FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 20 kNP2​ = 25 kNABRA​RB​ = ?1 m1.5 m1.5 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.

L = 4 mP1 = 20 kN at 1 mP2 = 25 kN at 2.5 m
RB = kN
2.Beam support reactionsHard
w = 2 kN/mP = 25 kNADCMA​ = ?4 m3 m1 m

A compound beam is fixed to the wall at A, has an internal hinge at C (4 m from A) and rests on a roller at D (8 m from A). It carries a point load P at 7 m from A, a uniformly distributed load w on the whole part CD. Find the magnitude of the reaction moment MA at the wall.

AC = 4 mAD = 8 mP = 25 kN at 7 mw = 2 kN/m from 4 to 8 m
MA = kN·m
3.Truss: method of jointsMedium
ABCDEFGH30 kN30 kN30 kN20 kN4 × 4 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 30 kN ↓D: 30 kN ↓F: 30 kN ↓G: 20 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
4.Truss: method of jointsHard
ABBCACACB60 kN30 kN4 m3 m4 m

Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.

span = 4 mheight = 4 mB is 3 m from Avertical load = 60 kNhorizontal load = 30 kN ←
FAB = kN
5.Shear force & bending momentMedium
w = 4 kN/mABsection1 m3 m

Find the shear force Vx at the section x = 1 m from support A. Use sagging moments positive and upward shear on the left face positive.

L = 4 mw = 4 kN/m from 0 to 4 mx = 1 m
Vx = kN
6.Shear force & bending momentHard
w = 4 kN/mP = 25 kNAB1 m3 m

The simply supported beam carries a uniformly distributed load w over its whole span and a point load P. Find the maximum bending moment Mmax in the beam.

L = 4 mP = 25 kN at 1 mw = 4 kN/m from 0 to 4 m
Mmax = kN·m
7.Beam deflectionMedium
P = 17 kNABδ3 m1 m

A simply supported beam carries a point load P at a = 3 m from support A. Find the deflection δP under the load.

P = 17 kNa = 3 mL = 4 mE = 70 GPa (aluminium)I = 160 × 10⁶ mm⁴
δP = mm
8.Beam deflectionHard
P = 75 kNAB2 m2 m

A propped cantilever is fixed at A and simply supported (propped) at B. It carries a point load P at midspan. EI is constant. Find the reaction RB at the prop.

L = 4 mP = 75 kN at 2 m
RB = kN
9.Column bucklingMedium
PL = 2.5 md = 25 mmcross-section

A column of length L made of aluminium is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 2.5 mE = 70 GPa (aluminium)d = 25 mm
Pcr = kN
10.Column bucklingHard
P = 105 kNL = 6 md = ?cross-section

A solid round column of length L made of aluminium is pinned at both ends. It must carry 105 kN with a factor of safety of 3 against buckling. Find the smallest diameter d.

P = 105 kNn = 3L = 6 mE = 70 GPa (aluminium)
d = mm
11.Centroid & second moment of areaMedium
120170t = 8xdimensions in mm

A channel section lies with its open side up: a base plate 120 mm wide with two upright legs, 170 mm high overall. Base and legs are all 8 mm thick. Find its second moment of area Ix about the horizontal axis x through its centroid.

b = 120 mmh = 170 mmt = 8 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
150 mm240 mm144 mm30 × 50xIx​ = ?

A 150 mm × 240 mm plate has a rectangular cut-out 30 mm wide and 50 mm high, centred on the vertical centre line with its centre 144 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 150 mmh = 240 mmcut-out: 30 × 50 mmhole centre: y = 144 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
sandγd​ = 17 kN/m³γsat​ = 19 kN/m³12 mwater tableXz = 6 m

For the soil profile shown, find the pore water pressure u at point X.

z = 6 mzw = 3 mγw = 9.81 kN/m³sand: γd = 17 kN/m³sand: γsat = 19 kN/m³
u = kPa
14.Effective stress in soilHard
sandγd​ = 15.5 kN/m³γsat​ = 20.5 kN/m³4 mclayγsat​ = 18 kN/m³5 mwater tableXz = 6.5 m

For the soil profile shown, find the pore water pressure u at point X.

z = 6.5 mzw = 1 mγw = 9.81 kN/m³sand: γd = 15.5 kN/m³sand: γsat = 20.5 kN/m³clay: γsat = 18 kN/m³
u = kPa
15.Consolidation settlementMedium
Δσ = 65 kPasandclayCc​ = 0.45, Cr​ = 0.02e0​ = 1.2σ′0​ = 85 kPaσ′p​ = 185 kPa6.5 mwater table

