laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 8 mP1 = 50 kN at 2 mP2 = 60 kN at 4 m
RB = kN
2.Beam support reactionsHard
A compound beam is fixed to the wall at A, has an internal hinge at C (5 m from A) and rests on a roller at D (10 m from A). It carries a point load P at 8 m from A and a point load Q at 2 m from A. Find the reaction RD at the roller.
AC = 5 mAD = 10 mP = 40 kN at 8 mQ = 60 kN at 2 m
RD = kN
3.Truss: method of jointsMedium
Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.
span = 5 mheight = 4 mB is 4 m from Avertical load = 50 kN
FAC = kN
4.Truss: method of jointsHard
Use the method of joints to find the force FBC in member BC. Give tension as positive and compression as negative.
span = 8 mheight = 2 mB is 6 m from Avertical load = 40 kNhorizontal load = 30 kN →
FBC = kN
5.Shear force & bending momentMedium
Find the shear force Vx at the section x = 2.5 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 8 mw = 2 kN/m from 0 to 8 mx = 2.5 m
Vx = kN
6.Shear force & bending momentHard
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
30 kN @ 0 m50 kN @ 12 m15 kN @ 6 m
1A (x = 0 m)
2B (x = 2 m)
3C (x = 4 m)
4D (x = 6 m)
5E (x = 8 m)
6F (x = 10 m)
7G (x = 12 m)
7.Beam deflectionMedium
A cantilever carries a uniformly distributed load w over its whole length. Find the deflection δ at the free end.
w = 8 kN/mL = 3 mE = 70 GPa (aluminium)I = 84 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w and a point load P at midspan. Using superposition, find the midspan deflection δmax.
P = 2 kNw = 8 kN/mL = 8 mE = 70 GPa (aluminium)I = 120 × 10⁶ mm⁴
δmax = mm
9.Column bucklingMedium
A column of length L made of aluminium is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 1 mE = 70 GPa (aluminium)b × h = 20 × 100 mm
Pcr = kN
10.Column bucklingHard
A solid round column of length L made of aluminium is pinned at both ends. It must carry 60 kN with a factor of safety of 3 against buckling. Find the smallest diameter d.
P = 60 kNn = 3L = 1.5 mE = 70 GPa (aluminium)
d = mm
11.Centroid & second moment of areaMedium
A 200 mm × 150 mm plate has a circular hole of diameter 60 mm on its vertical centre line, with its centre 45 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 200 mmh = 150 mmd = 60 mmhole centre: y = 45 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A symmetric I-section has flanges 140 mm wide and 22 mm thick, an overall depth of 500 mm and a web 10 mm thick. It carries a bending moment of 80 kN·m about the axis x. Find the size of the bending stress σj at the junction of the web and the top flange.
A 4.5 m thick overconsolidated clay layer has Cc = 0.5, Cr = 0.04 and e₀ = 0.95. At its mid-depth the effective vertical stress is 120 kPa and the preconsolidation pressure is 170 kPa. A new building adds 100 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 7 m thick has a coefficient of consolidation cv = 3 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?
A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 2 m wide sits in the wall of a tank of seawater, with its top edge 0.5 m below the surface. Find the resultant hydrostatic force F on the gate.
Water flows at 60 L/s through a pipe 1000 m long with an inside diameter of 200 mm. Use the Darcy friction factor f = 0.02 and g = 9.81 m/s². Find the friction head loss hf.
A pipe 100 m long with an inside diameter of 200 mm (Darcy friction factor f = 0.015) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each) and a valve (K = 5). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 50 L/s?
A concrete storm sewer with an inside diameter of 750 mm flows half full. Manning n = 0.013 and the slope is S = 0.003. Find the flow rate Q in m³/s.
D = 750 mmn = 0.013S = 0.003
Q = m³/s
22.Open-channel flow (Manning)Hard
A concrete sewer with an inside diameter of 600 mm (Manning n = 0.013) must reach a self-cleansing velocity of 1.2 m/s when flowing just full. Find the minimum slope S (in m/m).
D = 600 mmn = 0.013V = 1.2 m/s
S = m/m
23.Pumps & pump powerMedium
A pump with an efficiency of 70% delivers 150 L/s of water (ρ = 1000 kg/m³) against a head of 64 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.
Q = 150 L/sH = 64 mη = 70%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
A pump moves 120 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 26 m higher. The pipe is 150 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.015; the minor-loss coefficients add up to ΣK = 5 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 200 kPa. Find the head H the pump must add.
You need €15 000 in 4 years. An account pays 3.6% per year, compounded quarterly. How much must you deposit today? Find the present value PV.
FV = €15 0003.6% / 4n = 4
PV = €
26.Time value of moneyHard
You borrow €15 000 at 4.8% per year, compounded monthly, and repay €450 at the end of every month. How many months does it take until the loan is repaid (the last payment may be smaller)? Give the number of payments N.
P = €15 000A = €4504.8% / 12
N = payments
27.NPV & IRRMedium
An investment of €30 000 gives these cash flows at the end of years 1 to 4: €12 000, €9 000, €7 000, €8 000. The cost of capital is 6%. Find the net present value NPV.
