1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 40 kNP2​ = 35 kNABRA​ = ?RB​1 m3 m1 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.

L = 5 mP1 = 40 kN at 1 mP2 = 35 kN at 4 m
RA = kN
2.Beam support reactionsHard
w = 3 kN/mP = 40 kNABRA​ = ?RB​1 m2 m0.5 m2.5 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.

L = 6 mP = 40 kN at 3.5 mw = 3 kN/m from 1 to 3 m
RA = kN
3.Truss: method of jointsMedium
ABCDEFGH35 kN40 kN20 kN4 × 3 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 35 kN ↓C: 40 kN ↓G: 20 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
4.Truss: method of jointsHard
ABCDEFGH30 kN30 kN4 × 4 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

F: 30 kN ↓F: 30 kN →
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
5.Shear force & bending momentMedium
15 kN/m10 kNABCDEFG2 m2 m2 m2 m2 m2 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

10 kN @ 10 m15 kN/m, 0–12 m
  1. 1A (x = 0 m)
  2. 2B (x = 2 m)
  3. 3C (x = 4 m)
  4. 4D (x = 6 m)
  5. 5E (x = 8 m)
  6. 6F (x = 10 m)
  7. 7G (x = 12 m)
6.Shear force & bending momentHard
w = 6 kN/mAB3 m2 m

The simply supported beam carries a uniformly distributed load over part of its span. Find the maximum bending moment Mmax in the beam.

L = 5 mw = 6 kN/m from 0 to 3 m
Mmax = kN·m
7.Beam deflectionMedium
w = 2 kN/mδL = 3 m

A cantilever carries a uniformly distributed load w over its whole length. Find the deflection δ at the free end.

w = 2 kN/mL = 3 mE = 70 GPa (aluminium)I = 84 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
w = 2 kN/mABδ5 m

A simply supported timber beam of rectangular section, 125 mm wide, carries a uniformly distributed load w over its whole span. Its midspan deflection may not exceed span/360. Find the smallest depth hreq of the section.

w = 2 kN/mL = 5 mE = 11 GPa (timber)b = 125 mm
hreq = mm
9.Column bucklingMedium
PL = 2 md = 80 mmcross-section

A column of length L made of aluminium is fixed at the base and free at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 2 mE = 70 GPa (aluminium)d = 80 mm
Pcr = kN
10.Column bucklingHard
PL = 4 md = 25 mmcross-section

A column of length L made of steel is fixed at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 4 mE = 200 GPa (steel)d = 25 mm
σcr = MPa
11.Centroid & second moment of areaMedium
160360168xdimensions in mm

A symmetric I-section has flanges 160 mm wide and 16 mm thick, an overall depth of 360 mm and a web 8 mm thick. Find its second moment of area Ix about the horizontal centroidal axis x.

B = 160 mmH = 360 mmtf = 16 mmtw = 8 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
2601530016xM = 5 kN·mdimensions in mm

The T-section is used as a beam with the flange on top and carries a sagging bending moment of 5 kN·m. Find the size of the bending stress σtop at the top edge.

bf = 260 mmtf = 15 mmtw = 16 mmhw = 300 mmM = 5 kN·m
σtop = MPa
13.Effective stress in soilMedium
sandγd​ = 16.5 kN/m³γsat​ = 20 kN/m³11 mwater tableXz = 3 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 3 mzw = 2 mγw = 9.81 kN/m³sand: γd = 16.5 kN/m³sand: γsat = 20 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 15 kN/m³γsat​ = 20 kN/m³4 mclayγsat​ = 19 kN/m³5 mwater tableXz = 6.5 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 6.5 mzw = 2 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 20 kN/m³clay: γsat = 19 kN/m³
σ = kPa
15.Consolidation settlementMedium
Δσ = 200 kPasandclayCc​ = 0.5, Cr​ = 0.04e0​ = 0.6σ′0​ = 50 kPaσ′p​ = 170 kPa6.5 mwater table

A 6.5 m thick overconsolidated clay layer has Cc = 0.5, Cr = 0.04 and e₀ = 0.6. At its mid-depth the effective vertical stress is 50 kPa and the preconsolidation pressure is 170 kPa. A new building adds 200 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 6.5 mCc = 0.5Cr = 0.04e0 = 0.6σ′0 = 50 kPaσ′p = 170 kPaΔσ = 200 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 3 mcv​ = 1.2 m²/year3 mimpervious rockwater table

A clay layer 3 m thick has a coefficient of consolidation cv = 1.2 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 80% average consolidation the time factor is Tv = 0.567. How many years t does the layer take to reach 80% consolidation?

