1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 60 kNP2​ = 10 kNABRA​ = ?RB​2 m2 m4 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.

L = 8 mP1 = 60 kN at 2 mP2 = 10 kN at 4 m
RA = kN
2.Beam support reactionsHard
w0​ = 10 kN/mP = 60 kNABMA​ = ?5 m5 m

The cantilever beam is fixed to the wall at A. It carries a linearly varying load that is zero at the wall and rises to 10 kN/m at the free end B, plus a point load P at 5 m from the wall. Find the magnitude of the reaction moment MA at the wall.

L = 10 mw0 = 10 kN/mP = 60 kN at 5 m
MA = kN·m
3.Truss: method of jointsMedium
ABCDEFGH10 kN40 kN4 × 3 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

F: 10 kN ↓G: 40 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
4.Truss: method of jointsHard
ABBCACACB15 kN10 kN4 m3 m4 m

Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.

span = 4 mheight = 4 mB is 3 m from Avertical load = 15 kNhorizontal load = 10 kN ←
FAB = kN
5.Shear force & bending momentMedium
20 kN15 kNABCDEFG2 m2 m2 m2 m2 m2 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

20 kN @ 2 m15 kN @ 6 m
  1. 1A (x = 0 m)
  2. 2B (x = 2 m)
  3. 3C (x = 4 m)
  4. 4D (x = 6 m)
  5. 5E (x = 8 m)
  6. 6F (x = 10 m)
  7. 7G (x = 12 m)
6.Shear force & bending momentHard
35 kN15 kNABCDEFG2 m2 m2 m2 m2 m2 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

35 kN @ 12 m15 kN @ 2 m
  1. 1A (x = 0 m)
  2. 2B (x = 2 m)
  3. 3C (x = 4 m)
  4. 4D (x = 6 m)
  5. 5E (x = 8 m)
  6. 6F (x = 10 m)
  7. 7G (x = 12 m)
7.Beam deflectionMedium
P = 28 kNABδ1.5 m2.5 m

A simply supported beam carries a point load P at a = 1.5 m from support A. Find the deflection δP under the load.

P = 28 kNa = 1.5 mL = 4 mE = 11 GPa (timber)I = 120 × 10⁶ mm⁴
δP = mm
8.Beam deflectionHard
w = 2.5 kN/mABδ3.5 m

A simply supported timber beam of rectangular section, 50 mm wide, carries a uniformly distributed load w over its whole span. Its midspan deflection may not exceed span/250. Find the smallest depth hreq of the section.

w = 2.5 kN/mL = 3.5 mE = 11 GPa (timber)b = 50 mm
hreq = mm
9.Column bucklingMedium
PL = 6 m50 × 60 mmcross-section

A column of length L made of steel is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 6 mE = 200 GPa (steel)b × h = 50 × 60 mm
Pcr = kN
10.Column bucklingHard
PL = 1 md = 50 mmcross-section

A column of length L made of steel is fixed at the base and free at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 1 mE = 200 GPa (steel)d = 50 mm
σcr = MPa
11.Centroid & second moment of areaMedium
150 mm150 mm60 mmØ30xIx​ = ?

A 150 mm × 150 mm plate has a circular hole of diameter 30 mm on its vertical centre line, with its centre 60 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 150 mmh = 150 mmd = 30 mmhole centre: y = 60 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
1002024010xM = 30 kN·mdimensions in mm

The T-section is used as a beam with the flange on top and carries a sagging bending moment of 30 kN·m. Find the size of the bending stress σtop at the top edge.

bf = 100 mmtf = 20 mmtw = 10 mmhw = 240 mmM = 30 kN·m
σtop = MPa
13.Effective stress in soilMedium
sandγd​ = 16.5 kN/m³γsat​ = 20.5 kN/m³14 mwater tableXz = 9 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 9 mzw = 1 mγw = 9.81 kN/m³sand: γd = 16.5 kN/m³sand: γsat = 20.5 kN/m³
σ = kPa
14.Effective stress in soilHard
sandγd​ = 16.5 kN/m³γsat​ = 19.5 kN/m³6 mclayγsat​ = 18.5 kN/m³7 mwater tableXz = 9.5 m

