FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
w = 4 kN/mP = 20 kNABMA​ = ?5 m1 m

The cantilever beam is fixed to the wall at A. It carries a uniformly distributed load w along its whole length and a point load P at 5 m from the wall. Find the magnitude of the reaction moment MA at the wall.

L = 6 mP = 20 kN at 5 mw = 4 kN/m from 0 to 6 m
MA = kN·m
2.Beam support reactionsHard
w = 6 kN/mP = 25 kNABRA​RB​ = ?4 m2 m1 m1 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.

L = 8 mP = 25 kN at 4 mw = 6 kN/m from 6 to 7 m
RB = kN
3.Truss: method of jointsMedium
ABCDEFGH10 kN25 kN10 kN4 × 3 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

D: 10 kN ↓G: 25 kN ↓H: 10 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
4.Truss: method of jointsHard
ABCDEFGH15 kN25 kN25 kN4 × 4 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

D: 15 kN ↓F: 25 kN →G: 25 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
5.Shear force & bending momentMedium
60 kN50 kNABCDEFG1 m1 m1 m1 m1 m1 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

60 kN @ 1 m50 kN @ 3 m
  1. 1A (x = 0 m)
  2. 2B (x = 1 m)
  3. 3C (x = 2 m)
  4. 4D (x = 3 m)
  5. 5E (x = 4 m)
  6. 6F (x = 5 m)
  7. 7G (x = 6 m)
6.Shear force & bending momentHard
w = 20 kN/mAB3 m1 m

The simply supported beam carries a uniformly distributed load over part of its span. Find the distance x0 from A to the section where the bending moment is largest.

L = 4 mw = 20 kN/m from 0 to 3 m
x0 = m
7.Beam deflectionMedium
w = 6 kN/mδL = 3 m

A cantilever carries a uniformly distributed load w over its whole length. Find the deflection δ at the free end.

w = 6 kN/mL = 3 mE = 70 GPa (aluminium)I = 23 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
w = 12 kN/mδL = 6 m

A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.

w = 12 kN/mL = 6 mE = 11 GPa (timber)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
PL = 6 md = 60 mmcross-section

A column of length L made of steel is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 6 mE = 200 GPa (steel)d = 60 mm
Pcr = kN
10.Column bucklingHard
PL = 4 md = 60 mmcross-section

A column of length L made of aluminium is pinned at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 4 mE = 70 GPa (aluminium)d = 60 mm
σcr = MPa
11.Centroid & second moment of areaMedium
B = 180H = 325t = 6xdimensions in mm

A hollow rectangular (box) section has outer width B = 180 mm, outer height H = 325 mm and a uniform wall thickness t = 6 mm. Find its radius of gyration r about the horizontal centroidal axis.

B = 180 mmH = 325 mmt = 6 mm
r = mm
12.Centroid & second moment of areaHard
2402520018xM = 5 kN·mdimensions in mm

The T-section is used as a beam with the flange on top and carries a sagging bending moment of 5 kN·m. Find the bending stress σbottom at the bottom edge.

bf = 240 mmtf = 25 mmtw = 18 mmhw = 200 mmM = 5 kN·m
σbottom = MPa
13.Effective stress in soilMedium
sandγd​ = 15.5 kN/m³γsat​ = 20 kN/m³12 mwater tableXz = 10 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 10 mzw = 2 mγw = 9.81 kN/m³sand: γd = 15.5 kN/m³sand: γsat = 20 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 15 kN/m³γsat​ = 19.5 kN/m³4 mclayγsat​ = 18 kN/m³6 mwater tableXz = 7 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 7 mzw = 1 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 19.5 kN/m³clay: γsat = 18 kN/m³
σ′ = kPa
15.Consolidation settlementMedium
Δσ = 140 kPasandclayCc​ = 0.3, Cr​ = 0.04e0​ = 0.6σ′0​ = 90 kPaσ′p​ = 210 kPa7 mwater table

A 7 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.04 and e₀ = 0.6. At its mid-depth the effective vertical stress is 90 kPa and the preconsolidation pressure is 210 kPa. A new building adds 140 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 7 mCc = 0.3Cr = 0.04e0 = 0.6σ′0 = 90 kPaσ′p = 210 kPaΔσ = 140 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 8 m8 mimpervious rockwater table