A 6.5 m thick overconsolidated clay layer has Cc = 0.45, Cr = 0.02 and e₀ = 1.2. At its mid-depth the effective vertical stress is 85 kPa and the preconsolidation pressure is 185 kPa. A new building adds 65 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 6.5 mCc = 0.45Cr = 0.02e0 = 1.2σ′0 = 85 kPaσ′p = 185 kPaΔσ = 65 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 7.5 mcv​ = 0.8 m²/year7.5 mimpervious rockwater table

A clay layer 7.5 m thick has a coefficient of consolidation cv = 0.8 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?

H = 7.5 mcv = 0.8 m²/yearU = 60%Tv = 0.287single drainage
t = years
17.Hydrostatic forceMedium
gated = 4 mH = 2 m

A vertical rectangular gate 1 m wide sits in the wall of a tank of water, with its top edge 4 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 4 mH = 2 mb = 1 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 1 mH = 1 m

A vertical rectangular gate 3 m wide sits in the wall of a tank of seawater, with its top edge 1 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 1 mH = 1 mb = 3 mρ = 1025 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
Q = 40 L/sD = 250 mmL = 400 mf = 0.03

Water flows at 40 L/s through a pipe 400 m long with an inside diameter of 250 mm. Use the Darcy friction factor f = 0.03 and g = 9.81 m/s². Find the friction head loss hf.

Q = 40 L/sL = 400 mD = 250 mmf = 0.03g = 9.81 m/s²
hf = m
20.Pipe friction & head lossHard
K = 10free outletH = ?L = 200 m, D = 200 mm, f = 0.0184× bend (K = 0.3)

A pipe 200 m long with an inside diameter of 200 mm (Darcy friction factor f = 0.018) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each) and a valve (K = 10). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 40 L/s?

Q = 40 L/sL = 200 mD = 200 mmf = 0.018Kentrance = 0.5Kbend = 0.3 (×4)Kvalve = 10
H = m
21.Open-channel flow (Manning)Medium
b = 3.5 my = 1 mn = 0.012, S = 0.001

A rectangular finished concrete channel is 3.5 m wide. Water flows uniformly 1 m deep. Manning n = 0.012 and the bed slope is S = 0.001. Find the flow rate Q in m³/s.

b = 3.5 my = 1 mn = 0.012S = 0.001
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 3.5 my = 1.6 mn = 0.014, Q = 11 m³/s

A rectangular unfinished concrete channel 3.5 m wide must carry 11 m³/s in uniform flow at a depth of 1.6 m. Manning n = 0.014. Find the required bed slope S (in m/m).

Q = 11 m³/sb = 3.5 my = 1.6 mn = 0.014
S = m/m
23.Pumps & pump powerMedium
PQ = 15 L/sH = 10 m

In a test, a pump delivers 15 L/s of water (ρ = 1000 kg/m³) against a head of 10 m while its shaft takes 2.5 kW. Use g = 9.81 m/s². Find the pump efficiency η in percent.

Q = 15 L/sH = 10 mPshaft = 2.5 kWg = 9.81 m/s²
η = %
24.Pumps & pump powerHard
PQ = 50 L/sΔz = 12 mL = 400 m, D = 200 mm, f = 0.02, ΣK = 8

A pump moves 50 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 12 m higher. The pipe is 400 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.02; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². The pump efficiency is 72%. Find the shaft power Pshaft in kW.

Q = 50 L/sΔz = 12 mL = 400 mD = 200 mmf = 0.02ΣK = 8η = 72%
Pshaft = kW
25.Time value of moneyMedium
years0123…9PV = ?€20 000+2.5%+2.5%…r = 6.5%

A property is expected to earn net rent of €20 000 next year. The rent is expected to grow by 2.5% per year forever. The required return is 6.5% per year. Find the value PV of the property today.

C1 = €20 000g = 2.5%r = 6.5%
PV = €
26.Time value of moneyHard
months01…72…300€250 000AB = ?A4.8% / 12

A mortgage of €250 000 is repaid with equal monthly payments over 25 years at 4.8% per year, compounded monthly. How much is still owed just after the payment at the end of year 6? Find the outstanding balance B.

P = €250 0004.8% / 12N = 300k = 72
B = €
27.NPV & IRRMedium
years0123…9−400 00040 000+1%+1%…r = 10%, NPV = ?