For the soil profile shown, find the pore water pressure u at point X.

z = 9.5 mzw = 4 mγw = 9.81 kN/m³sand: γd = 16.5 kN/m³sand: γsat = 19.5 kN/m³clay: γsat = 18.5 kN/m³
u = kPa
15.Consolidation settlementMedium
Δσ = 15 kPasandclayCc​ = 0.5, Cr​ = 0.03e0​ = 0.65σ′0​ = 55 kPaσ′p​ = 85 kPa4 mwater table

A 4 m thick overconsolidated clay layer has Cc = 0.5, Cr = 0.03 and e₀ = 0.65. At its mid-depth the effective vertical stress is 55 kPa and the preconsolidation pressure is 85 kPa. A new building adds 15 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 4 mCc = 0.5Cr = 0.03e0 = 0.65σ′0 = 55 kPaσ′p = 85 kPaΔσ = 15 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 3.5 mcv​ = 1.2 m²/year3.5 msandwater table

A clay layer 3.5 m thick has a coefficient of consolidation cv = 1.2 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 80% average consolidation the time factor is Tv = 0.567. How many years t does the layer take to reach 80% consolidation?

H = 3.5 mcv = 1.2 m²/yearU = 80%Tv = 0.567double drainage
t = years
17.Hydrostatic forceMedium
gated = 1.5 mH = 2.5 m

A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1.5 mH = 2.5 mb = 3 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 0.5 mH = 2 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of glycerin, with its top edge 0.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 0.5 mH = 2 mb = 2 mρ = 1260 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
V = 2.4 m/sD = 300 mmL = 400 mf = 0.022

Water (ρ = 1000 kg/m³) flows at 2.4 m/s through a horizontal pipe, 400 m long, with an inside diameter of 300 mm. Use the Darcy friction factor f = 0.022 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 2.4 m/sL = 400 mD = 300 mmf = 0.022ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 5Δz = ?L = 100 m, D = 100 mm, f = 0.0252× bend (K = 0.3)

Two open reservoirs are joined by a pipe 100 m long with an inside diameter of 100 mm and a Darcy friction factor f = 0.025. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 8 L/s?

Q = 8 L/sL = 100 mD = 100 mmf = 0.025Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 5Kexit = 1.0
Δz = m
21.Open-channel flow (Manning)Medium
b = 1 my = 2.2 mn = 0.012, S = 0.002

A rectangular finished concrete channel is 1 m wide. Water flows uniformly 2.2 m deep. Manning n = 0.012 and the bed slope is S = 0.002. Find the flow rate Q in m³/s.

b = 1 my = 2.2 mn = 0.012S = 0.002
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 5 my = 0.7 m1 : 1n = 0.03, Q = 2.9 m³/s

A trapezoidal grass-lined earth channel with a bottom width of 5 m and side slopes of 1:1 (horizontal:vertical) must carry 2.9 m³/s in uniform flow at a depth of 0.7 m. Manning n = 0.03. Find the required bed slope S (in m/m).

Q = 2.9 m³/sb = 5 my = 0.7 mz = 1n = 0.03
S = m/m
23.Pumps & pump powerMedium
PQ = 50 L/sH = 70 m

A pump with an efficiency of 85% delivers 50 L/s of water (ρ = 1000 kg/m³) against a head of 70 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.

Q = 50 L/sH = 70 mη = 85%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
400 kPa (gauge)PQ = 50 L/sΔz = 29 mL = 150 m, D = 150 mm, f = 0.025, ΣK = 8

A pump moves 50 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 29 m higher. The pipe is 150 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.025; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 400 kPa. Find the head H the pump must add.

Q = 50 L/sΔz = 29 mL = 150 mD = 150 mmf = 0.025ΣK = 8ptank = 400 kPa
H = m
25.Time value of moneyMedium
years0123…10PV = ?€10 000

You need €10 000 in 10 years. An account pays 6% per year, compounded monthly. How much must you deposit today? Find the present value PV.

FV = €10 0006% / 12n = 10
PV = €
26.Time value of moneyHard
months0123…192€100€100€100FV = ?

You save €100 at the end of every month for 16 years. The account pays 4.2% per year, compounded monthly. How much have you saved at the end? Find FV.

