laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.
L = 10 mP1 = 55 kN at 4 mP2 = 35 kN at 9 m
RA = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 4 mP = 45 kN at 1 mw = 2 kN/m from 2 to 4 m
RB = kN
3.Truss: method of jointsMedium
Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.
span = 5 mheight = 4 mB is 2 m from Avertical load = 25 kN
FAC = kN
4.Truss: method of jointsHard
Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.
span = 6 mheight = 3 mB is 1 m from Avertical load = 50 kNhorizontal load = 25 kN ←
FAB = kN
5.Shear force & bending momentMedium
Find the bending moment Mx at the section x = 3.5 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 5 mw = 3 kN/m from 0 to 5 mx = 3.5 m
Mx = kN·m
6.Shear force & bending momentHard
Find the bending moment Mx at the section x = 5 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 8 mP = 10 kN at 5 mw = 12 kN/m from 0 to 8 mx = 5 m
Mx = kN·m
7.Beam deflectionMedium
A cantilever carries a uniformly distributed load w over its whole length. Find the deflection δ at the free end.
w = 2 kN/mL = 2 mE = 11 GPa (timber)I = 36 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
A simply supported timber beam of rectangular section, 50 mm wide, carries a uniformly distributed load w over its whole span. Its midspan deflection may not exceed span/250. Find the smallest depth hreq of the section.
w = 1 kN/mL = 3 mE = 11 GPa (timber)b = 50 mm
hreq = mm
9.Column bucklingMedium
A column of length L made of steel is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 6 mE = 200 GPa (steel)b × h = 20 × 100 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of steel is fixed at the base and pinned at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 4 mE = 200 GPa (steel)d = 50 mm
σcr = MPa
11.Centroid & second moment of areaMedium
Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.
bf = 280 mmtf = 15 mmtw = 20 mmhw = 200 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A symmetric I-section has flanges 210 mm wide and 18 mm thick, an overall depth of 300 mm and a web 8 mm thick. It carries a bending moment of 50 kN·m about the axis x. Find the size of the bending stress σj at the junction of the web and the top flange.
An 8 m thick overconsolidated clay layer has Cc = 0.25, Cr = 0.06 and e₀ = 0.8. At its mid-depth the effective vertical stress is 65 kPa and the preconsolidation pressure is 125 kPa. A new building adds 45 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 7.5 m thick has a coefficient of consolidation cv = 2.5 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 70% average consolidation the time factor is Tv = 0.403. How many years t does the layer take to reach 70% consolidation?
A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 1 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 1 m wide sits in the wall of a tank of seawater, with its top edge 1 m below the surface. Find the resultant hydrostatic force F on the gate.
Water flows at 150 L/s through a pipe 500 m long with an inside diameter of 300 mm. Use the Darcy friction factor f = 0.015 and g = 9.81 m/s². Find the friction head loss hf.
Two open reservoirs are joined by a pipe 200 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.022. The water surface of the upper reservoir is 26 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each), a valve (K = 0.2) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.
A trapezoidal gravel channel has a bottom width of 1.5 m and side slopes of 1.5:1 (horizontal:vertical). Water flows uniformly 2.5 m deep. Manning n = 0.025 and the bed slope is S = 0.005. Find the flow rate Q in m³/s.
b = 1.5 my = 2.5 mz = 1.5n = 0.025S = 0.005
Q = m³/s
22.Open-channel flow (Manning)Hard
A trapezoidal brickwork channel with a bottom width of 1 m and side slopes of 2:1 (horizontal:vertical) must carry 3 m³/s in uniform flow at a depth of 1 m. Manning n = 0.015. Find the required bed slope S (in m/m).
Q = 3 m³/sb = 1 my = 1 mz = 2n = 0.015
S = m/m
23.Pumps & pump powerMedium
In a test, a pump delivers 40 L/s of water (ρ = 1000 kg/m³) against a head of 70 m while its shaft takes 42.3 kW. Use g = 9.81 m/s². Find the pump efficiency η in percent.
Q = 40 L/sH = 70 mPshaft = 42.3 kWg = 9.81 m/s²
η = %
24.Pumps & pump powerHard
A pump moves 80 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 12 m higher. The pipe is 500 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.02; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 250 kPa. Find the head H the pump must add.
You invest €10 000 at 4% per year with continuous compounding. Find the value FV after 17 years.
PV = €10 000r = 4%t = 17
FV = €
26.Time value of moneyHard
A loan of €12 000 is repaid with equal monthly payments over 4 years. The interest rate is 3% per year, compounded monthly. Find the monthly payment A.
P = €12 0003% / 12N = 48
A = €
27.NPV & IRRMedium
A project costs €20 000 today and returns €7 000, €8 000, €8 000, €4 500 at the end of years 1 to 4. The cost of capital is 12%. Assume cash flows arrive evenly through each year. Find the discounted payback period DPB in years.