A project costs €400 000 today. It generates €40 000 at the end of the first year, and the cash flow then grows by 1% per year forever. The cost of capital is 10%. Find the net present value NPV.

C0 = €400 000CF1 = €40 000g = 1%r = 10%
NPV = €
28.NPV & IRRHard
years0123−50 00035 00018 50033 500

A project costs €50 000 and returns €35 000, €18 500, €33 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.

CF0 = −50 000CF1 = 35 000CF2 = 18 500CF3 = 33 500
IRR = %
29.Normal distributionMedium
250 kg250.8 kgT = X₁ + … + X₁₀?

The masses of bags of cement are independent and normal with mean 25 kg and standard deviation 0.5 kg. Find the probability P that the total mass of 10 of them is below 250.8 kg. Round z to two decimals.

μ = 25 kgσ = 0.5 kgn = 10< 250.8 kg
P =
30.Normal distributionHard
10 g0X − Y?

The mass X of a product from line 1 and Y from line 2 are independent and normal: X has mean 500 g and standard deviation 8 g, Y has mean 490 g and standard deviation 6 g. Find the probability P that X is greater than Y. Round z to two decimals.

μX = 500 g, σX = 8 gμY = 490 g, σY = 6 g
P =

3Solutions

1.Beam support reactions

Answer: RB = 20.63 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

P1​ = 20 kNP2​ = 25 kNABRA​RB​1 m1.5 m1.5 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·4 = 20·1 + 25·2.5
RB = 82.5/4 = 20.63 kN
ΣFy = 0: RA = 45 − 20.63 = 24.38 kN

Answer

RB = 20.63 kN
2.Beam support reactions

Answer: MA = 41 kN·m

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation. An internal hinge cannot carry a bending moment, which gives one extra equation: the moment about the hinge of the forces on either side is zero.

Part CD

The hinge has no moment, so moments about C on CD alone must balance.

W = 2·4 = 8 kN at 2 m from C
ΣMC = 0: RD·4 = 25·3 + 8·2
RD = 22.75 kN
VC = 33 − 22.75 = 10.25 kN

Part AC

The hinge force VC acts downward on AC (equal and opposite to its action on CD).

RA = 10.25 = 10.25 kN
MA = 10.25·4 = 41 kN·m

Answer

MA = 41 kN·m
3.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 83.33 kN (T), BC: 86.67 kN (T), CD: 86.67 kN (T), DE: 63.33 kN (T), FG: 83.33 kN (C), GH: 63.33 kN (C), AF: 104.2 kN (C), HE: 79.17 kN (C), BF: 32.5 kN (T), CG: 0, DH: 47.5 kN (T), BG: 4.167 kN (C), DG: 29.17 kN (C)

Answer

Zero-force member: CG
4.Truss: method of joints

Answer: FAB = −56.25 kN

Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.

ABBCACACB60 kN30 kNAy​Cy​Ax​

Support reactions

Equilibrium of the whole truss. Moments about A, counter-clockwise positive.

ΣMA = 0: Cy·4 = 60·3 − 30·4 → Cy = 15 kN
ΣFy = 0: Ay = 60 − 15 = 45 kN
ΣFx = 0: Ax = 30 kN

Joint A

Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.

sin α = 4/5 = 0.8
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −45/0.8 = −56.25 kN

Answer

FAB = −56.25 kN (compression)
5.Shear force & bending moment

Answer: Vx = 4 kN

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 4·4 = 16 kN, acting at x̄ = 2 m
ΣMA = 0: RB·4 = 4·4·2
RB = 32/4 = 8 kN
ΣFy = 0: RA = 16 − 8 = 8 kN
w = 4 kN/mABRA​ = 8RB​ = 8section1 m3 m

Cut at x = 1 m and keep the left part

Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.

V = RA − (all downward loads left of the cut)
Vx = 8 − 4·1 = 4 kN

Answer

Vx = 4 kN
6.Shear force & bending moment

Answer: Mmax = 24.75 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 4·4 = 16 kN, acting at x̄ = 2 m
ΣMA = 0: RB·4 = 25·1 + 4·4·2
RB = 57/4 = 14.25 kN
ΣFy = 0: RA = 41 − 14.25 = 26.75 kN

Where is V = 0?

V(1⁻) = RA − w·1 = 22.75 kN
V(1⁺) = 22.75 − 25 = −2.25 kN
The shear changes sign at the load, so the maximum is under the load.

