laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. It carries a point load P at 5 m from A and a clockwise couple M at 1 m from A. Find the vertical reaction RA, taking upward as positive.
L = 10 mP = 55 kN at 5 mM = 60 kN·m (clockwise) at 1 m
RA = kN
2.Beam support reactionsHard
The cantilever beam is fixed to the wall at A. It carries a linearly varying load that is 10 kN/m at the wall and falls to zero at the free end B, plus a point load P at 5 m from the wall. Find the magnitude of the reaction moment MA at the wall.
L = 8 mw0 = 10 kN/mP = 70 kN at 5 m
MA = kN·m
3.Truss: method of jointsMedium
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
D: 10 kN ↓G: 30 kN ↓H: 35 kN ↓H: 10 kN ←
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member BG
13member DG
5.Shear force & bending momentMedium
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
10 kN @ 8 m50 kN @ 4 m
1A (x = 0 m)
2B (x = 2 m)
3C (x = 4 m)
4D (x = 6 m)
5E (x = 8 m)
6F (x = 10 m)
7G (x = 12 m)
6.Shear force & bending momentHard
The simply supported beam carries a uniformly distributed load over part of its span. Find the maximum bending moment Mmax in the beam.
L = 8 mw = 12 kN/m from 1 to 3 m
Mmax = kN·m
7.Beam deflectionMedium
A cantilever carries a uniformly distributed load w over its whole length. Find the deflection δ at the free end.
w = 6 kN/mL = 2.5 mE = 70 GPa (aluminium)I = 36 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.
w = 20 kN/mL = 8 mE = 70 GPa (aluminium)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
A column of length L made of aluminium is pinned at both ends. Using Euler’s formula, find its critical buckling load Pcr.
L = 1.5 mE = 70 GPa (aluminium)b × h = 50 × 100 mm
Pcr = kN
10.Column bucklingHard
A solid round column of length L made of steel is pinned at both ends. It must carry 45 kN with a factor of safety of 2.5 against buckling. Find the smallest diameter d.
P = 45 kNn = 2.5L = 6 mE = 200 GPa (steel)
d = mm
11.Centroid & second moment of areaMedium
A 200 mm × 150 mm plate has a circular hole of diameter 60 mm on its vertical centre line, with its centre 90 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 200 mmh = 150 mmd = 60 mmhole centre: y = 90 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A welded I-section has a top flange 160 × 14 mm, a web 180 mm high and 8 mm thick, and a bottom flange 200 × 22 mm (width × thickness). Find its second moment of area Ix about the horizontal axis x through its centroid.
top flange: 160 × 14 mmweb: 8 × 180 mmbottom flange: 200 × 22 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
For the soil profile shown, find the vertical effective stress σ′ at point X.
A 7.5 m thick overconsolidated clay layer has Cc = 0.5, Cr = 0.02 and e₀ = 1.05. At its mid-depth the effective vertical stress is 70 kPa and the preconsolidation pressure is 170 kPa. A new building adds 140 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 6 m thick has a coefficient of consolidation cv = 3 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 70% average consolidation the time factor is Tv = 0.403. How many years t does the layer take to reach 70% consolidation?
A vertical rectangular gate 1 m wide sits in the wall of a tank of water, with its top edge 3 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 2 m wide sits in the wall of a tank of oil, with its top edge 3 m below the surface. Find the resultant hydrostatic force F on the gate.
d = 3 mH = 3 mb = 2 mρ = 880 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
Water flows at 50 L/s through a pipe 50 m long with an inside diameter of 200 mm. Use the Darcy friction factor f = 0.015 and g = 9.81 m/s². Find the friction head loss hf.
Two open reservoirs are joined by a pipe 150 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.015. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 60 L/s?
A trapezoidal clean earth channel has a bottom width of 3 m and side slopes of 1.5:1 (horizontal:vertical). Water flows uniformly 1 m deep. Manning n = 0.022 and the bed slope is S = 0.004. Find the flow rate Q in m³/s.
b = 3 my = 1 mz = 1.5n = 0.022S = 0.004
Q = m³/s
22.Open-channel flow (Manning)Hard
A trapezoidal gravel channel with a bottom width of 3.5 m and side slopes of 2:1 (horizontal:vertical) must carry 27 m³/s in uniform flow at a depth of 1.6 m. Manning n = 0.025. Find the required bed slope S (in m/m).
