0.7863
Answer
P = 0.7863
30.Normal distribution
Answer: P = 0.8413
Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).
Distribution of the difference
μ = 500 − 490 = 10 g, σ = 10 g
Standardise
z = (0 − 10)/10 = −1
Probability
P = 1 − Φ(−1) = 0.8413
Answer
P = 0.8413