H = 3 mcv = 1.2 m²/yearU = 80%Tv = 0.567single drainage
t = years
17.Hydrostatic forceMedium
gated = 1.5 mH = 2.5 m

A vertical rectangular gate 1 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1.5 mH = 2.5 mb = 1 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 0.5 mH = 2.5 m

A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 0.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 0.5 mH = 2.5 mb = 3 mρ = 1000 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
V = 2.1 m/sD = 75 mmL = 400 mf = 0.022

Water flows at a mean velocity of 2.1 m/s through a pipe 400 m long with an inside diameter of 75 mm. Use the Darcy friction factor f = 0.022 and g = 9.81 m/s². Find the friction head loss hf.

V = 2.1 m/sL = 400 mD = 75 mmf = 0.022g = 9.81 m/s²
hf = m
20.Pipe friction & head lossHard
K = 10Δz = 36 mL = 150 m, D = 300 mm, f = 0.0153× bend (K = 0.3)

Two open reservoirs are joined by a pipe 150 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.015. The water surface of the upper reservoir is 36 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each), a valve (K = 10) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.

Δz = 36 mL = 150 mD = 300 mmf = 0.015Kentrance = 0.5Kbend = 0.3 (×3)Kvalve = 10Kexit = 1.0
Q = L/s
21.Open-channel flow (Manning)Medium
b = 3.5 my = 2 m1 : 1n = 0.022, S = 0.0015

A trapezoidal clean earth channel has a bottom width of 3.5 m and side slopes of 1:1 (horizontal:vertical). Water flows uniformly 2 m deep. Manning n = 0.022 and the bed slope is S = 0.0015. Find the flow rate Q in m³/s.

b = 3.5 my = 2 mz = 1n = 0.022S = 0.0015
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 4 my = 2.3 m3 : 1n = 0.014, Q = 62 m³/s

A trapezoidal unfinished concrete channel with a bottom width of 4 m and side slopes of 3:1 (horizontal:vertical) must carry 62 m³/s in uniform flow at a depth of 2.3 m. Manning n = 0.014. Find the required bed slope S (in m/m).

Q = 62 m³/sb = 4 my = 2.3 mz = 3n = 0.014
S = m/m
23.Pumps & pump powerMedium
PQ = 30 L/sH = 72 m

A pump delivers 30 L/s of water (ρ = 1000 kg/m³) against a head of 72 m. The pump efficiency is 75% and the electric motor driving it has an efficiency of 90%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.

Q = 30 L/sH = 72 mηpump = 75%ηmotor = 90%g = 9.81 m/s²
Pel = kW
24.Pumps & pump powerHard
PQ = 120 L/sΔz = 7 mL = 150 m, D = 250 mm, f = 0.022, ΣK = 2

A pump moves 120 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 7 m higher. The pipe is 150 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.022; the minor-loss coefficients add up to ΣK = 2 (entrance and exit included). Use g = 9.81 m/s². The pump efficiency is 80%. Find the shaft power Pshaft in kW.

Q = 120 L/sΔz = 7 mL = 150 mD = 250 mmf = 0.022ΣK = 2η = 80%
Pshaft = kW
25.Time value of moneyMedium
periods01211 + EAR = ?21% / 2

A credit card charges a nominal interest rate of 21% per year, compounded semi-annually. Find the effective annual rate EAR in percent.

r = 21%m = 2
EAR = %
26.Time value of moneyHard
months0123…N = ?€8 000€200€200€200€2003% / 12

You borrow €8 000 at 3% per year, compounded monthly, and repay €200 at the end of every month. How many months does it take until the loan is repaid (the last payment may be smaller)? Give the number of payments N.

P = €8 000A = €2003% / 12
N = payments
27.NPV & IRRMedium
years012345−60 00014 50014 50014 50014 50029 500

A machine costs €60 000 today. It generates €14 500 at the end of each year for 5 years and can then be sold for €15 000. The cost of capital is 10%. Find the net present value NPV.

C0 = €60 000CF = €14 500S = €15 000n = 5r = 10%
NPV = €
28.NPV & IRRHard
years012−25 00017 00012 000

A project costs €25 000 and returns €17 000, €12 000 at the end of years 1 to 2. Find its internal rate of return IRR in percent.