Q = 27 m³/sb = 3.5 my = 1.6 mz = 2n = 0.025
S = m/m
23.Pumps & pump powerMedium
In a test, a pump delivers 40 L/s of water (ρ = 1000 kg/m³) against a head of 44 m while its shaft takes 21.6 kW. Use g = 9.81 m/s². Find the pump efficiency η in percent.
Q = 40 L/sH = 44 mPshaft = 21.6 kWg = 9.81 m/s²
η = %
24.Pumps & pump powerHard
A pump moves 75 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 17 m higher. The pipe is 200 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.015; the minor-loss coefficients add up to ΣK = 5 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 100 kPa. Find the head H the pump must add.
A property is expected to earn net rent of €5 000 next year. The rent is expected to grow by 4% per year forever. The required return is 7% per year. Find the value PV of the property today.
C1 = €5 000g = 4%r = 7%
PV = €
26.Time value of moneyHard
You borrow €5 000 at 5.4% per year, compounded monthly, and repay €175 at the end of every month. How many months does it take until the loan is repaid (the last payment may be smaller)? Give the number of payments N.
P = €5 000A = €1755.4% / 12
N = payments
27.NPV & IRRMedium
An investment of €20 000 gives these cash flows at the end of years 1 to 4: €5 000, €5 000, €5 000, €9 000. The cost of capital is 8%. Find the net present value NPV.
Project A costs €10 000 and returns €5 500, €4 000, €2 000 at the end of years 1 to 3. Project B costs €12 000 and returns €3 000, €4 500, €6 500. Find the crossover rate r* at which both projects have the same NPV, in percent.
Drag z so that the shaded area between −z and z under the standard normal curve is 0.9500. Find z to two decimals.
A = 0.9500
z =
30.Normal distributionHard
The heights of adult men are normally distributed with mean 178 cm and standard deviation 7 cm. Drag the cut-off so the shaded top 10% is to the right of it. Find the cut-off x.
μ = 178 cmσ = 7 cm10%
x = cm
3Solutions
1.Beam support reactions
Answer: RA = 21.5 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Moments about A
Counter-clockwise positive.
ΣMA = 0: RB·10 − 55·5 − 60 = 0
RB = 335/10 = 33.5 kN
Vertical equilibrium
RA = 55 − 33.5 = 21.5 kN
Answer
RA = 21.5 kN
A negative reaction acts downward.
2.Beam support reactions
Answer: MA = 456.7 kN·m
Cantilever equilibrium: a fixed support can push up and also resist rotation, so it gives a vertical reaction RA and a reaction moment MA. ΣFy = 0 gives RA, and moments about the wall give MA = Σ(load × distance from the wall). A distributed load acts as its resultant at the centroid of the load diagram.
Resultant of the triangular load
W = ½·10·8 = 40 kN
x̄ = L/3 = 2.667 m
Moment about the wall
MA = W·x̄ + P·a = 40·2.667 + 70·5 = 456.7 kN·m
Answer
MA = 456.7 kN·m
3.Truss: method of joints
Answer: member BF
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint B
AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.
ΣF⊥ = 0 → FBF = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint C
BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.
ΣF⊥ = 0 → FCG = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 36.67 kN, R2 = 23.33 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = 73.33, MC = 146.7 kN·m, MD = 120, ME = 93.33, MF = 46.67, MG = 0
Answer
Mark C: MC = 146.7 kN·m
6.Shear force & bending moment
Answer: Mmax = 31.5 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 12·2 = 24 kN, acting at x̄ = 2 m
ΣMA = 0: RB·8 = 12·2·2
RB = 48/8 = 6 kN
ΣFy = 0: RA = 24 − 6 = 18 kN
Zero shear
The shear force starts at RA, stays constant over any unloaded part and falls with slope w inside the load.