A = €1004.2% / 12N = 192
FV = €
27.NPV & IRRMedium
years0123…9−200 00013 000+3%+3%…r = 8%, NPV = ?

A project costs €200 000 today. It generates €13 000 at the end of the first year, and the cash flow then grows by 3% per year forever. The cost of capital is 8%. Find the net present value NPV.

C0 = €200 000CF1 = €13 000g = 3%r = 8%
NPV = €
28.NPV & IRRHard
years0123−20 00014 0008 50014 500

A project costs €20 000 and returns €14 000, €8 500, €14 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.

CF0 = −20 000CF1 = 14 000CF2 = 8 500CF3 = 14 500
IRR = %
29.Normal distributionMedium
22.743.1P = ?

The delivery times are normally distributed with mean 32 min and standard deviation 6 min. What fraction lies between 22.7 and 43.1 min? Give P as a decimal.

μ = 32σ = 6x1 = 22.7x2 = 43.1
P =
30.Normal distributionHard
157164171178185192199cmbottom 20%

The heights of adult men are normally distributed with mean 178 cm and standard deviation 7 cm. Drag the cut-off so the shaded bottom 20% is to the left of it. Find the cut-off x.

μ = 178 cmσ = 7 cm20%
x = cm

3Solutions

1.Beam support reactions

Answer: RA = 50 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

P1​ = 60 kNP2​ = 10 kNABRA​RB​2 m2 m4 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·8 = 60·2 + 10·4
RB = 160/8 = 20 kN
ΣFy = 0: RA = 70 − 20 = 50 kN

Answer

RA = 50 kN
2.Beam support reactions

Answer: MA = 633.3 kN·m

Cantilever equilibrium: a fixed support can push up and also resist rotation, so it gives a vertical reaction RA and a reaction moment MA. ΣFy = 0 gives RA, and moments about the wall give MA = Σ(load × distance from the wall). A distributed load acts as its resultant at the centroid of the load diagram.

Resultant of the triangular load

W = ½·10·10 = 50 kN
x̄ = 2L/3 = 6.667 m

Moment about the wall

MA = W·x̄ + P·a = 50·6.667 + 60·5 = 633.3 kN·m

Answer

MA = 633.3 kN·m
3.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 20.63 kN (T), BC: 33.75 kN (T), CD: 33.75 kN (T), DE: 16.87 kN (T), FG: 20.63 kN (C), GH: 16.87 kN (C), AF: 34.38 kN (C), HE: 28.12 kN (C), BF: 17.5 kN (T), CG: 0, DH: 22.5 kN (T), BG: 21.88 kN (C), DG: 28.13 kN (C)

Answer

Zero-force member: CG
4.Truss: method of joints

Answer: FAB = −17.19 kN

Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.

ABBCACACB15 kN10 kNAy​Cy​Ax​

Support reactions

Equilibrium of the whole truss. Moments about A, counter-clockwise positive.

ΣMA = 0: Cy·4 = 15·3 − 10·4 → Cy = 1.25 kN
ΣFy = 0: Ay = 15 − 1.25 = 13.75 kN
ΣFx = 0: Ax = 10 kN

Joint A

Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.

sin α = 4/5 = 0.8
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −13.75/0.8 = −17.19 kN

Answer

FAB = −17.19 kN (compression)
5.Shear force & bending moment

Answer: D (x = 6 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 24.17 kN, R2 = 10.83 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 48.33, MC = 56.67, MD = 65 kN·m, ME = 43.33, MF = 21.67, MG = 0

Answer

Mark D: MD = 65 kN·m
6.Shear force & bending moment

Answer: F (x = 10 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 5 kN, R2 = 45 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 10, MC = −10, MD = −30, ME = −50, MF = −70 kN·m, MG = 0

Answer

Mark F: MF = −70 kN·m
7.Beam deflection

Answer: δP = 24.86 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 28000 N, a = 1500 mm, b = 2500 mm, L = 4000 mm
EI = 1.32 × 10¹² N·mm²

Deflection under the load

δP = Pa²b²/(3EIL) = 28000·1500²·2500²/(3·1.32 × 10¹²·4000) = 24.86 mm

Answer

δP = 24.86 mm
8.Beam deflection

Answer: hreq = 196.7 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 2.5 N/mm, L = 3500 mm, E = 11000 N/mm²

Deflection limit

δallow = L/250 = 3500/250 = 14 mm

Required second moment of area

Ireq = 5wL⁴/(384·E·δallow) = 5·2.5·3500⁴/(384·11000·14) = 3.172 × 10⁷ mm⁴

Required depth

bh³/12 = Ireq → h = (12·3.172 × 10⁷/50)1/3 = 196.7 mm

Answer

hreq = 196.7 mm

In practice, choose the next standard depth above this value.