In a laboratory oedometer test, a clay specimen 19 mm thick, drained at the top and bottom, reaches 50% consolidation in 4 min. In the field the same clay forms a layer 8 m thick. It lies on impervious rock, with sand above it, so water drains out only at the top. How many days t does the field layer take to reach 50% consolidation?

hlab = 19 mmtlab = 4 minH = 8 mfield: single drainage
t = days
17.Hydrostatic forceMedium
gated = 3 mH = 1 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 3 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 3 mH = 1 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 1 mH = 2 m

A vertical rectangular gate 1.5 m wide sits in the wall of a tank of oil, with its top edge 1 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 1 mH = 2 mb = 1.5 mρ = 880 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
V = 2.3 m/sD = 250 mmL = 150 mf = 0.018

Water (ρ = 1000 kg/m³) flows at 2.3 m/s through a horizontal pipe, 150 m long, with an inside diameter of 250 mm. Use the Darcy friction factor f = 0.018 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 2.3 m/sL = 150 mD = 250 mmf = 0.018ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 0.2free outletH = ?L = 150 m, D = 300 mm, f = 0.0154× bend (K = 0.3)

A pipe 150 m long with an inside diameter of 300 mm (Darcy friction factor f = 0.015) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each) and a valve (K = 0.2). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 120 L/s?

Q = 120 L/sL = 150 mD = 300 mmf = 0.015Kentrance = 0.5Kbend = 0.3 (×4)Kvalve = 0.2
H = m
21.Open-channel flow (Manning)Medium
D = 600 mmn = 0.013, S = 0.005

A concrete storm sewer with an inside diameter of 600 mm flows just full (as an open channel, not under pressure). Manning n = 0.013 and the slope is S = 0.005. Find the flow rate Q in m³/s.

D = 600 mmn = 0.013S = 0.005
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 1 my = 1.8 m2 : 1n = 0.012, Q = 21 m³/s

A trapezoidal finished concrete channel with a bottom width of 1 m and side slopes of 2:1 (horizontal:vertical) must carry 21 m³/s in uniform flow at a depth of 1.8 m. Manning n = 0.012. Find the required bed slope S (in m/m).

Q = 21 m³/sb = 1 my = 1.8 mz = 2n = 0.012
S = m/m
23.Pumps & pump powerMedium
PQ = 60 L/sH = 70 m

In a test, a pump delivers 60 L/s of water (ρ = 1000 kg/m³) against a head of 70 m while its shaft takes 51.5 kW. Use g = 9.81 m/s². Find the pump efficiency η in percent.

Q = 60 L/sH = 70 mPshaft = 51.5 kWg = 9.81 m/s²
η = %
24.Pumps & pump powerHard
PQ = 75 L/sΔz = 20 mL = 300 m, D = 200 mm, f = 0.022, ΣK = 8

A pump moves 75 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 20 m higher. The pipe is 300 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.022; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.

Q = 75 L/sΔz = 20 mL = 300 mD = 200 mmf = 0.022ΣK = 8
H = m
25.Time value of moneyMedium
years0123…9PV = ?€10 000+2.5%+2.5%…r = 7.5%

A property is expected to earn net rent of €10 000 next year. The rent is expected to grow by 2.5% per year forever. The required return is 7.5% per year. Find the value PV of the property today.

C1 = €10 000g = 2.5%r = 7.5%
PV = €
26.Time value of moneyHard
months0123…192€250€250€250FV = ?

You save €250 at the end of every month for 16 years. The account pays 4.8% per year, compounded monthly. How much have you saved at the end? Find FV.

A = €2504.8% / 12N = 192
FV = €
27.NPV & IRRMedium
years0123…9−500 00020 000+4%+4%…r = 9%, NPV = ?

A project costs €500 000 today. It generates €20 000 at the end of the first year, and the cash flow then grows by 4% per year forever. The cost of capital is 9%. Find the net present value NPV.

C0 = €500 000CF1 = €20 000g = 4%r = 9%
NPV = €
28.NPV & IRRHard
years0123−50 00025 50018 00033 500

A project costs €50 000 and returns €25 500, €18 000, €33 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.

