1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 60 kNP2​ = 45 kNABRA​RB​ = ?1 m8 m1 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.

L = 10 mP1 = 60 kN at 1 mP2 = 45 kN at 9 m
RB = kN
2.Beam support reactionsHard
w = 2 kN/mP = 10 kNABCRA​ = ?2 m3 m3 m

The beam has a pin at A and a roller at B, 5 m from A, and overhangs B to the free end C. It carries a point load P at 2 m from A and a uniformly distributed load w from 5 m to the free end at 8 m. Find the vertical reaction RA, taking upward as positive.

AB = 5 mAC = 8 mP = 10 kN at 2 mw = 2 kN/m from 5 to 8 m
RA = kN
3.Truss: method of jointsMedium
ABCDEFGH10 kN10 kN25 kN4 × 4 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 10 kN ↓F: 10 kN ↓G: 25 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
4.Truss: method of jointsHard
ABBCACACB45 kN5 kN6 m1 m3 m

Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.

span = 6 mheight = 3 mB is 1 m from Avertical load = 45 kNhorizontal load = 5 kN →
FAC = kN
5.Shear force & bending momentMedium
8 kN/m45 kNABCDEFG1 m1 m1 m1 m1 m1 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

45 kN @ 4 m8 kN/m, 0–6 m
  1. 1A (x = 0 m)
  2. 2B (x = 1 m)
  3. 3C (x = 2 m)
  4. 4D (x = 3 m)
  5. 5E (x = 4 m)
  6. 6F (x = 5 m)
  7. 7G (x = 6 m)
6.Shear force & bending momentHard
w = 6 kN/mABC8 m2 m

The beam rests on a pin at A and a roller at B and overhangs B by 2 m to the free end C. A uniformly distributed load w acts over the whole length A–C. Find the distance xc from A to the point of contraflexure between the supports (where the bending moment changes sign).

L = 10 mw = 6 kN/m from 0 to 10 msupports at x = 0 and x = 8 m
xc = m
7.Beam deflectionMedium
w = 6 kN/mABθ2.5 m

A simply supported beam carries a uniformly distributed load w over its whole span. Find the slope θA of the beam at support A, in radians.

w = 6 kN/mL = 2.5 mE = 11 GPa (timber)I = 36 × 10⁶ mm⁴
θA = rad
8.Beam deflectionHard
w = 2 kN/mP = 20 kNδL = 3 m

A simply supported beam carries a uniformly distributed load w and a point load P at midspan. Using superposition, find the midspan deflection δmax.

P = 20 kNw = 2 kN/mL = 3 mE = 70 GPa (aluminium)I = 160 × 10⁶ mm⁴
δmax = mm
9.Column bucklingMedium
PL = 3 md = 30 mmcross-section

A column of length L made of steel is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 3 mE = 200 GPa (steel)d = 30 mm
Pcr = kN
10.Column bucklingHard
PL = 1 md = 30 mmcross-section

A column of length L made of aluminium is fixed at the base and pinned at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 1 mE = 70 GPa (aluminium)d = 30 mm
σcr = MPa
11.Centroid & second moment of areaMedium
2403201010xdimensions in mm

A symmetric I-section has flanges 240 mm wide and 10 mm thick, an overall depth of 320 mm and a web 10 mm thick. Find its second moment of area Ix about the horizontal centroidal axis x.

B = 240 mmH = 320 mmtf = 10 mmtw = 10 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
2003028018xM = 15 kN·mdimensions in mm

The T-section is used as a beam with the flange on top and carries a sagging bending moment of 15 kN·m. Find the size of the bending stress σtop at the top edge.

bf = 200 mmtf = 30 mmtw = 18 mmhw = 280 mmM = 15 kN·m
σtop = MPa
13.Effective stress in soilMedium
sandγd​ = 17 kN/m³γsat​ = 19.5 kN/m³12 mwater tableXz = 7 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 7 mzw = 1 mγw = 9.81 kN/m³sand: γd = 17 kN/m³sand: γsat = 19.5 kN/m³
σ = kPa
14.Effective stress in soilHard
sandγd​ = 17 kN/m³γsat​ = 20.5 kN/m³3 mclayγsat​ = 17 kN/m³8 mwater tableXz = 7 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 7 mzw = 1 mγw = 9.81 kN/m³sand: γd = 17 kN/m³sand: γsat = 20.5 kN/m³clay: γsat = 17 kN/m³
σ′ = kPa
15.Consolidation settlementMedium
Δσ = 200 kPasandclayCc​ = 0.2, Cr​ = 0.02e0​ = 1σ′0​ = 105 kPaOCR = 1.55.5 mwater table