A project costs €20 000 and returns €9 000, €7 500, €12 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
CF0 = −20 000CF1 = 9 000CF2 = 7 500CF3 = 12 500
IRR = %
29.Normal distributionMedium
The delivery times are normally distributed with mean 32 min and standard deviation 6 min. What fraction lies between 32 and 37.1 min? Give P as a decimal.
μ = 32σ = 6x1 = 32x2 = 37.1
P =
30.Normal distributionHard
The heights X of men and Y of women in a group are independent and normal: X has mean 180 cm and standard deviation 10 cm, Y has mean 170 cm and standard deviation 12 cm. Find the probability P that X is greater than Y. Round z to two decimals.
μX = 180 cm, σX = 10 cmμY = 170 cm, σY = 12 cm
P =
3Solutions
1.Beam support reactions
Answer: RB = 42.5 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·8 = 50·2 + 60·4
RB = 340/8 = 42.5 kN
ΣFy = 0: RA = 110 − 42.5 = 67.5 kN
Answer
RB = 42.5 kN
2.Beam support reactions
Answer: RD = 24 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation. An internal hinge cannot carry a bending moment, which gives one extra equation: the moment about the hinge of the forces on either side is zero.
Part CD
The hinge has no moment, so moments about C on CD alone must balance.
ΣMC = 0: RD·5 = 40·3
RD = 24 kN
VC = 40 − 24 = 16 kN
Answer
RD = 24 kN
3.Truss: method of joints
Answer: FAC = 10 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·5 = 50·4 → Cy = 40 kN
ΣFy = 0: Ay = 50 − 40 = 10 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
sin γ = 4/4.123 = 0.9701, cos γ = 1/4.123 = 0.2425
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·8 = 40·6 + 30·2 → Cy = 37.5 kN
ΣFy = 0: Ay = 40 − 37.5 = 2.5 kN
ΣFx = 0: Ax = −30 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
sin γ = 2/2.828 = 0.7071, cos γ = 2/2.828 = 0.7071
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 2·8 = 16 kN, acting at x̄ = 4 m
ΣMA = 0: RB·8 = 2·8·4
RB = 64/8 = 8 kN
ΣFy = 0: RA = 16 − 8 = 8 kN
Cut at x = 2.5 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
V = RA − (all downward loads left of the cut)
Vx = 8 − 2·2.5 = 3 kN
Answer
Vx = 3 kN
6.Shear force & bending moment
Answer: E (x = 8 m)
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 11.67 kN, R2 = 83.33 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = −60, MC = −96.67, MD = −133.3, ME = −200 kN·m, MF = −100, MG = 0
Answer
Mark E: ME = −200 kN·m
7.Beam deflection
Answer: δ = 13.78 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
w = 8 N/mm, L = 3000 mm
EI = 5.88 × 10¹² N·mm²
Deflection
δ = wL⁴/(8EI) = 8·3000⁴/(8·5.88 × 10¹²) = 13.78 mm
Answer
δ = 13.78 mm
8.Beam deflection
Answer: δmax = 53.33 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 2000 N, w = 8 N/mm, L = 8000 mm, EI = 8.4 × 10¹² N·mm²
Each load on its own
δP = PL³/(48EI) = 2000·8000³/(48·8.4 × 10¹²) = 2.54 mm
δw = 5wL⁴/(384EI) = 5·8·8000⁴/(384·8.4 × 10¹²) = 50.79 mm
Add them
δmax = 2.54 + 50.79 = 53.33 mm
Answer
δmax = 53.33 mm
9.Column buckling
Answer: Pcr = 94 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Required critical load
Pcr = n·P = 3·60000 = 180000 N
KL = 1·1500 = 1500 mm
Solve for the diameter
d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·180000·1500²/(π³·70000))^(1/4) = 58.79 mm
Answer
d = 58.79 mm
Check: the slenderness KL/r is 102.1, so the column is slender and Euler applies.
11.Centroid & second moment of area
Answer: Ix = 52.8 × 10⁶ mm⁴
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (30000·75 − 2827·45)/(30000 − 2827) = 78.12 mm
Full plate about ȳ
200·150³/12 + 30000·−3.122² = 56.54 × 10⁶ mm⁴
Hole about ȳ
π·60⁴/64 + 2827·−33.12² = 3.738 × 10⁶ mm⁴
Subtract
Ix = 52.8 × 10⁶ mm⁴
Answer
Ix = 52.8 × 10⁶ mm⁴
12.Centroid & second moment of area
Answer: σj = 42.31 MPa
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Outer rectangle minus the two side cut-outs
Both cut-outs together are (B − tw) wide and hw = H − 2tf high, and share the axis x.
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·zw + γsat·(z − zw) = 15·2 + 20·1 = 50 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·1 = 9.81 kPa
Effective stress
σ′ = σ − u = 50 − 9.81 = 40.19 kPa
Answer
σ′ = 40.19 kPa
14.Effective stress in soil
Answer: σ = 115 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·3 + γsat,sand·1 + γsat,clay·3
σ = 15·3 + 19·1 + 17·3 = 115 kPa
Answer
σ = 115 kPa
15.Consolidation settlement
Answer: S = 143.2 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 120 + 100 = 220 kPa > 170 kPa
Settlement
Recompression up to σ′p, virgin compression beyond it.