Maximum moment

Mmax = RA·1 − w·1²/2 = 26.75·1 − 4·1²/2 = 24.75 kN·m

Answer

Mmax = 24.75 kN·m

It occurs at x = 1 m from A.

7.Beam deflection

Answer: δP = 1.138 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 17000 N, a = 3000 mm, b = 1000 mm, L = 4000 mm
EI = 1.12 × 10¹³ N·mm²

Deflection under the load

δP = Pa²b²/(3EIL) = 17000·3000²·1000²/(3·1.12 × 10¹³·4000) = 1.138 mm

Answer

δP = 1.138 mm
8.Beam deflection

Answer: RB = 23.44 kN

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).

Remove the prop

Without the prop the beam is a cantilever. Its free end would deflect under the load.

δload = P(L/2)²(3L − L/2)/(6EI) = 5PL³/(48EI)

Compatibility at the prop

The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.

RB·L³/(3EI) = 5PL³/(48EI) → RB = 5P/16 = 5·75/16 = 23.44 kN

Answer

RB = 23.44 kN
9.Column buckling

Answer: Pcr = 4.326 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·25⁴/64 = 19175 mm⁴

Effective length

KL = 0.7·2500 = 1750 mm

Critical load

Pcr = π²EI/(KL)² = π²·70000·19175/1750² = 4326 N = 4.326 kN

Answer

Pcr = 4.326 kN
10.Column buckling

Answer: d = 135.2 mm

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Required critical load

Pcr = n·P = 3·105000 = 315000 N
KL = 1·6000 = 6000 mm

Solve for the diameter

d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·315000·6000²/(π³·70000))^(1/4) = 135.2 mm

Answer

d = 135.2 mm

Check: the slenderness KL/r is 177.5, so the column is slender and Euler applies.

11.Centroid & second moment of area

Answer: Ix = 10.74 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into rectangles

Take the base at full width and the two legs above it (height h − t), so nothing is counted twice.

base: A1 = 120·8 = 960 mm², y1 = 4 mm
two legs: A2 = 2·8·162 = 2592 mm², y2 = 8 + 162/2 = 89 mm

Centroid

ȳ = (960·4 + 2592·89)/3552 = 66.03 mm

Parallel-axis theorem

base: 120·8³/12 + 960·(4 − 66.03)² = 3.699 × 10⁶ mm⁴
two legs: 2·8·162³/12 + 2592·(89 − 66.03)² = 7.037 × 10⁶ mm⁴
Ix = 3.699 × 10⁶ + 7.037 × 10⁶
Ix = 1.074 × 10⁷ mm⁴ = 10.74 × 10⁶ mm⁴

Answer

Ix = 10.74 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: Ix = 171.6 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (36000·120 − 1500·144)/(36000 − 1500) = 119 mm

Full plate about ȳ

150·240³/12 + 36000·1.043² = 172.8 × 10⁶ mm⁴

Hole about ȳ

30·50³/12 + 1500·25.04² = 1.253 × 10⁶ mm⁴

Subtract

Ix = 171.6 × 10⁶ mm⁴

Answer

Ix = 171.6 × 10⁶ mm⁴
13.Effective stress in soil

Answer: u = 29.43 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·3 = 29.43 kPa

Answer

u = 29.43 kPa
14.Effective stress in soil

Answer: u = 53.96 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·5.5 = 53.96 kPa

Answer

u = 53.96 kPa
15.Consolidation settlement

Answer: S = 14.58 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 85 + 65 = 150 kPa ≤ 185 kPa

Settlement

The clay stays on its recompression line.

S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.02·6.5/(1 + 1.2)·log₁₀(150/85) = 14.58 mm

Answer

S = 14.58 mm
16.Consolidation settlement

Answer: t = 20.18 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H = 7.5 m

Time

t = Tv·Hdr²/cv = 0.287·7.5²/0.8 = 20.18 years

Answer

t = 20.18 years
17.Hydrostatic force

Answer: F = 98.1 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 4 + 2/2 = 5 m
A = H·b = 2·1 = 2 m²
gated = 4 mH = 2 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·5·2 = 98.1 kN

Answer

F = 98.1 kN
18.Hydrostatic force

Answer: ycp = 1.556 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1 + 1/2 = 1.5 m
A = H·b = 1·3 = 3 m²
gated = 1 mH = 1 mF