CF0 = −50 000CF1 = 25 500CF2 = 18 000CF3 = 33 500
IRR = %
29.Normal distributionMedium
−3−2−10123zshaded area between −z and z = 0.8926

Drag z so that the shaded area between −z and z under the standard normal curve is 0.8926. Find z to two decimals.

A = 0.8926
z =
30.Normal distributionHard
μ = 178x = ?99%

The heights of adult men are normally distributed with mean 178 cm and standard deviation 7 cm. Find the value x below which 99% of them lie (the 99th percentile).

μ = 178σ = 7P = 99%
x = cm

3Solutions

1.Beam support reactions

Answer: MA = 172 kN·m

Cantilever equilibrium: a fixed support can push up and also resist rotation, so it gives a vertical reaction RA and a reaction moment MA. ΣFy = 0 gives RA, and moments about the wall give MA = Σ(load × distance from the wall). A distributed load acts as its resultant at the centroid of the load diagram.

Resultant of the distributed load

W = 4·6 = 24 kN, x̄ = 3 m

Moment about the wall

MA = P·a + W·x̄ = 20·5 + 24·3 = 172 kN·m

Answer

MA = 172 kN·m
2.Beam support reactions

Answer: RB = 17.38 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

w = 6 kN/mP = 25 kNABRA​RB​4 m2 m1 m1 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

UDL resultant: W = w·ℓ = 6·1 = 6 kN, acting at x̄ = 6.5 m
ΣMA = 0: RB·8 = 25·4 + 6·1·6.5
RB = 139/8 = 17.38 kN
ΣFy = 0: RA = 31 − 17.38 = 13.63 kN

Answer

RB = 17.38 kN
3.Truss: method of joints

Answer: member BF

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint B

AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.

ΣF⊥ = 0 → FBF = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 13.12 kN (T), BC: 13.12 kN (T), CD: 20.62 kN (T), DE: 20.62 kN (T), FG: 26.25 kN (C), GH: 26.25 kN (C), AF: 21.88 kN (C), HE: 34.37 kN (C), BF: 0, CG: 25 kN (C), DH: 10 kN (T), FC: 21.88 kN (T), HC: 9.375 kN (T)

Answer

Zero-force member: BF
4.Truss: method of joints

Answer: member BF

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint B

AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.

ΣF⊥ = 0 → FBF = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 35 kN (T), BC: 35 kN (T), CD: 30 kN (T), DE: 30 kN (T), FG: 45 kN (C), GH: 45 kN (C), AF: 14.14 kN (C), HE: 42.43 kN (C), BF: 0, CG: 25 kN (C), DH: 15 kN (T), FC: 14.14 kN (T), HC: 21.21 kN (T)

Answer

Zero-force member: BF
5.Shear force & bending moment

Answer: D (x = 3 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 75 kN, R2 = 35 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 75, MC = 90, MD = 105 kN·m, ME = 70, MF = 35, MG = 0

Answer

Mark D: MD = 105 kN·m
6.Shear force & bending moment

Answer: x0 = 1.875 m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 20·3 = 60 kN, acting at x̄ = 1.5 m
ΣMA = 0: RB·4 = 20·3·1.5
RB = 90/4 = 22.5 kN
ΣFy = 0: RA = 60 − 22.5 = 37.5 kN

Zero shear

The shear force starts at RA, stays constant over any unloaded part and falls with slope w inside the load.

RA − w·(x0 − 0) = 0
x0 = 0 + 37.5/20 = 1.875 m

Answer

x0 = 1.875 m
7.Beam deflection

Answer: δ = 37.73 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 6 N/mm, L = 3000 mm
EI = 1.61 × 10¹² N·mm²

Deflection

δ = wL⁴/(8EI) = 6·3000⁴/(8·1.61 × 10¹²) = 37.73 mm

Answer

δ = 37.73 mm
8.Beam deflection

Answer: Ireq = 1105 × 10⁶ mm⁴

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Deflection limit

δallow = L/360 = 6000/360 = 16.67 mm

Required second moment of area

I = 5wL⁴/(384·E·δallow) = 5·12·6000⁴/(384·11000·16.67) = 1.105 × 10⁹ mm⁴
Ireq = 1105 × 10⁶ mm⁴