A 5.5 m thick overconsolidated clay layer has Cc = 0.2, Cr = 0.02 and e₀ = 1. At its mid-depth the effective vertical stress is 105 kPa and the overconsolidation ratio is OCR = 1.5. A new building adds 200 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 5.5 mCc = 0.2Cr = 0.02e0 = 1σ′0 = 105 kPaOCR = 1.5Δσ = 200 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 6 m6 msandwater table

In a laboratory oedometer test, a clay specimen 19 mm thick, drained at the top and bottom, reaches 50% consolidation in 12 min. In the field the same clay forms a layer 6 m thick. It lies between two sand layers, so water drains out at the top and the bottom. How many days t does the field layer take to reach 50% consolidation?

hlab = 19 mmtlab = 12 minH = 6 mfield: double drainage
t = days
17.Hydrostatic forceMedium
gated = 1.5 mH = 2 m

A vertical rectangular gate 1.5 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1.5 mH = 2 mb = 1.5 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 2 mH = 1 m

A vertical rectangular gate 1.5 m wide sits in the wall of a tank of glycerin, with its top edge 2 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 2 mH = 1 mb = 1.5 mρ = 1260 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
Q = 80 L/sD = 200 mmL = 800 mf = 0.022

Water flows at 80 L/s through a pipe 800 m long with an inside diameter of 200 mm. Use the Darcy friction factor f = 0.022 and g = 9.81 m/s². Find the friction head loss hf.

Q = 80 L/sL = 800 mD = 200 mmf = 0.022g = 9.81 m/s²
hf = m
20.Pipe friction & head lossHard
K = 5Δz = ?L = 400 m, D = 300 mm, f = 0.0183× bend (K = 0.3)

Two open reservoirs are joined by a pipe 400 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.018. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 80 L/s?

Q = 80 L/sL = 400 mD = 300 mmf = 0.018Kentrance = 0.5Kbend = 0.3 (×3)Kvalve = 5Kexit = 1.0
Δz = m
21.Open-channel flow (Manning)Medium
b = 4 my = 1 mn = 0.03, S = 0.0015

A rectangular grass-lined earth channel is 4 m wide. Water flows uniformly 1 m deep. Manning n = 0.03 and the bed slope is S = 0.0015. Find the flow rate Q in m³/s.

b = 4 my = 1 mn = 0.03S = 0.0015
Q = m³/s
22.Open-channel flow (Manning)Hard
D = 375 mmn = 0.013, V = 0.75 m/s

A concrete sewer with an inside diameter of 375 mm (Manning n = 0.013) must reach a self-cleansing velocity of 0.75 m/s when flowing just full. Find the minimum slope S (in m/m).

D = 375 mmn = 0.013V = 0.75 m/s
S = m/m
23.Pumps & pump powerMedium
PQ = 25 L/sH = 12 m

A pump with an efficiency of 82% delivers 25 L/s of water (ρ = 1000 kg/m³) against a head of 12 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.

Q = 25 L/sH = 12 mη = 82%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
350 kPa (gauge)PQ = 50 L/sΔz = 8 mL = 200 m, D = 200 mm, f = 0.025, ΣK = 6

A pump moves 50 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 8 m higher. The pipe is 200 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.025; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 350 kPa. Find the head H the pump must add.

Q = 50 L/sΔz = 8 mL = 200 mD = 200 mmf = 0.025ΣK = 6ptank = 350 kPa
H = m
25.Time value of moneyMedium
years0123…10PV = ?€25 000

You need €25 000 in 10 years. An account pays 3% per year, compounded quarterly. How much must you deposit today? Find the present value PV.

FV = €25 0003% / 4n = 10
PV = €
26.Time value of moneyHard
months01…96…240€250 000AB = ?A2.4% / 12

A mortgage of €250 000 is repaid with equal monthly payments over 20 years at 2.4% per year, compounded monthly. How much is still owed just after the payment at the end of year 8? Find the outstanding balance B.

P = €250 0002.4% / 12N = 240k = 96
B = €
27.NPV & IRRMedium
years0123…9−100 0006 000+1%+1%…r = 9%, NPV = ?

A project costs €100 000 today. It generates €6 000 at the end of the first year, and the cash flow then grows by 1% per year forever. The cost of capital is 9%. Find the net present value NPV.