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
w = 6 N/mm, L = 2500 mm
EI = 2.52 × 10¹² N·mm²
Deflection
δ = wL⁴/(8EI) = 6·2500⁴/(8·2.52 × 10¹²) = 11.63 mm
Answer
δ = 11.63 mm
8.Beam deflection
Answer: Ireq = 685.7 × 10⁶ mm⁴
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Deflection limit
δallow = L/360 = 8000/360 = 22.22 mm
Required second moment of area
I = 5wL⁴/(384·E·δallow) = 5·20·8000⁴/(384·70000·22.22) = 6.857 × 10⁸ mm⁴
Ireq = 685.7 × 10⁶ mm⁴
Answer
Ireq = 685.7 × 10⁶ mm⁴
9.Column buckling
Answer: Pcr = 319.8 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Required critical load
Pcr = n·P = 2.5·45000 = 112500 N
KL = 1·6000 = 6000 mm
Solve for the diameter
d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·112500·6000²/(π³·200000))^(1/4) = 80.41 mm
Answer
d = 80.41 mm
Check: the slenderness KL/r is 298.5, so the column is slender and Euler applies.
11.Centroid & second moment of area
Answer: Ix = 54.91 × 10⁶ mm⁴
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (30000·75 − 2827·90)/(30000 − 2827) = 73.44 mm
Full plate about ȳ
200·150³/12 + 30000·1.561² = 56.32 × 10⁶ mm⁴
Hole about ȳ
π·60⁴/64 + 2827·16.56² = 1.412 × 10⁶ mm⁴
Subtract
Ix = 54.91 × 10⁶ mm⁴
Answer
Ix = 54.91 × 10⁶ mm⁴
12.Centroid & second moment of area
Answer: Ix = 63.68 × 10⁶ mm⁴
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into three rectangles
Measure every y from the bottom edge.
top flange: A = 2240 mm², y = 209 mm
web: A = 1440 mm², y = 112 mm
bottom flange: A = 4400 mm², y = 11 mm
Centroid
ȳ = (2240·209 + 1440·112 + 4400·11)/8080 = 83.89 mm
Parallel-axis theorem
top flange: 160·14³/12 + 2240·125.1² = 3.51 × 10⁷ mm⁴
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·6 = 58.86 kPa
Effective stress
σ′ = σ − u = 185 − 58.86 = 126.1 kPa
Answer
σ′ = 126.1 kPa
14.Effective stress in soil
Answer: σ′ = 72.6 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·2 + γsat,sand·2 + γsat,clay·2.5
σ = 16.5·2 + 20·2 + 17.5·2.5 = 116.8 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·4.5 = 44.15 kPa
Effective stress
σ′ = σ − u = 116.8 − 44.15 = 72.6 kPa
Answer
σ′ = 72.6 kPa
15.Consolidation settlement
Answer: S = 196.1 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 70 + 140 = 210 kPa > 170 kPa
Settlement
Recompression up to σ′p, virgin compression beyond it.