Answer

Ireq = 1105 × 10⁶ mm⁴
9.Column buckling

Answer: Pcr = 71.19 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·60⁴/64 = 636173 mm⁴

Effective length

KL = 0.7·6000 = 4200 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·636173/4200² = 71188 N = 71.19 kN

Answer

Pcr = 71.19 kN
10.Column buckling

Answer: σcr = 9.715 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·60⁴/64 = 636173 mm⁴

Radius of gyration and slenderness

A = 2827 mm²
r = √(I/A) = √(636173/2827) = 15 mm
KL = 1·4000 = 4000 mm
KL/r = 4000/15 = 266.7

Critical stress

σcr = π²E/(KL/r)² = π²·70000/266.7² = 9.715 MPa

Answer

σcr = 9.715 MPa
11.Centroid & second moment of area

Answer: r = 120.3 mm

Second moment of area: for a rectangle about its own centroidal axis I = bh³/12, and about its base bh³/3 (parallel-axis theorem I = Ic + A·d²). A hole is handled by subtracting its I, as long as both parts share the same axis. The elastic section modulus is S = I/c, where c is the distance to the extreme fibre. The radius of gyration r = √(I/A) is the distance at which the whole area would give the same I; it is used in column buckling.

Net area and second moment of area

b = 168 mm, h = 313 mm
A = BH − bh = 180·325 − 168·313 = 5916 mm²
I = (BH³ − bh³)/12 = 8.562 × 10⁷ mm⁴

Radius of gyration

r = √(I/A) = √(8.562 × 10⁷/5916) = 120.3 mm

Answer

r = 120.3 mm
12.Centroid & second moment of area

Answer: σbottom = 20.88 MPa

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 240·25 = 6000 mm², yf = 200 + 25/2 = 212.5 mm
web: Aw = 18·200 = 3600 mm², yw = 200/2 = 100 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (6000·212.5 + 3600·100)/9600 = 170.3 mm

Parallel-axis theorem

flange: 240·25³/12 + 6000·(212.5 − 170.3)² = 1.099 × 10⁷ mm⁴
web: 18·200³/12 + 3600·(100 − 170.3)² = 2.98 × 10⁷ mm⁴
Ix = 1.099 × 10⁷ + 2.98 × 10⁷ = 4.079 × 10⁷ mm⁴

Bending stress

The bottom edge is ȳ from the axis.

y = 170.3 mm
σ = M·y/I = 5 × 10⁶·170.3/4.079 × 10⁷ = 20.88 MPa

Answer

σbottom = 20.88 MPa
13.Effective stress in soil

Answer: σ′ = 112.5 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 15.5·2 + 20·8 = 191 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·8 = 78.48 kPa

Effective stress

σ′ = σ − u = 191 − 78.48 = 112.5 kPa

Answer

σ′ = 112.5 kPa
14.Effective stress in soil

Answer: σ′ = 68.64 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·1 + γsat,sand·3 + γsat,clay·3
σ = 15·1 + 19.5·3 + 18·3 = 127.5 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·6 = 58.86 kPa

Effective stress

σ′ = σ − u = 127.5 − 58.86 = 68.64 kPa

Answer

σ′ = 68.64 kPa
15.Consolidation settlement

Answer: S = 116.3 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 90 + 140 = 230 kPa > 210 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.04·7/(1 + 0.6)·log₁₀(210/90) + 0.3·7/(1 + 0.6)·log₁₀(230/210)
S = 64.4 + 51.85 = 116.3 mm

Answer

S = 116.3 mm
16.Consolidation settlement

Answer: t = 1970 days

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage paths

Hdr,lab = 19/2 = 9.5 mm = 0.0095 m
Hdr,field = 8 m

Scale the time

t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.

tfield = 4·(8/0.0095)² = 2.837 × 10⁶ min
tfield = 2.837 × 10⁶/1440 = 1970 days

Answer

t = 1970 days
17.Hydrostatic force

Answer: F = 68.67 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 3 + 1/2 = 3.5 m
A = H·b = 1·2 = 2 m²
gated = 3 mH = 1 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·3.5·2 = 68.67 kN

