1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P = 15 kNM = 60 kN·mABRB​ = ?1 m1.5 m3.5 m

The simply supported beam has a pin at A and a roller at B. It carries a point load P at 1 m from A and a clockwise couple M at 2.5 m from A. Find the vertical reaction RB, taking upward as positive.

L = 6 mP = 15 kN at 1 mM = 60 kN·m (clockwise) at 2.5 m
RB = kN
2.Beam support reactionsHard
P = 10 kNADCRD​ = ?3 m3 m2 m

A compound beam is fixed to the wall at A, has an internal hinge at C (3 m from A) and rests on a roller at D (8 m from A). It carries a point load P at 6 m from A. Find the reaction RD at the roller.

AC = 3 mAD = 8 mP = 10 kN at 6 m
RD = kN
3.Truss: method of jointsMedium
ABCDEFGH30 kN4 × 4 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 30 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
4.Truss: method of jointsHard
ABBCACACB35 kN20 kN6 m4 m3 m

Use the method of joints to find the force FBC in member BC. Give tension as positive and compression as negative.

span = 6 mheight = 3 mB is 4 m from Avertical load = 35 kNhorizontal load = 20 kN →
FBC = kN
5.Shear force & bending momentMedium
40 kN35 kNABCDEFG1 m1 m1 m1 m1 m1 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

40 kN @ 3 m35 kN @ 5 m
  1. 1A (x = 0 m)
  2. 2B (x = 1 m)
  3. 3C (x = 2 m)
  4. 4D (x = 3 m)
  5. 5E (x = 4 m)
  6. 6F (x = 5 m)
  7. 7G (x = 6 m)
6.Shear force & bending momentHard
w = 6 kN/mP = 65 kNAB4 m2 m

The simply supported beam carries a uniformly distributed load w over its whole span and a point load P. Find the maximum bending moment Mmax in the beam.

L = 6 mP = 65 kN at 4 mw = 6 kN/m from 0 to 6 m
Mmax = kN·m
7.Beam deflectionMedium
w = 12 kN/mδL = 4 m

A simply supported beam carries a uniformly distributed load w over its whole span. Find the maximum deflection δmax, at midspan.

w = 12 kN/mL = 4 mE = 11 GPa (timber)I = 160 × 10⁶ mm⁴
δmax = mm
8.Beam deflectionHard
w = 4 kN/mδL = 8 m

A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.

w = 4 kN/mL = 8 mE = 11 GPa (timber)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
PL = 4 m40 × 100 mmcross-section

A column of length L made of steel is pinned at both ends. Using Euler’s formula, find its critical buckling load Pcr.

L = 4 mE = 200 GPa (steel)b × h = 40 × 100 mm
Pcr = kN
10.Column bucklingHard
PL = 4 md = 40 mmcross-section

A column of length L made of steel is fixed at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 4 mE = 200 GPa (steel)d = 40 mm
σcr = MPa
11.Centroid & second moment of areaMedium
2401524018xdimensions in mm

Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.

bf = 240 mmtf = 15 mmtw = 18 mmhw = 240 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
180250242301416xdimensions in mm

A welded I-section has a top flange 180 × 24 mm, a web 230 mm high and 16 mm thick, and a bottom flange 250 × 14 mm (width × thickness). Find its second moment of area Ix about the horizontal axis x through its centroid.

top flange: 180 × 24 mmweb: 16 × 230 mmbottom flange: 250 × 14 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
sandγd​ = 15 kN/m³γsat​ = 18.5 kN/m³13 mwater tableXz = 8 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 8 mzw = 2 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 18.5 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 17 kN/m³γsat​ = 19.5 kN/m³6 mclayγsat​ = 18.5 kN/m³4 mwater tableXz = 8 m

For the soil profile shown, find the pore water pressure u at point X.

z = 8 mzw = 4 mγw = 9.81 kN/m³sand: γd = 17 kN/m³sand: γsat = 19.5 kN/m³clay: γsat = 18.5 kN/m³
u = kPa
15.Consolidation settlementMedium
Δσ = 160 kPasandclayCc​ = 0.4, Cr​ = 0.06e0​ = 0.8σ′0​ = 105 kPaσ′p​ = 215 kPa7.5 mwater table