CF0 = −25 000CF1 = 17 000CF2 = 12 000
IRR = %
29.Normal distributionMedium
750 g762.3 gX + Y?

X is normal with mean 250 g and standard deviation 4 g; Y is independent and normal with mean 500 g and standard deviation 9 g. Find the probability P that X + Y is more than 762.3 g. Round z to two decimals.

μX = 250, σX = 4μY = 500, σY = 9X + Y > 762.3 g
P =
30.Normal distributionHard
μ = 32x = ?97.5%

The delivery times are normally distributed with mean 32 min and standard deviation 6 min. Find the value x below which 97.5% of them lie (the 97.5th percentile).

μ = 32σ = 6P = 97.5%
x = min

3Solutions

1.Beam support reactions

Answer: RA = 39 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

P1​ = 40 kNP2​ = 35 kNABRA​RB​1 m3 m1 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·5 = 40·1 + 35·4
RB = 180/5 = 36 kN
ΣFy = 0: RA = 75 − 36 = 39 kN

Answer

RA = 39 kN
2.Beam support reactions

Answer: RA = 20.67 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

w = 3 kN/mP = 40 kNABRA​RB​1 m2 m0.5 m2.5 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

UDL resultant: W = w·ℓ = 3·2 = 6 kN, acting at x̄ = 2 m
ΣMA = 0: RB·6 = 40·3.5 + 3·2·2
RB = 152/6 = 25.33 kN
ΣFy = 0: RA = 46 − 25.33 = 20.67 kN

Answer

RA = 20.67 kN
3.Truss: method of joints

Answer: member DH

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint D

CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.

ΣF⊥ = 0 → FDH = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 56.25 kN (T), BC: 56.25 kN (T), CD: 38.75 kN (T), DE: 38.75 kN (T), FG: 77.5 kN (C), GH: 77.5 kN (C), AF: 79.55 kN (C), HE: 54.8 kN (C), BF: 35 kN (T), CG: 20 kN (C), DH: 0, FC: 30.05 kN (T), HC: 54.8 kN (T)

Answer

Zero-force member: DH
4.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 52.5 kN (T), BC: 35 kN (T), CD: 35 kN (T), DE: 17.5 kN (T), FG: 52.5 kN (C), GH: 17.5 kN (C), AF: 28.13 kN (C), HE: 21.87 kN (C), BF: 13.13 kN (C), CG: 0, DH: 13.13 kN (T), BG: 21.88 kN (T), DG: 21.88 kN (C)

Answer

Zero-force member: CG
5.Shear force & bending moment

Answer: D (x = 6 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 91.67 kN, R2 = 98.33 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 153.3, MC = 246.7, MD = 280 kN·m, ME = 253.3, MF = 166.7, MG = 0

Answer

Mark D: MD = 280 kN·m
6.Shear force & bending moment

Answer: Mmax = 13.23 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 6·3 = 18 kN, acting at x̄ = 1.5 m
ΣMA = 0: RB·5 = 6·3·1.5
RB = 27/5 = 5.4 kN
ΣFy = 0: RA = 18 − 5.4 = 12.6 kN

Zero shear

The shear force starts at RA, stays constant over any unloaded part and falls with slope w inside the load.

RA − w·(x0 − 0) = 0
x0 = 0 + 12.6/6 = 2.1 m

Maximum moment

Mmax = RA·x0 − w·(x0 − 0)²/2 = 12.6·2.1 − 6·2.1²/2 = 13.23 kN·m

Answer

Mmax = 13.23 kN·m
7.Beam deflection

Answer: δ = 3.444 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 2 N/mm, L = 3000 mm
EI = 5.88 × 10¹² N·mm²

Deflection

δ = wL⁴/(8EI) = 2·3000⁴/(8·5.88 × 10¹²) = 3.444 mm

Answer

δ = 3.444 mm
8.Beam deflection

Answer: hreq = 217.1 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 2 N/mm, L = 5000 mm, E = 11000 N/mm²

Deflection limit

δallow = L/360 = 5000/360 = 13.89 mm

Required second moment of area

Ireq = 5wL⁴/(384·E·δallow) = 5·2·5000⁴/(384·11000·13.89) = 1.065 × 10⁸ mm⁴

Required depth

bh³/12 = Ireq → h = (12·1.065 × 10⁸/125)1/3 = 217.1 mm

Answer

hreq = 217.1 mm

In practice, choose the next standard depth above this value.