S = 0.02·7.5/(1 + 1.05)·log₁₀(170/70) + 0.5·7.5/(1 + 1.05)·log₁₀(210/170)
S = 28.2 + 167.9 = 196.1 mm
Answer
S = 196.1 mm
16.Consolidation settlement
Answer: t = 1.209 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H/2 = 6/2 = 3 m
Time
t = Tv·Hdr²/cv = 0.403·3²/3 = 1.209 years
Answer
t = 1.209 years
17.Hydrostatic force
Answer: F = 55.18 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 3 + 1.5/2 = 3.75 m
A = H·b = 1.5·1 = 1.5 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3.75·1.5 = 55.18 kN
Answer
F = 55.18 kN
18.Hydrostatic force
Answer: F = 233.1 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 3 + 3/2 = 4.5 m
A = H·b = 3·2 = 6 m²
Resultant force
F = ρ·g·yc·A = 880·9.81·4.5·6 = 233.1 kN
Answer
F = 233.1 kN
19.Pipe friction & head loss
Answer: hf = 0.4841 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Mean velocity
A = π·0.2²/4 = 0.03142 m²
V = Q/A = 0.05/0.03142 = 1.592 m/s
Velocity head
V²/(2g) = 1.592²/(2·9.81) = 0.1291 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.015·(50/0.2)·1.592²/(2·9.81) = 0.4841 m
Answer
hf = 0.4841 m
20.Pipe friction & head loss
Answer: Δz = 13.16 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.06/0.01767 = 3.395 m/s
V²/(2g) = 0.5876 m
Loss coefficients
f·L/D = 0.015·150/0.15 = 15
ΣK = 0.5 + 3·0.3 + 5 + 1.0 = 7.4
Total head loss
hf = 15·0.5876 = 8.814 m
hm = 7.4·0.5876 = 4.348 m
Δz = hf + hm = 13.16 m
Answer
Δz = 13.16 m
21.Open-channel flow (Manning)
Answer: Q = 10.02 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (3 + 1.5·1)·1 = 4.5 m²
P = b + 2y·√(1 + z²) = 3 + 2·1·√(1 + 1.5²) = 6.606 m
R = A/P = 0.6812 m
Velocity
V = (1/0.022)·0.68122/3·0.0041/2 = 2.226 m/s
Flow rate
Q = A·V = 4.5·2.226 = 10.02 m³/s
Answer
Q = 10.02 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.003933 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (3.5 + 2·1.6)·1.6 = 10.72 m²
P = b + 2y·√(1 + z²) = 3.5 + 2·1.6·√(1 + 2²) = 10.66 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.04·44 = 17.27 kW
Efficiency
η = Ph/Pshaft = 17.27/21.6 = 79.93%
Answer
η = 79.93%
24.Pumps & pump power
Answer: H = 33 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are practically at rest, so there is no velocity head term.
H = Δz + p/(ρ·g) + hL = 17 + 10.19 + 5.81 = 33 m
Answer
H = 33 m
25.Time value of money
Answer: PV = 166667 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rearrange the annuity formula
i = 0.0045
(1 + i)−N = 1 − 5 000·0.0045/175 = 0.8714
Solve with logarithms
N = −ln(0.8714)/ln(1.004) = 30.65
Round up to whole payments
30 full payments leave a small balance, which the last, smaller payment clears.
N = 31
Answer
N = 31 payments
27.NPV & IRR
Answer: NPV = −499.2 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −20 000
CF1/(1 + 0.08)1 = 5 000/1.08 = 4 629.63
CF2/(1 + 0.08)2 = 5 000/1.166 = 4 286.69
CF3/(1 + 0.08)3 = 5 000/1.26 = 3 969.16
CF4/(1 + 0.08)4 = 9 000/1.36 = 6 615.27
Add them up
NPV = €−499.25
Answer
NPV = €−499.25
NPV is negative, so the project earns less than the required return.
28.NPV & IRR
Answer: r* = 4.59 %
Crossover rate: the discount rate at which two projects have the same NPV. It is the IRR of the difference in their cash flows (B − A). Below it the project with the later, larger cash flows has the higher NPV; above it the other one wins.
Difference in cash flows
ΔCF0 = −12 000 − (−10 000) = −2 000
ΔCF1 = 3 000 − 5 500 = −2 500
ΔCF2 = 4 500 − 4 000 = 500
ΔCF3 = 6 500 − 2 000 = 4 500
IRR of the difference
NPVΔ(4%) = 58.92
NPVΔ(5%) = −40.17
r* = 4.59%
Answer
r* = 4.59%
Check: at 4.59% both NPVs are €663.40.
29.Normal distribution
Answer: z = 1.96
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left of z
Φ(z) = (1 + 0.9500)/2 = 0.9750
Read the z-table backwards
Find 0.9750 inside the table and read off z.
z = 1.96
Answer
z = 1.96
30.Normal distribution
Answer: x = 187 cm
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left
Φ(z) = 0.9
z from the table
z ≈ 1.28
Back to the original units
x = 178 + 1.28·7 = 187 cm
Answer
x = 187 cm
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.