A 7.5 m thick overconsolidated clay layer has Cc = 0.4, Cr = 0.06 and e₀ = 0.8. At its mid-depth the effective vertical stress is 105 kPa and the preconsolidation pressure is 215 kPa. A new building adds 160 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 7.5 mCc = 0.4Cr = 0.06e0 = 0.8σ′0 = 105 kPaσ′p = 215 kPaΔσ = 160 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 2 m2 mimpervious rockwater table

In a laboratory oedometer test, a clay specimen 25 mm thick, drained at the top and bottom, reaches 50% consolidation in 4 min. In the field the same clay forms a layer 2 m thick. It lies on impervious rock, with sand above it, so water drains out only at the top. How many days t does the field layer take to reach 50% consolidation?

hlab = 25 mmtlab = 4 minH = 2 mfield: single drainage
t = days
17.Hydrostatic forceMedium
gated = 1 mH = 3 m

A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 1 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1 mH = 3 mb = 3 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 0.5 mH = 1.5 m

A vertical rectangular gate 1 m wide sits in the wall of a tank of glycerin, with its top edge 0.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 0.5 mH = 1.5 mb = 1 mρ = 1260 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
V = 2 m/sD = 200 mmL = 400 mf = 0.015

Water (ρ = 1000 kg/m³) flows at 2 m/s through a horizontal pipe, 400 m long, with an inside diameter of 200 mm. Use the Darcy friction factor f = 0.015 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 2 m/sL = 400 mD = 200 mmf = 0.015ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 2Δz = 34 mL = 200 m, D = 250 mm, f = 0.0252× bend (K = 0.3)

Two open reservoirs are joined by a pipe 200 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.025. The water surface of the upper reservoir is 34 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 2) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.

Δz = 34 mL = 200 mD = 250 mmf = 0.025Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 2Kexit = 1.0
Q = L/s
21.Open-channel flow (Manning)Medium
b = 1 my = 1.1 m1.5 : 1n = 0.022, S = 0.0005

A trapezoidal clean earth channel has a bottom width of 1 m and side slopes of 1.5:1 (horizontal:vertical). Water flows uniformly 1.1 m deep. Manning n = 0.022 and the bed slope is S = 0.0005. Find the flow rate Q in m³/s.

b = 1 my = 1.1 mz = 1.5n = 0.022S = 0.0005
Q = m³/s
22.Open-channel flow (Manning)Hard
D = 600 mmn = 0.013, V = 0.75 m/s

A concrete sewer with an inside diameter of 600 mm (Manning n = 0.013) must reach a self-cleansing velocity of 0.75 m/s when flowing just full. Find the minimum slope S (in m/m).

D = 600 mmn = 0.013V = 0.75 m/s
S = m/m
23.Pumps & pump powerMedium
PQ = 60 L/sH = 44 m

A pump delivers 60 L/s of water (ρ = 1000 kg/m³) against a head of 44 m. The pump efficiency is 85% and the electric motor driving it has an efficiency of 92%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.

Q = 60 L/sH = 44 mηpump = 85%ηmotor = 92%g = 9.81 m/s²
Pel = kW
24.Pumps & pump powerHard
400 kPa (gauge)PQ = 50 L/sΔz = 22 mL = 100 m, D = 150 mm, f = 0.018, ΣK = 5

A pump moves 50 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 22 m higher. The pipe is 100 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.018; the minor-loss coefficients add up to ΣK = 5 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 400 kPa. Find the head H the pump must add.

Q = 50 L/sΔz = 22 mL = 100 mD = 150 mmf = 0.018ΣK = 5ptank = 400 kPa
H = m
25.Time value of moneyMedium
periods0123…1211 + EAR = ?20% / 12

A credit card charges a nominal interest rate of 20% per year, compounded monthly. Find the effective annual rate EAR in percent.

r = 20%m = 12
EAR = %
26.Time value of moneyHard
months0123…360€200€200€200FV = ?

You save €200 at the end of every month for 30 years. The account pays 7.2% per year, compounded monthly. How much have you saved at the end? Find FV.

A = €2007.2% / 12N = 360
FV = €
27.NPV & IRRMedium
years0123−45 0009 00018 00019 000

An investment of €45 000 gives these cash flows at the end of years 1 to 3: €9 000, €18 000, €19 000. The cost of capital is 6%. Find the net present value NPV.

r = 6%CF0 = −45 000CF1 = 9 000CF2 = 18 000CF3 = 19 000
NPV = €
28.NPV & IRRHard
years012−40 00024 50026 500

A project costs €40 000 and returns €24 500, €26 500 at the end of years 1 to 2. Find its internal rate of return IRR in percent.