9.Column buckling

Answer: Pcr = 86.82 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·80⁴/64 = 2.011 × 10⁶ mm⁴

Effective length

KL = 2·2000 = 4000 mm

Critical load

Pcr = π²EI/(KL)² = π²·70000·2.011 × 10⁶/4000² = 86818 N = 86.82 kN

Answer

Pcr = 86.82 kN
10.Column buckling

Answer: σcr = 19.28 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·25⁴/64 = 19175 mm⁴

Radius of gyration and slenderness

A = 490.9 mm²
r = √(I/A) = √(19175/490.9) = 6.25 mm
KL = 0.5·4000 = 2000 mm
KL/r = 2000/6.25 = 320

Critical stress

σcr = π²E/(KL/r)² = π²·200000/320² = 19.28 MPa

Answer

σcr = 19.28 MPa
11.Centroid & second moment of area

Answer: Ix = 175.1 × 10⁶ mm⁴

Second moment of area: for a rectangle about its own centroidal axis I = bh³/12, and about its base bh³/3 (parallel-axis theorem I = Ic + A·d²). A hole is handled by subtracting its I, as long as both parts share the same axis. The elastic section modulus is S = I/c, where c is the distance to the extreme fibre.

Outer rectangle minus the two side cut-outs

Both cut-outs together are (B − tw) wide and hw = H − 2tf high, and share the axis x.

hw = 360 − 2·16 = 328 mm
Ix = (B·H³ − (B − tw)·hw³)/12 = (160·360³ − 152·328³)/12
Ix = 1.751 × 10⁸ mm⁴ = 175.1 × 10⁶ mm⁴

Answer

Ix = 175.1 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: σtop = 5.277 MPa

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 260·15 = 3900 mm², yf = 300 + 15/2 = 307.5 mm
web: Aw = 16·300 = 4800 mm², yw = 300/2 = 150 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (3900·307.5 + 4800·150)/8700 = 220.6 mm

Parallel-axis theorem

flange: 260·15³/12 + 3900·(307.5 − 220.6)² = 2.952 × 10⁷ mm⁴
web: 16·300³/12 + 4800·(150 − 220.6)² = 5.993 × 10⁷ mm⁴
Ix = 2.952 × 10⁷ + 5.993 × 10⁷ = 8.945 × 10⁷ mm⁴

Bending stress

The top edge is h − ȳ from the axis.

y = 315 − 220.6 = 94.4 mm
σ = M·y/I = 5 × 10⁶·94.4/8.945 × 10⁷ = 5.277 MPa

Answer

σtop = 5.277 MPa
13.Effective stress in soil

Answer: σ′ = 43.19 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 16.5·2 + 20·1 = 53 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·1 = 9.81 kPa

Effective stress

σ′ = σ − u = 53 − 9.81 = 43.19 kPa

Answer

σ′ = 43.19 kPa
14.Effective stress in soil

Answer: σ = 117.5 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·2 + γsat,sand·2 + γsat,clay·2.5
σ = 15·2 + 20·2 + 19·2.5 = 117.5 kPa

Answer

σ = 117.5 kPa
15.Consolidation settlement

Answer: S = 426.6 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 50 + 200 = 250 kPa > 170 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.04·6.5/(1 + 0.6)·log₁₀(170/50) + 0.5·6.5/(1 + 0.6)·log₁₀(250/170)
S = 86.37 + 340.2 = 426.6 mm

Answer

S = 426.6 mm
16.Consolidation settlement

Answer: t = 4.253 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H = 3 m

Time

t = Tv·Hdr²/cv = 0.567·3²/1.2 = 4.253 years

Answer

t = 4.253 years
17.Hydrostatic force

Answer: F = 67.44 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1.5 + 2.5/2 = 2.75 m
A = H·b = 2.5·1 = 2.5 m²
gated = 1.5 mH = 2.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2.75·2.5 = 67.44 kN

Answer

F = 67.44 kN
18.Hydrostatic force

Answer: ycp = 2.048 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 0.5 + 2.5/2 = 1.75 m
A = H·b = 2.5·3 = 7.5 m²
gated = 0.5 mH = 2.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·1.75·7.5 = 128.8 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 3·2.5³/12 = 3.906 m⁴
ycp = yc + Ic/(yc·A) = 1.75 + 3.906/(1.75·7.5) = 2.048 m

Answer

ycp = 2.048 m
19.Pipe friction & head loss

Answer: hf = 26.37 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity head

V²/(2g) = 2.1²/(2·9.81) = 0.2248 m

Darcy–Weisbach

hf = f·(L/D)·V²/(2g) = 0.022·(400/0.075)·2.1²/(2·9.81) = 26.37 m

Answer

hf = 26.37 m
20.Pipe friction & head loss

Answer: Q = 421.1 L/s

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Loss coefficients

f·L/D = 0.015·150/0.3 = 7.5
ΣK = 0.5 + 3·0.3 + 10 + 1.0 = 12.4

Energy equation

Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.