Resultant force

F = ρ·g·yc·A = 1025·9.81·1.5·3 = 45.25 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 3·1³/12 = 0.25 m⁴
ycp = yc + Ic/(yc·A) = 1.5 + 0.25/(1.5·3) = 1.556 m

Answer

ycp = 1.556 m
19.Pipe friction & head loss

Answer: hf = 1.625 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Mean velocity

A = π·0.25²/4 = 0.04909 m²
V = Q/A = 0.04/0.04909 = 0.8149 m/s

Velocity head

V²/(2g) = 0.8149²/(2·9.81) = 0.03384 m

Darcy–Weisbach

hf = f·(L/D)·V²/(2g) = 0.03·(400/0.25)·0.8149²/(2·9.81) = 1.625 m

Answer

hf = 1.625 m
20.Pipe friction & head loss

Answer: H = 2.537 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.04/0.03142 = 1.273 m/s
V²/(2g) = 0.08263 m

Loss coefficients

f·L/D = 0.018·200/0.2 = 18
ΣK = 0.5 + 4·0.3 + 10 = 11.7

Energy equation

The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.

H = (1 + 18 + 11.7)·0.08263 = 2.537 m

Answer

H = 2.537 m
21.Open-channel flow (Manning)

Answer: Q = 6.824 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 3.5·1 = 3.5 m²
P = b + 2y = 3.5 + 2·1 = 5.5 m
R = A/P = 0.6364 m

Velocity

V = (1/0.012)·0.63642/3·0.0011/2 = 1.95 m/s

Flow rate

Q = A·V = 3.5·1.95 = 6.824 m³/s

Answer

Q = 6.824 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.0009605 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 3.5·1.6 = 5.6 m²
P = b + 2y = 3.5 + 2·1.6 = 6.7 m
R = A/P = 0.8358 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.014·11/(5.6·0.8873) = 0.03099
S = 0.03099² = 0.0009605

Answer

S = 0.0009605

That is a fall of 0.9605 m per kilometre.

23.Pumps & pump power

Answer: η = 58.86 %

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.015·10 = 1.472 kW

Efficiency

η = Ph/Pshaft = 1.472/2.5 = 58.86%

Answer

η = 58.86%
24.Pumps & pump power

Answer: Pshaft = 12.4 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.05/0.03142 = 1.592 m/s
V²/(2g) = 0.1291 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (40 + 8)·0.1291 = 6.197 m

Pump head

H = Δz + hL = 12 + 6.197 = 18.2 m

Shaft power

Pshaft = ρ·g·Q·H/η = 1000·9.81·0.05·18.2/0.72 = 12.4 kW

Answer

Pshaft = 12.4 kW
25.Time value of money

Answer: PV = 500000 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Growing perpetuity

PV = C1/(r − g) = 20 000/(0.065 − 0.025) = 20 000/0.04 = €500 000.00

Answer

PV = €500 000.00
26.Time value of money

Answer: B = 213996 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly payment

i = 0.004, N = 300
A = 250 000·0.004/(1 − (1 + 0.004)−300) = €1 432.49

Present value of the remaining payments

Whatever is still owed must be exactly paid off by the remaining payments.

N − k = 300 − 72 = 228
B = 1432·(1 − (1 + 0.004)−228)/0.004 = €213 995.95

Answer

B = €213 995.95
27.NPV & IRR

Answer: NPV = 44444 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Value of the cash flows

PV = 40 000/(0.1 − 0.01) = 444 444.44

NPV

NPV = 444 444.44 − 400 000 = €44 444.44

Answer

NPV = €44 444.44

NPV is positive, so the project earns more than the required return.

28.NPV & IRR

Answer: IRR = 34.53 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(30%) = 3 117.89
NPV(35%) = −307.37

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 30 + 5·3 117.89/(3 117.89 − (−307.37)) = 34.55%
exact: NPV(34.53%) = 0 → IRR = 34.53%

Answer

IRR = 34.53%
29.Normal distribution

Answer: P = 0.695

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the total

μT = 250 kg, σT = 0.5·√10 = 1.581 kg

Standardise

z = (250.8 − 250)/1.581 = 0.51

Probability

P = Φ(0.51) = 0.695

Answer

P = 0.695
30.Normal distribution

Answer: P = 0.8413

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the difference

μ = 500 − 490 = 10 g, σ = 10 g

Standardise

z = (0 − 10)/10 = −1

Probability

P = 1 − Φ(−1) = 0.8413

Answer

P = 0.8413

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.

ExamProblems · examproblems.com/courses/fe-exam-civil