CF0 = −40 000CF1 = 24 500CF2 = 26 500
IRR = %
29.Normal distributionMedium
32 min30 minX + Y?

X is normal with mean 12 min and standard deviation 1.5 min; Y is independent and normal with mean 20 min and standard deviation 2 min. Find the probability P that X + Y is more than 30 min. Round z to two decimals.

μX = 12, σX = 1.5μY = 20, σY = 2X + Y > 30 min
P =
30.Normal distributionHard
μ = 32x = ?25%

The delivery times are normally distributed with mean 32 min and standard deviation 6 min. Find the value x below which 25% of them lie (the 25th percentile).

μ = 32σ = 6P = 25%
x = min

3Solutions

1.Beam support reactions

Answer: RB = 12.5 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Moments about A

Counter-clockwise positive.

ΣMA = 0: RB·6 − 15·1 − 60 = 0
RB = 75/6 = 12.5 kN

Vertical equilibrium

RA = 15 − 12.5 = 2.5 kN

Answer

RB = 12.5 kN

A negative reaction acts downward.

2.Beam support reactions

Answer: RD = 6 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation. An internal hinge cannot carry a bending moment, which gives one extra equation: the moment about the hinge of the forces on either side is zero.

Part CD

The hinge has no moment, so moments about C on CD alone must balance.

ΣMC = 0: RD·5 = 10·3
RD = 6 kN
VC = 10 − 6 = 4 kN

Answer

RD = 6 kN
3.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 22.5 kN (T), BC: 15 kN (T), CD: 15 kN (T), DE: 7.5 kN (T), FG: 22.5 kN (C), GH: 7.5 kN (C), AF: 31.82 kN (C), HE: 10.61 kN (C), BF: 22.5 kN (T), CG: 0, DH: 7.5 kN (T), BG: 10.61 kN (T), DG: 10.61 kN (C)

Answer

Zero-force member: CG
4.Truss: method of joints

Answer: FBC = −40.06 kN

Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.

ABBCACACB35 kN20 kNAy​Cy​Ax​

Support reactions

Equilibrium of the whole truss. Moments about A, counter-clockwise positive.

ΣMA = 0: Cy·6 = 35·4 + 20·3 → Cy = 33.33 kN
ΣFy = 0: Ay = 35 − 33.33 = 1.667 kN
ΣFx = 0: Ax = −20 kN

Joint C

The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.

sin γ = 3/3.606 = 0.8321, cos γ = 2/3.606 = 0.5547
ΣFy = 0: Cy + FBC·sin γ = 0 → FBC = −33.33/0.8321 = −40.06 kN

Answer

FBC = −40.06 kN (compression)
5.Shear force & bending moment

Answer: D (x = 3 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 25.83 kN, R2 = 49.17 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 25.83, MC = 51.67, MD = 77.5 kN·m, ME = 63.33, MF = 49.17, MG = 0

Answer

Mark D: MD = 77.5 kN·m
6.Shear force & bending moment

Answer: Mmax = 110.7 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 6·6 = 36 kN, acting at x̄ = 3 m
ΣMA = 0: RB·6 = 65·4 + 6·6·3
RB = 368/6 = 61.33 kN
ΣFy = 0: RA = 101 − 61.33 = 39.67 kN

Where is V = 0?

V(4⁻) = RA − w·4 = 15.67 kN
V(4⁺) = 15.67 − 65 = −49.33 kN
The shear changes sign at the load, so the maximum is under the load.

Maximum moment

Mmax = RA·4 − w·4²/2 = 39.67·4 − 6·4²/2 = 110.7 kN·m

Answer

Mmax = 110.7 kN·m

It occurs at x = 4 m from A.

7.Beam deflection

Answer: δmax = 22.73 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 12 N/mm, L = 4000 mm
EI = 1.76 × 10¹² N·mm²

Deflection

δmax = 5wL⁴/(384EI) = 5·12·4000⁴/(384·1.76 × 10¹²) = 22.73 mm

Answer

δmax = 22.73 mm
8.Beam deflection

Answer: Ireq = 872.7 × 10⁶ mm⁴

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Deflection limit

δallow = L/360 = 8000/360 = 22.22 mm

Required second moment of area

I = 5wL⁴/(384·E·δallow) = 5·4·8000⁴/(384·11000·22.22) = 8.727 × 10⁸ mm⁴
Ireq = 872.7 × 10⁶ mm⁴

Answer

Ireq = 872.7 × 10⁶ mm⁴
9.Column buckling

Answer: Pcr = 65.8 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A rectangle buckles about its weak axis, using the smaller dimension cubed.