Answer

F = 68.67 kN
18.Hydrostatic force

Answer: ycp = 2.167 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1 + 2/2 = 2 m
A = H·b = 2·1.5 = 3 m²
gated = 1 mH = 2 mF

Resultant force

F = ρ·g·yc·A = 880·9.81·2·3 = 51.8 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 1.5·2³/12 = 1 m⁴
ycp = yc + Ic/(yc·A) = 2 + 1/(2·3) = 2.167 m

Answer

ycp = 2.167 m
19.Pipe friction & head loss

Answer: Δp = 28.57 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.018·(150/0.25)·2.3²/(2·9.81) = 2.912 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·2.912 = 28566 Pa = 28.57 kPa

Answer

Δp = 28.57 kPa
20.Pipe friction & head loss

Answer: H = 1.528 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.12/0.07069 = 1.698 m/s
V²/(2g) = 0.1469 m

Loss coefficients

f·L/D = 0.015·150/0.3 = 7.5
ΣK = 0.5 + 4·0.3 + 0.2 = 1.9

Energy equation

The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.

H = (1 + 7.5 + 1.9)·0.1469 = 1.528 m

Answer

H = 1.528 m
21.Open-channel flow (Manning)

Answer: Q = 0.4342 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = 0.2827 m², R = D/4 = 0.15 m

Velocity

V = (1/0.013)·0.152/3·0.0051/2 = 1.536 m/s

Flow rate

Q = A·V = 0.2827·1.536 = 0.4342 m³/s

Answer

Q = 0.4342 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.001043 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (1 + 2·1.8)·1.8 = 8.28 m²
P = b + 2y·√(1 + z²) = 1 + 2·1.8·√(1 + 2²) = 9.05 m
R = A/P = 0.9149 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.012·21/(8.28·0.9425) = 0.03229
S = 0.03229² = 0.001043

Answer

S = 0.001043

That is a fall of 1.043 m per kilometre.

23.Pumps & pump power

Answer: η = 80 %

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.06·70 = 41.2 kW

Efficiency

η = Ph/Pshaft = 41.2/51.5 = 80%

Answer

η = 80%
24.Pumps & pump power

Answer: H = 31.91 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.075/0.03142 = 2.387 m/s
V²/(2g) = 0.2905 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (33 + 8)·0.2905 = 11.91 m

Pump head

Both surfaces are open and practically at rest, so pressure and velocity terms drop out.

H = Δz + hL = 20 + 11.91 = 31.91 m

Answer

H = 31.91 m
25.Time value of money

Answer: PV = 200000 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Growing perpetuity

PV = C1/(r − g) = 10 000/(0.075 − 0.025) = 10 000/0.05 = €200 000.00

Answer

PV = €200 000.00
26.Time value of money

Answer: FV = 72009 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly rate and number of deposits

i = 0.048/12 = 0.004
N = 12·16 = 192

Future value of the deposits

FV = A·((1 + i)N − 1)/i = 250·(2.152 − 1)/0.004 = €72 009.47

Answer

FV = €72 009.47

You paid in €48 000 yourself; the rest is interest.

27.NPV & IRR

Answer: NPV = −100000 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Value of the cash flows

PV = 20 000/(0.09 − 0.04) = 400 000.00

NPV

NPV = 400 000.00 − 500 000 = −€100 000.00

Answer

NPV = −€100 000.00

NPV is negative, so the project earns less than the required return.

28.NPV & IRR

Answer: IRR = 23.8 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(20%) = 3 136.57
NPV(25%) = −928.00

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 20 + 5·3 136.57/(3 136.57 − (−928.00)) = 23.86%
exact: NPV(23.8%) = 0 → IRR = 23.8%

Answer

IRR = 23.8%
29.Normal distribution

Answer: z = 1.61

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left of z

Φ(z) = (1 + 0.8926)/2 = 0.9463

Read the z-table backwards

Find 0.9463 inside the table and read off z.

z = 1.61

Answer

z = 1.61
30.Normal distribution

Answer: x = 194.3 cm

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z for the percentile

Φ(z) = 0.99 → z = 2.326

Back to x

x = 178 + 2.326·7 = 194.28 cm

Answer

x = 194.28 cm

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.