laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. It carries a point load P at 0.5 m from A and a counter-clockwise couple M at 3 m from A. Find the vertical reaction RA, taking upward as positive.
L = 4 mP = 55 kN at 0.5 mM = 40 kN·m (counter-clockwise) at 3 m
RA = kN
2.Beam support reactionsHard
The beam has a pin at A and a roller at B, 5 m from A, and overhangs B to the free end C. It carries a point load P at 2 m from A and a uniformly distributed load w from 5 m to the free end at 8 m. Find the vertical reaction RA, taking upward as positive.
AB = 5 mAC = 8 mP = 45 kN at 2 mw = 4 kN/m from 5 to 8 m
RA = kN
3.Truss: method of jointsMedium
Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.
span = 6 mheight = 2 mB is 4 m from Avertical load = 30 kN
FAC = kN
4.Truss: method of jointsHard
Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.
span = 4 mheight = 2 mB is 3 m from Avertical load = 60 kNhorizontal load = 10 kN →
FAC = kN
5.Shear force & bending momentMedium
Find the bending moment Mx at the section x = 0.5 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 5 mw = 8 kN/m from 0 to 5 mx = 0.5 m
Mx = kN·m
6.Shear force & bending momentHard
The simply supported beam carries a uniformly distributed load over part of its span. Find the distance x0 from A to the section where the bending moment is largest.
L = 5 mw = 8 kN/m from 1 to 5 m
x0 = m
7.Beam deflectionMedium
A simply supported beam carries a uniformly distributed load w over its whole span. Find the maximum deflection δmax, at midspan.
w = 15 kN/mL = 2.5 mE = 70 GPa (aluminium)I = 36 × 10⁶ mm⁴
δmax = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w and a point load P at midspan. Using superposition, find the midspan deflection δmax.
P = 6 kNw = 15 kN/mL = 4 mE = 200 GPa (steel)I = 36 × 10⁶ mm⁴
δmax = mm
9.Column bucklingMedium
A column of length L made of steel is pinned at both ends. Using Euler’s formula, find its critical buckling load Pcr.
L = 2 mE = 200 GPa (steel)d = 50 mm
Pcr = kN
10.Column bucklingHard
A solid round column of length L made of steel is fixed at the base and free at the top. It must carry 100 kN with a factor of safety of 2.5 against buckling. Find the smallest diameter d.
P = 100 kNn = 2.5L = 1 mE = 200 GPa (steel)
d = mm
11.Centroid & second moment of areaMedium
A symmetric I-section has flanges 230 mm wide and 24 mm thick, an overall depth of 420 mm and a web 8 mm thick. Find its second moment of area Ix about the horizontal centroidal axis x.
B = 230 mmH = 420 mmtf = 24 mmtw = 8 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A welded I-section has a top flange 140 × 14 mm, a web 360 mm high and 10 mm thick, and a bottom flange 270 × 18 mm (width × thickness). Find its second moment of area Ix about the horizontal axis x through its centroid.
top flange: 140 × 14 mmweb: 10 × 360 mmbottom flange: 270 × 18 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
For the soil profile shown, find the vertical effective stress σ′ at point X.
A 3 m thick overconsolidated clay layer has Cc = 0.45, Cr = 0.03 and e₀ = 1.15. At its mid-depth the effective vertical stress is 115 kPa and the preconsolidation pressure is 205 kPa. A new building adds 25 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 2.5 m thick has a coefficient of consolidation cv = 1 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 50% average consolidation the time factor is Tv = 0.197. How many years t does the layer take to reach 50% consolidation?
A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 1 m wide sits in the wall of a tank of glycerin, with its top edge 2.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.
Water flows at 25 L/s through a pipe 400 m long with an inside diameter of 100 mm. Use the Darcy friction factor f = 0.018 and g = 9.81 m/s². Find the friction head loss hf.
Two open reservoirs are joined by a pipe 200 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.015. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 120 L/s?
A trapezoidal unfinished concrete channel has a bottom width of 5.5 m and side slopes of 3:1 (horizontal:vertical). Water flows uniformly 1.7 m deep. Manning n = 0.014 and the bed slope is S = 0.0015. Find the flow rate Q in m³/s.
b = 5.5 my = 1.7 mz = 3n = 0.014S = 0.0015
Q = m³/s
22.Open-channel flow (Manning)Hard
A rectangular gravel channel 5 m wide must carry 25 m³/s in uniform flow at a depth of 2.1 m. Manning n = 0.025. Find the required bed slope S (in m/m).
Q = 25 m³/sb = 5 my = 2.1 mn = 0.025
S = m/m
23.Pumps & pump powerMedium
A pump with an efficiency of 70% delivers 40 L/s of water (ρ = 1000 kg/m³) against a head of 16 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.
Q = 40 L/sH = 16 mη = 70%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
A pump moves 40 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 10 m higher. The pipe is 400 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.02; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.
You invest €5 000 at 4% per year with continuous compounding. Find the value FV after 17 years.