Imin = h·b³/12 = 100·40³/12 = 533333 mm⁴

Effective length

KL = 1·4000 = 4000 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·533333/4000² = 65797 N = 65.8 kN

Answer

Pcr = 65.8 kN
10.Column buckling

Answer: σcr = 49.35 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·40⁴/64 = 125664 mm⁴

Radius of gyration and slenderness

A = 1257 mm²
r = √(I/A) = √(125664/1257) = 10 mm
KL = 0.5·4000 = 2000 mm
KL/r = 2000/10 = 200

Critical stress

σcr = π²E/(KL/r)² = π²·200000/200² = 49.35 MPa

Answer

σcr = 49.35 MPa
11.Centroid & second moment of area

Answer: Ix = 52.72 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 240·15 = 3600 mm², yf = 240 + 15/2 = 247.5 mm
web: Aw = 18·240 = 4320 mm², yw = 240/2 = 120 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (3600·247.5 + 4320·120)/7920 = 178 mm

Parallel-axis theorem

flange: 240·15³/12 + 3600·(247.5 − 178)² = 1.748 × 10⁷ mm⁴
web: 18·240³/12 + 4320·(120 − 178)² = 3.525 × 10⁷ mm⁴
Ix = 1.748 × 10⁷ + 3.525 × 10⁷ = 5.272 × 10⁷ mm⁴ = 52.72 × 10⁶ mm⁴

Answer

Ix = 52.72 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: Ix = 137 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into three rectangles

Measure every y from the bottom edge.

top flange: A = 4320 mm², y = 256 mm
web: A = 3680 mm², y = 129 mm
bottom flange: A = 3500 mm², y = 7 mm

Centroid

ȳ = (4320·256 + 3680·129 + 3500·7)/11500 = 139.6 mm

Parallel-axis theorem

top flange: 180·24³/12 + 4320·116.4² = 5.876 × 10⁷ mm⁴
web: 16·230³/12 + 3680·10.58² = 1.663 × 10⁷ mm⁴
bottom flange: 250·14³/12 + 3500·132.6² = 6.158 × 10⁷ mm⁴
Ix = 5.876 × 10⁷ + 1.663 × 10⁷ + 6.158 × 10⁷
Ix = 1.37 × 10⁸ mm⁴ = 137 × 10⁶ mm⁴

Answer

Ix = 137 × 10⁶ mm⁴
13.Effective stress in soil

Answer: σ′ = 82.14 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 15·2 + 18.5·6 = 141 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·6 = 58.86 kPa

Effective stress

σ′ = σ − u = 141 − 58.86 = 82.14 kPa

Answer

σ′ = 82.14 kPa
14.Effective stress in soil

Answer: u = 39.24 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·4 = 39.24 kPa

Answer

u = 39.24 kPa
15.Consolidation settlement

Answer: S = 229.2 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 105 + 160 = 265 kPa > 215 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.06·7.5/(1 + 0.8)·log₁₀(215/105) + 0.4·7.5/(1 + 0.8)·log₁₀(265/215)
S = 77.81 + 151.3 = 229.2 mm

Answer

S = 229.2 mm
16.Consolidation settlement

Answer: t = 71.11 days

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage paths

Hdr,lab = 25/2 = 12.5 mm = 0.0125 m
Hdr,field = 2 m

Scale the time

t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.

tfield = 4·(2/0.0125)² = 102400 min
tfield = 102400/1440 = 71.11 days

Answer

t = 71.11 days
17.Hydrostatic force

Answer: F = 220.7 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1 + 3/2 = 2.5 m
A = H·b = 3·3 = 9 m²
gated = 1 mH = 3 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2.5·9 = 220.7 kN

Answer

F = 220.7 kN
18.Hydrostatic force

Answer: ycp = 1.4 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 0.5 + 1.5/2 = 1.25 m
A = H·b = 1.5·1 = 1.5 m²
gated = 0.5 mH = 1.5 mF

Resultant force

F = ρ·g·yc·A = 1260·9.81·1.25·1.5 = 23.18 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 1·1.5³/12 = 0.2813 m⁴
ycp = yc + Ic/(yc·A) = 1.25 + 0.2813/(1.25·1.5) = 1.4 m

Answer

ycp = 1.4 m
19.Pipe friction & head loss

Answer: Δp = 60 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.015·(400/0.2)·2²/(2·9.81) = 6.116 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·6.116 = 60000 Pa = 60 kPa

Answer

Δp = 60 kPa
20.Pipe friction & head loss

Answer: Q = 258.3 L/s

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Loss coefficients

f·L/D = 0.025·200/0.25 = 20
ΣK = 0.5 + 2·0.3 + 2 + 1.0 = 4.1

Energy equation

Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.