C0 = €100 000CF1 = €6 000g = 1%r = 9%
NPV = €
28.NPV & IRRHard
years0123−25 0009 0009 50013 000

A project costs €25 000 and returns €9 000, €9 500, €13 000 at the end of years 1 to 3. Cash flows can be reinvested at the cost of capital of 6%. Find the modified internal rate of return MIRR in percent.

r = 6%CF0 = −25 000CF1 = 9 000CF2 = 9 500CF3 = 13 000
MIRR = %
29.Normal distributionMedium
−3−2−10123zshaded area to the right of z = 0.1446

Drag z so that the shaded area under the standard normal curve, to the right of z, is 0.1446. Find z to two decimals.

A = 0.1446
z =
30.Normal distributionHard
μ = 65x = ?97.5%

The exam scores are normally distributed with mean 65 points and standard deviation 10 points. Find the value x below which 97.5% of them lie (the 97.5th percentile).

μ = 65σ = 10P = 97.5%
x = points

3Solutions

1.Beam support reactions

Answer: RB = 46.5 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

P1​ = 60 kNP2​ = 45 kNABRA​RB​1 m8 m1 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·10 = 60·1 + 45·9
RB = 465/10 = 46.5 kN
ΣFy = 0: RA = 105 − 46.5 = 58.5 kN

Answer

RB = 46.5 kN
2.Beam support reactions

Answer: RA = 4.2 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Resultant of the distributed load

W = 2·3 = 6 kN, x̄ = (5 + 8)/2 = 6.5 m

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·5 = 10·2 + 6·6.5
RB = 59/5 = 11.8 kN
RA = 16 − 11.8 = 4.2 kN

Answer

RA = 4.2 kN
3.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 27.5 kN (T), BC: 35 kN (T), CD: 35 kN (T), DE: 17.5 kN (T), FG: 27.5 kN (C), GH: 17.5 kN (C), AF: 38.89 kN (C), HE: 24.75 kN (C), BF: 17.5 kN (T), CG: 0, DH: 17.5 kN (T), BG: 10.61 kN (C), DG: 24.75 kN (C)

Answer

Zero-force member: CG
4.Truss: method of joints

Answer: FAC = 16.67 kN

Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.

ABBCACACB45 kN5 kNAy​Cy​Ax​

Support reactions

Equilibrium of the whole truss. Moments about A, counter-clockwise positive.

ΣMA = 0: Cy·6 = 45·1 + 5·3 → Cy = 10 kN
ΣFy = 0: Ay = 45 − 10 = 35 kN
ΣFx = 0: Ax = −5 kN

Joint C

The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.

sin γ = 3/5.831 = 0.5145, cos γ = 5/5.831 = 0.8575
ΣFy = 0: Cy + FBC·sin γ = 0 → FBC = −10/0.5145 = −19.44 kN
ΣFx = 0: −FAC − FBC·cos γ = 0 → FAC = −(−19.44)·0.8575 = 16.67 kN

Answer

FAC = 16.67 kN (tension)
5.Shear force & bending moment

Answer: E (x = 4 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 39 kN, R2 = 54 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 35, MC = 62, MD = 81, ME = 92 kN·m, MF = 50, MG = 0

Answer

Mark E: ME = 92 kN·m
6.Shear force & bending moment

Answer: xc = 7.5 m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.

Support reactions

Equilibrium of the whole beam, including the load on the overhang.

UDL resultant: W = w·ℓ = 6·10 = 60 kN, acting at x̄ = 5 m
ΣMA = 0: RB·8 = 6·10·5
RB = 300/8 = 37.5 kN
ΣFy = 0: RA = 60 − 37.5 = 22.5 kN

Zero moment

Between the supports M(x) = RA·x − w·x²/2. Apart from x = 0 it is zero at x = 2RA/w.

RA·xc − w·xc²/2 = 0
xc = 2·22.5/6 = 7.5 m

Answer

xc = 7.5 m
7.Beam deflection

Answer: θA = 0.009864 rad

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). The slope θ = dv/dx is the first integral of M/(EI); in consistent units it comes out in radians.

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 6 N/mm, L = 2500 mm
EI = 3.96 × 10¹¹ N·mm²

End slope

θA = wL³/(24EI) = 6·2500³/(24·3.96 × 10¹¹) = 0.009864 rad

Answer

θA = 0.009864 rad

That is 0.5652°.