S = 0.04·4.5/(1 + 0.95)·log₁₀(170/120) + 0.5·4.5/(1 + 0.95)·log₁₀(220/170)
S = 13.96 + 129.2 = 143.2 mm
Answer
S = 143.2 mm
16.Consolidation settlement
Answer: t = 4.688 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H = 7 m
Time
t = Tv·Hdr²/cv = 0.287·7²/3 = 4.688 years
Answer
t = 4.688 years
17.Hydrostatic force
Answer: F = 147.2 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1.5 + 2/2 = 2.5 m
A = H·b = 2·3 = 6 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·2.5·6 = 147.2 kN
Answer
F = 147.2 kN
18.Hydrostatic force
Answer: F = 120.7 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 0.5 + 3/2 = 2 m
A = H·b = 3·2 = 6 m²
Resultant force
F = ρ·g·yc·A = 1025·9.81·2·6 = 120.7 kN
Answer
F = 120.7 kN
19.Pipe friction & head loss
Answer: hf = 18.59 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Mean velocity
A = π·0.2²/4 = 0.03142 m²
V = Q/A = 0.06/0.03142 = 1.91 m/s
Velocity head
V²/(2g) = 1.91²/(2·9.81) = 0.1859 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.02·(1000/0.2)·1.91²/(2·9.81) = 18.59 m
Answer
hf = 18.59 m
20.Pipe friction & head loss
Answer: H = 1.924 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.05/0.03142 = 1.592 m/s
V²/(2g) = 0.1291 m
Loss coefficients
f·L/D = 0.015·100/0.2 = 7.5
ΣK = 0.5 + 3·0.3 + 5 = 6.4
Energy equation
The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.
H = (1 + 7.5 + 6.4)·0.1291 = 1.924 m
Answer
H = 1.924 m
21.Open-channel flow (Manning)
Answer: Q = 0.3049 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = 0.2209 m², R = D/4 = 0.1875 m
Velocity
V = (1/0.013)·0.18752/3·0.0031/2 = 1.38 m/s
Flow rate
Q = A·V = 0.2209·1.38 = 0.3049 m³/s
Answer
Q = 0.3049 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.003053 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Hydraulic radius
R = D/4 = 0.6/4 = 0.15 m
Solve Manning for S
S = (n·V/R2/3)² = (0.013·1.2/0.2823)² = 0.003053
Answer
S = 0.003053
That is a fall of 3.053 m per kilometre.
23.Pumps & pump power
Answer: Pshaft = 134.5 kW
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.15·64 = 94.18 kW
Shaft power
Pshaft = Ph/η = 94.18/0.7 = 134.5 kW
Answer
Pshaft = 134.5 kW
24.Pumps & pump power
Answer: H = 50.65 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are practically at rest, so there is no velocity head term.
H = Δz + p/(ρ·g) + hL = 26 + 20.39 + 4.264 = 50.65 m
Answer
H = 50.65 m
25.Time value of money
Answer: PV = 12997 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rate and number of periods
i = 0.036000000000000004/4 = 0.009
N = 4·4 = 16
Present value
PV = FV/(1 + i)N = 15 000/1.154 = €12 996.69
Answer
PV = €12 996.69
26.Time value of money
Answer: N = 36 payments
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rearrange the annuity formula
i = 0.004
(1 + i)−N = 1 − 15 000·0.004/450 = 0.8667
Solve with logarithms
N = −ln(0.8667)/ln(1.004) = 35.85
Round up to whole payments
35 full payments leave a small balance, which the last, smaller payment clears.
N = 36
Answer
N = 36 payments
27.NPV & IRR
Answer: NPV = 1545 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −30 000
CF1/(1 + 0.06)1 = 12 000/1.06 = 11 320.75
CF2/(1 + 0.06)2 = 9 000/1.124 = 8 009.97
CF3/(1 + 0.06)3 = 7 000/1.191 = 5 877.33
CF4/(1 + 0.06)4 = 8 000/1.262 = 6 336.75
Add them up
NPV = €1 544.81
Answer
NPV = €1 544.81
NPV is positive, so the project earns more than the required return.
28.NPV & IRR
Answer: IRR = 19.83 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(15%) = 1 716.12
NPV(20%) = −57.87
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z-scores
z₁ = (32 − 32)/6 = 0
z₂ = (37.1 − 32)/6 = 0.85
Area between
P = Φ(0.85) − Φ(0) = 0.8023 − 0.5 = 0.3023
Answer
P = 0.3023
30.Normal distribution
Answer: P = 0.7389
Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).
Distribution of the difference
μ = 180 − 170 = 10 cm, σ = 15.62 cm
Standardise
z = (0 − 10)/15.62 = −0.64
Probability
P = 1 − Φ(−0.64) = 0.7389
Answer
P = 0.7389
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.