PV = €5 000r = 4%t = 17
FV = €
26.Time value of moneyHard
You want €75 000 in 10 years. You save the same amount at the end of every month in an account paying 3.6% per year, compounded monthly. Find the monthly deposit A.
FV = €75 0003.6% / 12N = 120
A = €
27.NPV & IRRMedium
An investment of €20 000 gives these cash flows at the end of years 1 to 4: €6 000, €9 000, €7 000, €7 000. The cost of capital is 12%. Find the net present value NPV.
A project costs €50 000 and returns €22 500, €36 000 at the end of years 1 to 2. Find its internal rate of return IRR in percent.
CF0 = −50 000CF1 = 22 500CF2 = 36 000
IRR = %
29.Normal distributionMedium
Drag z so that the shaded area under the standard normal curve, to the right of z, is 0.6255. Find z to two decimals.
A = 0.6255
z =
30.Normal distributionHard
The exam scores are normally distributed with mean 65 points and standard deviation 10 points. Find the value x below which 5% of them lie (the 5th percentile).
μ = 65σ = 10P = 5%
x = points
3Solutions
1.Beam support reactions
Answer: RA = 58.13 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Moments about A
Counter-clockwise positive.
ΣMA = 0: RB·4 − 55·0.5 + 40 = 0
RB = −12.5/4 = −3.125 kN
Vertical equilibrium
RA = 55 − (−3.125) = 58.13 kN
Answer
RA = 58.13 kN
A negative reaction acts downward.
2.Beam support reactions
Answer: RA = 23.4 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Resultant of the distributed load
W = 4·3 = 12 kN, x̄ = (5 + 8)/2 = 6.5 m
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·5 = 45·2 + 12·6.5
RB = 168/5 = 33.6 kN
RA = 57 − 33.6 = 23.4 kN
Answer
RA = 23.4 kN
3.Truss: method of joints
Answer: FAC = 20 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·6 = 30·4 → Cy = 20 kN
ΣFy = 0: Ay = 30 − 20 = 10 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
sin γ = 2/2.828 = 0.7071, cos γ = 2/2.828 = 0.7071
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·4 = 60·3 + 10·2 → Cy = 50 kN
ΣFy = 0: Ay = 60 − 50 = 10 kN
ΣFx = 0: Ax = −10 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
sin γ = 2/2.236 = 0.8944, cos γ = 1/2.236 = 0.4472
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 8·5 = 40 kN, acting at x̄ = 2.5 m
ΣMA = 0: RB·5 = 8·5·2.5
RB = 100/5 = 20 kN
ΣFy = 0: RA = 40 − 20 = 20 kN
Cut at x = 0.5 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 20·0.5 − 8·0.5·0.25 = 9 kN·m
Answer
Mx = 9 kN·m
6.Shear force & bending moment
Answer: x0 = 2.6 m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 8·4 = 32 kN, acting at x̄ = 3 m
ΣMA = 0: RB·5 = 8·4·3
RB = 96/5 = 19.2 kN
ΣFy = 0: RA = 32 − 19.2 = 12.8 kN
Zero shear
The shear force starts at RA, stays constant over any unloaded part and falls with slope w inside the load.
RA − w·(x0 − 1) = 0
x0 = 1 + 12.8/8 = 2.6 m
Answer
x0 = 2.6 m
7.Beam deflection
Answer: δmax = 3.028 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
w = 15 N/mm, L = 2500 mm
EI = 2.52 × 10¹² N·mm²
Deflection
δmax = 5wL⁴/(384EI) = 5·15·2500⁴/(384·2.52 × 10¹²) = 3.028 mm
Answer
δmax = 3.028 mm
8.Beam deflection
Answer: δmax = 8.056 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 6000 N, w = 15 N/mm, L = 4000 mm, EI = 7.2 × 10¹² N·mm²
Each load on its own
δP = PL³/(48EI) = 6000·4000³/(48·7.2 × 10¹²) = 1.111 mm
δw = 5wL⁴/(384EI) = 5·15·4000⁴/(384·7.2 × 10¹²) = 6.944 mm
Add them
δmax = 1.111 + 6.944 = 8.056 mm
Answer
δmax = 8.056 mm
9.Column buckling
Answer: Pcr = 151.4 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Required critical load
Pcr = n·P = 2.5·100000 = 250000 N
KL = 2·1000 = 2000 mm
Solve for the diameter
d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·250000·2000²/(π³·200000))^(1/4) = 56.68 mm
Answer
d = 56.68 mm
Check: the slenderness KL/r is 141.1, so the column is slender and Euler applies.
11.Centroid & second moment of area
Answer: Ix = 467.7 × 10⁶ mm⁴
Second moment of area: for a rectangle about its own centroidal axis I = bh³/12, and about its base bh³/3 (parallel-axis theorem I = Ic + A·d²). A hole is handled by subtracting its I, as long as both parts share the same axis. The elastic section modulus is S = I/c, where c is the distance to the extreme fibre.
Outer rectangle minus the two side cut-outs
Both cut-outs together are (B − tw) wide and hw = H − 2tf high, and share the axis x.