36 = (7.5 + 12.4)·V²/(2·9.81)
V = √(2·9.81·36/19.9) = 5.958 m/s

Flow rate

Q = V·π·D²/4 = 5.958·0.07069 = 0.4211 m³/s = 421.1 L/s

Answer

Q = 421.1 L/s
21.Open-channel flow (Manning)

Answer: Q = 21.88 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (3.5 + 1·2)·2 = 11 m²
P = b + 2y·√(1 + z²) = 3.5 + 2·2·√(1 + 1²) = 9.157 m
R = A/P = 1.201 m

Velocity

V = (1/0.022)·1.2012/3·0.00151/2 = 1.989 m/s

Flow rate

Q = A·V = 11·1.989 = 21.88 m³/s

Answer

Q = 21.88 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.0008021 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (4 + 3·2.3)·2.3 = 25.07 m²
P = b + 2y·√(1 + z²) = 4 + 2·2.3·√(1 + 3²) = 18.55 m
R = A/P = 1.352 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.014·62/(25.07·1.223) = 0.02832
S = 0.02832² = 0.0008021

Answer

S = 0.0008021

That is a fall of 0.8021 m per kilometre.

23.Pumps & pump power

Answer: Pel = 31.39 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.03·72 = 21.19 kW

Shaft power

Pshaft = 21.19/0.75 = 28.25 kW

Electrical power

Pel = 28.25/0.9 = 31.39 kW

Answer

Pel = 31.39 kW
24.Pumps & pump power

Answer: Pshaft = 17.11 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.12/0.04909 = 2.445 m/s
V²/(2g) = 0.3046 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (13.2 + 2)·0.3046 = 4.63 m

Pump head

H = Δz + hL = 7 + 4.63 = 11.63 m

Shaft power

Pshaft = ρ·g·Q·H/η = 1000·9.81·0.12·11.63/0.8 = 17.11 kW

Answer

Pshaft = 17.11 kW
25.Time value of money

Answer: EAR = 22.1 %

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate per period

r/m = 0.21/2 = 0.105

Compound over one year

EAR = (1 + 0.105)2 − 1 = 1.221 − 1 = 22.1%

Answer

EAR = 22.1%

The EAR is always above the nominal rate when interest compounds more than once a year.

26.Time value of money

Answer: N = 43 payments

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rearrange the annuity formula

i = 0.0025
(1 + i)−N = 1 − 8 000·0.0025/200 = 0.9

Solve with logarithms

N = −ln(0.9)/ln(1.002) = 42.2

Round up to whole payments

42 full payments leave a small balance, which the last, smaller payment clears.

N = 43

Answer

N = 43 payments
27.NPV & IRR

Answer: NPV = 4280 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of the yearly cash flows

14 500·3.791 = 54 966.41

Present value of the salvage value

15 000/1.611 = 9 313.82

NPV

NPV = −60 000 + 54 966.41 + 9 313.82 = €4 280.23

Answer

NPV = €4 280.23
28.NPV & IRR

Answer: IRR = 11.18 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(10%) = 371.90
NPV(15%) = −1 143.67

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 10 + 5·371.90/(371.90 − (−1 143.67)) = 11.23%
exact: NPV(11.18%) = 0 → IRR = 11.18%

Answer

IRR = 11.18%
29.Normal distribution

Answer: P = 0.1056

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the sum

μ = 750 g, σ = √(4² + 9²) = 9.849 g

Standardise

z = (762.3 − 750)/9.849 = 1.25

Upper tail

P = 1 − Φ(1.25) = 1 − 0.8944 = 0.1056

Answer

P = 0.1056
30.Normal distribution

Answer: x = 43.76 min

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z for the percentile

Φ(z) = 0.975 → z = 1.96

Back to x

x = 32 + 1.96·6 = 43.76 min

Answer

x = 43.76 min