9.Column buckling

Answer: Pcr = 69.94 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A rectangle buckles about its weak axis, using the smaller dimension cubed.

Imin = h·b³/12 = 60·50³/12 = 625000 mm⁴

Effective length

KL = 0.7·6000 = 4200 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·625000/4200² = 69938 N = 69.94 kN

Answer

Pcr = 69.94 kN
10.Column buckling

Answer: σcr = 77.11 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·50⁴/64 = 306796 mm⁴

Radius of gyration and slenderness

A = 1963 mm²
r = √(I/A) = √(306796/1963) = 12.5 mm
KL = 2·1000 = 2000 mm
KL/r = 2000/12.5 = 160

Critical stress

σcr = π²E/(KL/r)² = π²·200000/160² = 77.11 MPa

Answer

σcr = 77.11 MPa
11.Centroid & second moment of area

Answer: Ix = 41.98 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (22500·75 − 706.9·60)/(22500 − 706.9) = 75.49 mm

Full plate about ȳ

150·150³/12 + 22500·−0.4865² = 42.19 × 10⁶ mm⁴

Hole about ȳ

π·30⁴/64 + 706.9·−15.49² = 0.2093 × 10⁶ mm⁴

Subtract

Ix = 41.98 × 10⁶ mm⁴

Answer

Ix = 41.98 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: σtop = 80.85 MPa

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 100·20 = 2000 mm², yf = 240 + 20/2 = 250 mm
web: Aw = 10·240 = 2400 mm², yw = 240/2 = 120 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (2000·250 + 2400·120)/4400 = 179.1 mm

Parallel-axis theorem

flange: 100·20³/12 + 2000·(250 − 179.1)² = 1.012 × 10⁷ mm⁴
web: 10·240³/12 + 2400·(120 − 179.1)² = 1.99 × 10⁷ mm⁴
Ix = 1.012 × 10⁷ + 1.99 × 10⁷ = 3.002 × 10⁷ mm⁴

Bending stress

The top edge is h − ȳ from the axis.

y = 260 − 179.1 = 80.91 mm
σ = M·y/I = 3 × 10⁷·80.91/3.002 × 10⁷ = 80.85 MPa

Answer

σtop = 80.85 MPa
13.Effective stress in soil

Answer: σ = 180.5 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 16.5·1 + 20.5·8 = 180.5 kPa

Answer

σ = 180.5 kPa
14.Effective stress in soil

Answer: u = 53.96 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·5.5 = 53.96 kPa

Answer

u = 53.96 kPa
15.Consolidation settlement

Answer: S = 7.617 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 55 + 15 = 70 kPa ≤ 85 kPa

Settlement

The clay stays on its recompression line.

S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.03·4/(1 + 0.65)·log₁₀(70/55) = 7.617 mm

Answer

S = 7.617 mm
16.Consolidation settlement

Answer: t = 1.447 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H/2 = 3.5/2 = 1.75 m

Time

t = Tv·Hdr²/cv = 0.567·1.75²/1.2 = 1.447 years

Answer

t = 1.447 years
17.Hydrostatic force

Answer: F = 202.3 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1.5 + 2.5/2 = 2.75 m
A = H·b = 2.5·3 = 7.5 m²
gated = 1.5 mH = 2.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2.75·7.5 = 202.3 kN

Answer

F = 202.3 kN
18.Hydrostatic force

Answer: F = 74.16 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 0.5 + 2/2 = 1.5 m
A = H·b = 2·2 = 4 m²
gated = 0.5 mH = 2 mF