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into three rectangles
Measure every y from the bottom edge.
top flange: A = 1960 mm², y = 385 mm
web: A = 3600 mm², y = 198 mm
bottom flange: A = 4860 mm², y = 9 mm
Centroid
ȳ = (1960·385 + 3600·198 + 4860·9)/10420 = 145 mm
Parallel-axis theorem
top flange: 140·14³/12 + 1960·240² = 1.129 × 10⁸ mm⁴
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·2 = 19.62 kPa
Effective stress
σ′ = σ − u = 99 − 19.62 = 79.38 kPa
Answer
σ′ = 79.38 kPa
14.Effective stress in soil
Answer: σ′ = 69.73 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·1 + γsat,sand·3 + γsat,clay·3.5
σ = 15·1 + 18.5·3 + 18·3.5 = 133.5 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·6.5 = 63.77 kPa
Effective stress
σ′ = σ − u = 133.5 − 63.77 = 69.73 kPa
Answer
σ′ = 69.73 kPa
15.Consolidation settlement
Answer: S = 3.576 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 115 + 25 = 140 kPa ≤ 205 kPa
Settlement
The clay stays on its recompression line.
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.03·3/(1 + 1.15)·log₁₀(140/115) = 3.576 mm
Answer
S = 3.576 mm
16.Consolidation settlement
Answer: t = 0.3078 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H/2 = 2.5/2 = 1.25 m
Time
t = Tv·Hdr²/cv = 0.197·1.25²/1 = 0.3078 years
Answer
t = 0.3078 years
17.Hydrostatic force
Answer: F = 99.33 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1.5 + 1.5/2 = 2.25 m
A = H·b = 1.5·3 = 4.5 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·2.25·4.5 = 99.33 kN
Answer
F = 99.33 kN
18.Hydrostatic force
Answer: ycp = 3.595 m
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 2.5 + 2/2 = 3.5 m
A = H·b = 2·1 = 2 m²
Resultant force
F = ρ·g·yc·A = 1260·9.81·3.5·2 = 86.52 kN
Centre of pressure
Pressure grows with depth, so the resultant acts below the centroid.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Mean velocity
A = π·0.1²/4 = 0.007854 m²
V = Q/A = 0.025/0.007854 = 3.183 m/s
Velocity head
V²/(2g) = 3.183²/(2·9.81) = 0.5164 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.018·(400/0.1)·3.183²/(2·9.81) = 37.18 m
Answer
hf = 37.18 m
20.Pipe friction & head loss
Answer: Δz = 2.6 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.12/0.07069 = 1.698 m/s
V²/(2g) = 0.1469 m
Loss coefficients
f·L/D = 0.015·200/0.3 = 10
ΣK = 0.5 + 4·0.3 + 5 + 1.0 = 7.7
Total head loss
hf = 10·0.1469 = 1.469 m
hm = 7.7·0.1469 = 1.131 m
Δz = hf + hm = 2.6 m
Answer
Δz = 2.6 m
21.Open-channel flow (Manning)
Answer: Q = 53.4 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (5.5 + 3·1.7)·1.7 = 18.02 m²
P = b + 2y·√(1 + z²) = 5.5 + 2·1.7·√(1 + 3²) = 16.25 m
R = A/P = 1.109 m
Velocity
V = (1/0.014)·1.1092/3·0.00151/2 = 2.964 m/s
Flow rate
Q = A·V = 18.02·2.964 = 53.4 m³/s
Answer
Q = 53.4 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.002971 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.04·16 = 6.278 kW
Shaft power
Pshaft = Ph/η = 6.278/0.7 = 8.969 kW
Answer
Pshaft = 8.969 kW
24.Pumps & pump power
Answer: H = 25.49 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are open and practically at rest, so pressure and velocity terms drop out.
H = Δz + hL = 10 + 15.49 = 25.49 m
Answer
H = 25.49 m
25.Time value of money
Answer: FV = 9869 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Exponent
r·t = 0.04·17 = 0.68
e0.68 = 1.974
Future value
FV = 5 000·1.974 = €9 869.39
Answer
FV = €9 869.39
26.Time value of money
Answer: A = 520.2 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −20 000
CF1/(1 + 0.12)1 = 6 000/1.12 = 5 357.14
CF2/(1 + 0.12)2 = 9 000/1.254 = 7 174.74
CF3/(1 + 0.12)3 = 7 000/1.405 = 4 982.46
CF4/(1 + 0.12)4 = 7 000/1.574 = 4 448.63
Add them up
NPV = €1 962.98
Answer
NPV = €1 962.98
NPV is positive, so the project earns more than the required return.
28.NPV & IRR
Answer: IRR = 10.29 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(10%) = 206.61
NPV(15%) = −3 213.61
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left of z
Φ(z) = 1 − 0.6255 = 0.3745
Read the z-table backwards
Find 0.3745 inside the table and read off z.
z = −0.32
Answer
z = −0.32
30.Normal distribution
Answer: x = 48.55 points
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z for the percentile
Φ(z) = 0.05 → z = −1.645
Back to x
x = 65 + −1.645·10 = 48.55 points
Answer
x = 48.55 points
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.