8.Beam deflection

Answer: δmax = 1.193 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 20000 N, w = 2 N/mm, L = 3000 mm, EI = 1.12 × 10¹³ N·mm²

Each load on its own

δP = PL³/(48EI) = 20000·3000³/(48·1.12 × 10¹³) = 1.004 mm
δw = 5wL⁴/(384EI) = 5·2·3000⁴/(384·1.12 × 10¹³) = 0.1883 mm

Add them

δmax = 1.004 + 0.1883 = 1.193 mm

Answer

δmax = 1.193 mm
9.Column buckling

Answer: Pcr = 17.8 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·30⁴/64 = 39761 mm⁴

Effective length

KL = 0.7·3000 = 2100 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·39761/2100² = 17797 N = 17.8 kN

Answer

Pcr = 17.8 kN
10.Column buckling

Answer: σcr = 79.31 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·30⁴/64 = 39761 mm⁴

Radius of gyration and slenderness

A = 706.9 mm²
r = √(I/A) = √(39761/706.9) = 7.5 mm
KL = 0.7·1000 = 700 mm
KL/r = 700/7.5 = 93.33

Critical stress

σcr = π²E/(KL/r)² = π²·70000/93.33² = 79.31 MPa

Answer

σcr = 79.31 MPa
11.Centroid & second moment of area

Answer: Ix = 137.9 × 10⁶ mm⁴

Second moment of area: for a rectangle about its own centroidal axis I = bh³/12, and about its base bh³/3 (parallel-axis theorem I = Ic + A·d²). A hole is handled by subtracting its I, as long as both parts share the same axis. The elastic section modulus is S = I/c, where c is the distance to the extreme fibre.

Outer rectangle minus the two side cut-outs

Both cut-outs together are (B − tw) wide and hw = H − 2tf high, and share the axis x.

hw = 320 − 2·10 = 300 mm
Ix = (B·H³ − (B − tw)·hw³)/12 = (240·320³ − 230·300³)/12
Ix = 1.379 × 10⁸ mm⁴ = 137.9 × 10⁶ mm⁴

Answer

Ix = 137.9 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: σtop = 12.97 MPa

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 200·30 = 6000 mm², yf = 280 + 30/2 = 295 mm
web: Aw = 18·280 = 5040 mm², yw = 280/2 = 140 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (6000·295 + 5040·140)/11040 = 224.2 mm

Parallel-axis theorem

flange: 200·30³/12 + 6000·(295 − 224.2)² = 3.049 × 10⁷ mm⁴
web: 18·280³/12 + 5040·(140 − 224.2)² = 6.869 × 10⁷ mm⁴
Ix = 3.049 × 10⁷ + 6.869 × 10⁷ = 9.919 × 10⁷ mm⁴

Bending stress

The top edge is h − ȳ from the axis.

y = 310 − 224.2 = 85.76 mm
σ = M·y/I = 1.5 × 10⁷·85.76/9.919 × 10⁷ = 12.97 MPa

Answer

σtop = 12.97 MPa
13.Effective stress in soil

Answer: σ = 134 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 17·1 + 19.5·6 = 134 kPa

Answer

σ = 134 kPa
14.Effective stress in soil

Answer: σ′ = 67.14 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·1 + γsat,sand·2 + γsat,clay·4
σ = 17·1 + 20.5·2 + 17·4 = 126 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·6 = 58.86 kPa

Effective stress

σ′ = σ − u = 126 − 58.86 = 67.14 kPa

Answer

σ′ = 67.14 kPa
15.Consolidation settlement

Answer: S = 167.5 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Preconsolidation pressure

σ′p = OCR·σ′0 = 1.5·105 = 157.5 kPa

Compare with the preconsolidation pressure

σ′f = 105 + 200 = 305 kPa > 157.5 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.02·5.5/(1 + 1)·log₁₀(157.5/105) + 0.2·5.5/(1 + 1)·log₁₀(305/157.5)
S = 9.685 + 157.9 = 167.5 mm

Answer

S = 167.5 mm
16.Consolidation settlement

Answer: t = 831 days

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage paths

Hdr,lab = 19/2 = 9.5 mm = 0.0095 m
Hdr,field = 6/2 = 3 m

Scale the time

t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.

tfield = 12·(3/0.0095)² = 1.197 × 10⁶ min
tfield = 1.197 × 10⁶/1440 = 831 days

Answer

t = 831 days
17.Hydrostatic force

Answer: F = 73.58 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1.5 + 2/2 = 2.5 m
A = H·b = 2·1.5 = 3 m²
gated = 1.5 mH = 2 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2.5·3 = 73.58 kN

Answer

F = 73.58 kN
18.Hydrostatic force

Answer: ycp = 2.533 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 2 + 1/2 = 2.5 m
A = H·b = 1·1.5 = 1.5 m²
gated = 2 mH = 1 mF

Resultant force

F = ρ·g·yc·A = 1260·9.81·2.5·1.5 = 46.35 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 1.5·1³/12 = 0.125 m⁴
ycp = yc + Ic/(yc·A) = 2.5 + 0.125/(2.5·1.5) = 2.533 m