A project costs €20 000 and returns €11 500, €12 500, €12 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
CF0 = −20 000CF1 = 11 500CF2 = 12 500CF3 = 12 500
IRR = %
29.Normal distributionMedium
The masses of bags of cement are independent and normal with mean 25 kg and standard deviation 0.5 kg. Find the probability P that the total mass of 4 of them is below 99.5 kg. Round z to two decimals.
μ = 25 kgσ = 0.5 kgn = 4< 99.5 kg
P =
30.Normal distributionHard
The heights X of men and Y of women in a group are independent and normal: X has mean 180 cm and standard deviation 10 cm, Y has mean 170 cm and standard deviation 12 cm. Find the probability P that X is greater than Y. Round z to two decimals.
μX = 180 cm, σX = 10 cmμY = 170 cm, σY = 12 cm
P =
3Solutions
1.Beam support reactions
Answer: RA = 36.5 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·10 = 55·4 + 35·9
RB = 535/10 = 53.5 kN
ΣFy = 0: RA = 90 − 53.5 = 36.5 kN
Answer
RA = 36.5 kN
2.Beam support reactions
Answer: RB = 14.25 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
UDL resultant: W = w·ℓ = 2·2 = 4 kN, acting at x̄ = 3 m
ΣMA = 0: RB·4 = 45·1 + 2·2·3
RB = 57/4 = 14.25 kN
ΣFy = 0: RA = 49 − 14.25 = 34.75 kN
Answer
RB = 14.25 kN
3.Truss: method of joints
Answer: FAC = 7.5 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·5 = 25·2 → Cy = 10 kN
ΣFy = 0: Ay = 25 − 10 = 15 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·6 = 50·1 − 25·3 → Cy = −4.167 kN
ΣFy = 0: Ay = 50 − −4.167 = 54.17 kN
ΣFx = 0: Ax = 25 kN
Joint A
Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.
sin α = 3/3.162 = 0.9487
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −54.17/0.9487 = −57.1 kN
Answer
FAB = −57.1 kN (compression)
5.Shear force & bending moment
Answer: Mx = 7.875 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 3·5 = 15 kN, acting at x̄ = 2.5 m
ΣMA = 0: RB·5 = 3·5·2.5
RB = 37.5/5 = 7.5 kN
ΣFy = 0: RA = 15 − 7.5 = 7.5 kN
Cut at x = 3.5 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 7.5·3.5 − 3·3.5·1.75 = 7.875 kN·m
Answer
Mx = 7.875 kN·m
6.Shear force & bending moment
Answer: Mx = 108.8 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 12·8 = 96 kN, acting at x̄ = 4 m
ΣMA = 0: RB·8 = 10·5 + 12·8·4
RB = 434/8 = 54.25 kN
ΣFy = 0: RA = 106 − 54.25 = 51.75 kN
Cut at x = 5 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 51.75·5 − 12·5·2.5 = 108.8 kN·m
Answer
Mx = 108.8 kN·m
7.Beam deflection
Answer: δ = 10.1 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
w = 2 N/mm, L = 2000 mm
EI = 3.96 × 10¹¹ N·mm²
Deflection
δ = wL⁴/(8EI) = 2·2000⁴/(8·3.96 × 10¹¹) = 10.1 mm
Answer
δ = 10.1 mm
8.Beam deflection
Answer: hreq = 124.2 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
bh³/12 = Ireq → h = (12·7.99 × 10⁶/50)1/3 = 124.2 mm
Answer
hreq = 124.2 mm
In practice, choose the next standard depth above this value.
9.Column buckling
Answer: Pcr = 7.46 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·50⁴/64 = 306796 mm⁴
Radius of gyration and slenderness
A = 1963 mm²
r = √(I/A) = √(306796/1963) = 12.5 mm
KL = 0.7·4000 = 2800 mm
KL/r = 2800/12.5 = 224
Critical stress
σcr = π²E/(KL/r)² = π²·200000/224² = 39.34 MPa
Answer
σcr = 39.34 MPa
11.Centroid & second moment of area
Answer: Ix = 37.09 × 10⁶ mm⁴
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 280·15 = 4200 mm², yf = 200 + 15/2 = 207.5 mm
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Outer rectangle minus the two side cut-outs
Both cut-outs together are (B − tw) wide and hw = H − 2tf high, and share the axis x.
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·5 = 49.05 kPa
Effective stress
σ′ = σ − u = 142 − 49.05 = 92.95 kPa
Answer
σ′ = 92.95 kPa
14.Effective stress in soil
Answer: σ = 108 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·2 + γsat,sand·2 + γsat,clay·2
σ = 15.5·2 + 19.5·2 + 19·2 = 108 kPa
Answer
σ = 108 kPa
15.Consolidation settlement
Answer: S = 60.93 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 65 + 45 = 110 kPa ≤ 125 kPa
Settlement
The clay stays on its recompression line.