Resultant force

F = ρ·g·yc·A = 1260·9.81·1.5·4 = 74.16 kN

Answer

F = 74.16 kN
19.Pipe friction & head loss

Answer: Δp = 84.48 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.022·(400/0.3)·2.4²/(2·9.81) = 8.612 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·8.612 = 84480 Pa = 84.48 kPa

Answer

Δp = 84.48 kPa
20.Pipe friction & head loss

Answer: Δz = 1.697 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.008/0.007854 = 1.019 m/s
V²/(2g) = 0.05288 m

Loss coefficients

f·L/D = 0.025·100/0.1 = 25
ΣK = 0.5 + 2·0.3 + 5 + 1.0 = 7.1

Total head loss

hf = 25·0.05288 = 1.322 m
hm = 7.1·0.05288 = 0.3755 m
Δz = hf + hm = 1.697 m

Answer

Δz = 1.697 m
21.Open-channel flow (Manning)

Answer: Q = 4.506 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 1·2.2 = 2.2 m²
P = b + 2y = 1 + 2·2.2 = 5.4 m
R = A/P = 0.4074 m

Velocity

V = (1/0.012)·0.40742/3·0.0021/2 = 2.048 m/s

Flow rate

Q = A·V = 2.2·2.048 = 4.506 m³/s

Answer

Q = 4.506 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.001002 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (5 + 1·0.7)·0.7 = 3.99 m²
P = b + 2y·√(1 + z²) = 5 + 2·0.7·√(1 + 1²) = 6.98 m
R = A/P = 0.5716 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.03·2.9/(3.99·0.6888) = 0.03166
S = 0.03166² = 0.001002

Answer

S = 0.001002

That is a fall of 1.002 m per kilometre.

23.Pumps & pump power

Answer: Pshaft = 40.39 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.05·70 = 34.34 kW

Shaft power

Pshaft = Ph/η = 34.34/0.85 = 40.39 kW

Answer

Pshaft = 40.39 kW
24.Pumps & pump power

Answer: H = 83.24 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.05/0.01767 = 2.829 m/s
V²/(2g) = 0.408 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (25 + 8)·0.408 = 13.47 m

Pressure head

p/(ρ·g) = 400000/(1000·9.81) = 40.77 m

Pump head

Both surfaces are practically at rest, so there is no velocity head term.

H = Δz + p/(ρ·g) + hL = 29 + 40.77 + 13.47 = 83.24 m

Answer

H = 83.24 m
25.Time value of money

Answer: PV = 5496 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate and number of periods

i = 0.06/12 = 0.005
N = 12·10 = 120

Present value

PV = FV/(1 + i)N = 10 000/1.819 = €5 496.33

Answer

PV = €5 496.33
26.Time value of money

Answer: FV = 27310 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly rate and number of deposits

i = 0.042/12 = 0.0035
N = 12·16 = 192

Future value of the deposits

FV = A·((1 + i)N − 1)/i = 100·(1.956 − 1)/0.0035 = €27 310.10

Answer

FV = €27 310.10

You paid in €19 200 yourself; the rest is interest.

27.NPV & IRR

Answer: NPV = 60000 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Value of the cash flows

PV = 13 000/(0.08 − 0.03) = 260 000.00

NPV

NPV = 260 000.00 − 200 000 = €60 000.00

Answer

NPV = €60 000.00

NPV is positive, so the project earns more than the required return.

28.NPV & IRR

Answer: IRR = 38.49 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(35%) = 927.70
NPV(40%) = −379.01

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 35 + 5·927.70/(927.70 − (−379.01)) = 38.55%
exact: NPV(38.49%) = 0 → IRR = 38.49%

Answer

IRR = 38.49%
29.Normal distribution

Answer: P = 0.9073

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z-scores

z₁ = (22.7 − 32)/6 = −1.55
z₂ = (43.1 − 32)/6 = 1.85

Area between

P = Φ(1.85) − Φ(−1.55) = 0.9678 − 0.06057 = 0.9073

Answer

P = 0.9073
30.Normal distribution

Answer: x = 172.1 cm

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left

Φ(z) = 0.2

z from the table

z ≈ −0.84

Back to the original units

x = 178 − 0.84·7 = 172.1 cm

Answer

x = 172.1 cm