34 = (20 + 4.1)·V²/(2·9.81)
V = √(2·9.81·34/24.1) = 5.261 m/s

Flow rate

Q = V·π·D²/4 = 5.261·0.04909 = 0.2583 m³/s = 258.3 L/s

Answer

Q = 258.3 L/s
21.Open-channel flow (Manning)

Answer: Q = 2.077 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (1 + 1.5·1.1)·1.1 = 2.915 m²
P = b + 2y·√(1 + z²) = 1 + 2·1.1·√(1 + 1.5²) = 4.966 m
R = A/P = 0.587 m

Velocity

V = (1/0.022)·0.5872/3·0.00051/2 = 0.7125 m/s

Flow rate

Q = A·V = 2.915·0.7125 = 2.077 m³/s

Answer

Q = 2.077 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.001193 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Hydraulic radius

R = D/4 = 0.6/4 = 0.15 m

Solve Manning for S

S = (n·V/R2/3)² = (0.013·0.75/0.2823)² = 0.001193

Answer

S = 0.001193

That is a fall of 1.193 m per kilometre.

23.Pumps & pump power

Answer: Pel = 33.12 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.06·44 = 25.9 kW

Shaft power

Pshaft = 25.9/0.85 = 30.47 kW

Electrical power

Pel = 30.47/0.92 = 33.12 kW

Answer

Pel = 33.12 kW
24.Pumps & pump power

Answer: H = 69.71 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.05/0.01767 = 2.829 m/s
V²/(2g) = 0.408 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (12 + 5)·0.408 = 6.937 m

Pressure head

p/(ρ·g) = 400000/(1000·9.81) = 40.77 m

Pump head

Both surfaces are practically at rest, so there is no velocity head term.

H = Δz + p/(ρ·g) + hL = 22 + 40.77 + 6.937 = 69.71 m

Answer

H = 69.71 m
25.Time value of money

Answer: EAR = 21.94 %

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate per period

r/m = 0.2/12 = 0.01667

Compound over one year

EAR = (1 + 0.01667)12 − 1 = 1.219 − 1 = 21.94%

Answer

EAR = 21.94%

The EAR is always above the nominal rate when interest compounds more than once a year.

26.Time value of money

Answer: FV = 253845 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly rate and number of deposits

i = 0.07200000000000001/12 = 0.006
N = 12·30 = 360

Future value of the deposits

FV = A·((1 + i)N − 1)/i = 200·(8.615 − 1)/0.006 = €253 845.09

Answer

FV = €253 845.09

You paid in €72 000 yourself; the rest is interest.

27.NPV & IRR

Answer: NPV = −4537 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of each cash flow

CF0 = −45 000
CF1/(1 + 0.06)1 = 9 000/1.06 = 8 490.57
CF2/(1 + 0.06)2 = 18 000/1.124 = 16 019.94
CF3/(1 + 0.06)3 = 19 000/1.191 = 15 952.77

Add them up

NPV = €−4 536.73

Answer

NPV = €−4 536.73

NPV is negative, so the project earns less than the required return.

28.NPV & IRR

Answer: IRR = 17.59 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(15%) = 1 342.16
NPV(20%) = −1 180.56

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 15 + 5·1 342.16/(1 342.16 − (−1 180.56)) = 17.66%
exact: NPV(17.59%) = 0 → IRR = 17.59%

Answer

IRR = 17.59%
29.Normal distribution

Answer: P = 0.7881

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the sum

μ = 32 min, σ = √(1.5² + 2²) = 2.5 min

Standardise

z = (30 − 32)/2.5 = −0.8

Upper tail

P = 1 − Φ(−0.8) = 1 − 0.2119 = 0.7881

Answer

P = 0.7881
30.Normal distribution

Answer: x = 27.95 min

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z for the percentile

Φ(z) = 0.25 → z = −0.6745

Back to x

x = 32 + −0.6745·6 = 27.95 min

Answer

x = 27.95 min

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.

ExamProblems · examproblems.com/courses/fe-exam-civil