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.06·8/(1 + 0.8)·log₁₀(110/65) = 60.93 mm
Answer
S = 60.93 mm
16.Consolidation settlement
Answer: t = 2.267 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H/2 = 7.5/2 = 3.75 m
Time
t = Tv·Hdr²/cv = 0.403·3.75²/2.5 = 2.267 years
Answer
t = 2.267 years
17.Hydrostatic force
Answer: F = 110.4 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1 + 2.5/2 = 2.25 m
A = H·b = 2.5·2 = 5 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·2.25·5 = 110.4 kN
Answer
F = 110.4 kN
18.Hydrostatic force
Answer: F = 26.4 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1 + 1.5/2 = 1.75 m
A = H·b = 1.5·1 = 1.5 m²
Resultant force
F = ρ·g·yc·A = 1025·9.81·1.75·1.5 = 26.4 kN
Answer
F = 26.4 kN
19.Pipe friction & head loss
Answer: hf = 5.738 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Mean velocity
A = π·0.3²/4 = 0.07069 m²
V = Q/A = 0.15/0.07069 = 2.122 m/s
Velocity head
V²/(2g) = 2.122²/(2·9.81) = 0.2295 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.015·(500/0.3)·2.122²/(2·9.81) = 5.738 m
Answer
hf = 5.738 m
20.Pipe friction & head loss
Answer: Q = 142.2 L/s
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Loss coefficients
f·L/D = 0.022·200/0.2 = 22
ΣK = 0.5 + 4·0.3 + 0.2 + 1.0 = 2.9
Energy equation
Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (1.5 + 1.5·2.5)·2.5 = 13.13 m²
P = b + 2y·√(1 + z²) = 1.5 + 2·2.5·√(1 + 1.5²) = 10.51 m
R = A/P = 1.248 m
Velocity
V = (1/0.025)·1.2482/3·0.0051/2 = 3.279 m/s
Flow rate
Q = A·V = 13.13·3.279 = 43.04 m³/s
Answer
Q = 43.04 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.0005015 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (1 + 2·1)·1 = 3 m²
P = b + 2y·√(1 + z²) = 1 + 2·1·√(1 + 2²) = 5.472 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.04·70 = 27.47 kW
Efficiency
η = Ph/Pshaft = 27.47/42.3 = 64.94%
Answer
η = 64.94%
24.Pumps & pump power
Answer: H = 56.65 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are practically at rest, so there is no velocity head term.
H = Δz + p/(ρ·g) + hL = 12 + 25.48 + 19.17 = 56.65 m
Answer
H = 56.65 m
25.Time value of money
Answer: FV = 19739 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Exponent
r·t = 0.04·17 = 0.68
e0.68 = 1.974
Future value
FV = 10 000·1.974 = €19 738.78
Answer
FV = €19 738.78
26.Time value of money
Answer: A = 265.6 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Monthly rate and number of payments
i = 0.03/12 = 0.0025
N = 12·4 = 48
Payment
The present value of N equal payments A is A·(1 − (1 + i)⁻ᴺ)/i. Set it equal to the loan and solve for A.
(1 + i)−N = 0.8871
A = 12 000·0.0025/(1 − 0.8871) = €265.61
Answer
A = €265.61
27.NPV & IRR
Answer: DPB = 3.587 years
Payback period: the time until the cumulative cash flows repay the initial investment. Cash is assumed to come in evenly during each year, so the last part is a fraction of a year. The simple payback ignores the time value of money; the discounted payback period uses the discounted cash flows instead.
Discounted and cumulative cash flows
year 1: 7 000/1.12 = 6 250.00 → Σ = 6 250.00
year 2: 8 000/1.254 = 6 377.55 → Σ = 12 627.55
year 3: 8 000/1.405 = 5 694.24 → Σ = 18 321.79
year 4: 4 500/1.574 = 2 859.83 → Σ = 21 181.62
Fraction of the last year
DPB = 3 + 1 678.21/2 859.83 = 3.587
Answer
DPB = 3.587 years
The discounted payback is always longer than the simple payback (2.625 years).
28.NPV & IRR
Answer: IRR = 36.68 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(35%) = 457.76
NPV(40%) = −852.77
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
IRR ≈ 35 + 5·457.76/(457.76 − (−852.77)) = 36.75%
exact: NPV(36.68%) = 0 → IRR = 36.68%
Answer
IRR = 36.68%
29.Normal distribution
Answer: P = 0.3085
Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).
Distribution of the total
μT = 100 kg, σT = 0.5·√4 = 1 kg
Standardise
z = (99.5 − 100)/1 = −0.5
Probability
P = Φ(−0.5) = 0.3085
Answer
P = 0.3085
30.Normal distribution
Answer: P = 0.7389
Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).
Distribution of the difference
μ = 180 − 170 = 10 cm, σ = 15.62 cm
Standardise
z = (0 − 10)/15.62 = −0.64
Probability
P = 1 − Φ(−0.64) = 0.7389
Answer
P = 0.7389