Answer

ycp = 2.533 m
19.Pipe friction & head loss

Answer: hf = 29.08 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Mean velocity

A = π·0.2²/4 = 0.03142 m²
V = Q/A = 0.08/0.03142 = 2.546 m/s

Velocity head

V²/(2g) = 2.546²/(2·9.81) = 0.3305 m

Darcy–Weisbach

hf = f·(L/D)·V²/(2g) = 0.022·(800/0.2)·2.546²/(2·9.81) = 29.08 m

Answer

hf = 29.08 m
20.Pipe friction & head loss

Answer: Δz = 2.05 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.08/0.07069 = 1.132 m/s
V²/(2g) = 0.06529 m

Loss coefficients

f·L/D = 0.018·400/0.3 = 24
ΣK = 0.5 + 3·0.3 + 5 + 1.0 = 7.4

Total head loss

hf = 24·0.06529 = 1.567 m
hm = 7.4·0.06529 = 0.4831 m
Δz = hf + hm = 2.05 m

Answer

Δz = 2.05 m
21.Open-channel flow (Manning)

Answer: Q = 3.941 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 4·1 = 4 m²
P = b + 2y = 4 + 2·1 = 6 m
R = A/P = 0.6667 m

Velocity

V = (1/0.03)·0.66672/3·0.00151/2 = 0.9852 m/s

Flow rate

Q = A·V = 4·0.9852 = 3.941 m³/s

Answer

Q = 3.941 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.002232 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Hydraulic radius

R = D/4 = 0.375/4 = 0.09375 m

Solve Manning for S

S = (n·V/R2/3)² = (0.013·0.75/0.2064)² = 0.002232

Answer

S = 0.002232

That is a fall of 2.232 m per kilometre.

23.Pumps & pump power

Answer: Pshaft = 3.589 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.025·12 = 2.943 kW

Shaft power

Pshaft = Ph/η = 2.943/0.82 = 3.589 kW

Answer

Pshaft = 3.589 kW
24.Pumps & pump power

Answer: H = 47.68 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.05/0.03142 = 1.592 m/s
V²/(2g) = 0.1291 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (25 + 6)·0.1291 = 4.002 m

Pressure head

p/(ρ·g) = 350000/(1000·9.81) = 35.68 m

Pump head

Both surfaces are practically at rest, so there is no velocity head term.

H = Δz + p/(ρ·g) + hL = 8 + 35.68 + 4.002 = 47.68 m

Answer

H = 47.68 m
25.Time value of money

Answer: PV = 18541 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate and number of periods

i = 0.03/4 = 0.0075
N = 4·10 = 40

Present value

PV = FV/(1 + i)N = 25 000/1.348 = €18 541.20

Answer

PV = €18 541.20
26.Time value of money

Answer: B = 164091 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly payment

i = 0.002, N = 240
A = 250 000·0.002/(1 − (1 + 0.002)−240) = €1 312.61

Present value of the remaining payments

Whatever is still owed must be exactly paid off by the remaining payments.

N − k = 240 − 96 = 144
B = 1313·(1 − (1 + 0.002)−144)/0.002 = €164 091.40

Answer

B = €164 091.40
27.NPV & IRR

Answer: NPV = −25000 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Value of the cash flows

PV = 6 000/(0.09 − 0.01) = 75 000.00

NPV

NPV = 75 000.00 − 100 000 = −€25 000.00

Answer

NPV = −€25 000.00

NPV is negative, so the project earns less than the required return.

28.NPV & IRR

Answer: MIRR = 9.898 %

Modified IRR: compound every inflow forward to the end of the project at the reinvestment rate (usually the cost of capital) to get the terminal value TV. MIRR is the rate that turns the initial investment into TV: MIRR = (TV/C₀)^(1/n) − 1.

Terminal value of the inflows

9 000·1.062 = 10 112.40
9 500·1.061 = 10 070.00
13 000·1.060 = 13 000.00
TV = 33 182.40

MIRR

MIRR = (33 182.40/25 000)1/3 − 1 = 9.898%

Answer

MIRR = 9.898%
29.Normal distribution

Answer: z = 1.06

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left of z

Φ(z) = 1 − 0.1446 = 0.8554

Read the z-table backwards

Find 0.8554 inside the table and read off z.

z = 1.06

Answer

z = 1.06
30.Normal distribution

Answer: x = 84.6 points

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z for the percentile

Φ(z) = 0.975 → z = 1.96

Back to x

x = 65 + 1.96·10 = 84.6 points

Answer

x = 84.6 points