laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 10 mP1 = 10 kN at 3 mP2 = 60 kN at 5 m
RB = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.
L = 6 mP = 45 kN at 2.5 mw = 5 kN/m from 1 to 4 m
RA = kN
3.Truss: method of jointsMedium
Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.
span = 6 mheight = 3 mB is 5 m from Avertical load = 60 kN
FAC = kN
4.Truss: method of jointsHard
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
B: 15 kN ↓D: 25 kN ↓F: 40 kN ↓H: 35 kN ←
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member FC
13member HC
5.Shear force & bending momentMedium
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
35 kN @ 3 m12 kN/m, 1–6 m
1A (x = 0 m)
2B (x = 1 m)
3C (x = 2 m)
4D (x = 3 m)
5E (x = 4 m)
6F (x = 5 m)
7G (x = 6 m)
6.Shear force & bending momentHard
The simply supported beam carries a uniformly distributed load w over its whole span and a point load P. Find the maximum bending moment Mmax in the beam.
L = 10 mP = 15 kN at 4 mw = 4 kN/m from 0 to 10 m
Mmax = kN·m
7.Beam deflectionMedium
A simply supported beam carries a uniformly distributed load w over its whole span. Find the maximum deflection δmax, at midspan.
w = 4 kN/mL = 5 mE = 70 GPa (aluminium)I = 84 × 10⁶ mm⁴
δmax = mm
8.Beam deflectionHard
A propped cantilever is fixed at A and simply supported (propped) at B. It carries a uniformly distributed load w over its whole length. EI is constant. Find the size of the bending moment MA at the fixed end.
L = 4 mw = 15 kN/m
MA = kN·m
9.Column bucklingMedium
A column of length L made of aluminium is fixed at the base and free at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 3 mE = 70 GPa (aluminium)b × h = 40 × 50 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of aluminium is fixed at the base and pinned at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 6 mE = 70 GPa (aluminium)d = 50 mm
σcr = MPa
11.Centroid & second moment of areaMedium
Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.
bf = 280 mmtf = 20 mmtw = 12 mmhw = 240 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
The T-section is used as a beam with the flange on top and carries a sagging bending moment of 20 kN·m. Find the size of the bending stress σtop at the top edge.
A 5.5 m thick overconsolidated clay layer has Cc = 0.35, Cr = 0.05 and e₀ = 0.8. At its mid-depth the effective vertical stress is 60 kPa and the preconsolidation pressure is 90 kPa. A new building adds 15 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 10 m thick has a coefficient of consolidation cv = 1.2 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 90% average consolidation the time factor is Tv = 0.848. How many years t does the layer take to reach 90% consolidation?
A vertical rectangular gate 1.5 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 2 m wide sits in the wall of a tank of glycerin, with its top edge 1.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.
Water (ρ = 1000 kg/m³) flows at 1.7 m/s through a horizontal pipe, 100 m long, with an inside diameter of 250 mm. Use the Darcy friction factor f = 0.018 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.
A pipe 150 m long with an inside diameter of 200 mm (Darcy friction factor f = 0.018) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each) and a valve (K = 10). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 100 L/s?
A trapezoidal grass-lined earth channel has a bottom width of 5 m and side slopes of 2:1 (horizontal:vertical). Water flows uniformly 1.4 m deep. Manning n = 0.03 and the bed slope is S = 0.003. Find the flow rate Q in m³/s.
b = 5 my = 1.4 mz = 2n = 0.03S = 0.003
Q = m³/s
22.Open-channel flow (Manning)Hard
A trapezoidal grass-lined earth channel with a bottom width of 5 m and side slopes of 1.5:1 (horizontal:vertical) must carry 3 m³/s in uniform flow at a depth of 0.7 m. Manning n = 0.03. Find the required bed slope S (in m/m).
Q = 3 m³/sb = 5 my = 0.7 mz = 1.5n = 0.03
S = m/m
23.Pumps & pump powerMedium
A pump delivers 30 L/s of water (ρ = 1000 kg/m³) against a head of 32 m. The pump efficiency is 72% and the electric motor driving it has an efficiency of 90%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.
A pump moves 50 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 15 m higher. The pipe is 150 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.02; the minor-loss coefficients add up to ΣK = 3 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 400 kPa. Find the head H the pump must add.
You invest €1 000 at 3% per year with continuous compounding. Find the value FV after 11 years.
PV = €1 000r = 3%t = 11
FV = €
26.Time value of moneyHard
You save €200 at the end of every month for 8 years. The account pays 4.8% per year, compounded monthly. How much have you saved at the end? Find FV.
A = €2004.8% / 12N = 96
FV = €
27.NPV & IRRMedium
An investment of €60 000 gives these cash flows at the end of years 1 to 3: €13 000, €27 000, €17 000. The cost of capital is 15%. Find the net present value NPV.
A project costs €20 000 and returns €14 000, €10 500, €11 000 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
CF0 = −20 000CF1 = 14 000CF2 = 10 500CF3 = 11 000
IRR = %
29.Normal distributionMedium
Drag z so that the shaded area under the standard normal curve, to the right of z, is 0.6628. Find z to two decimals.
A = 0.6628
z =
30.Normal distributionHard
The heights of adult men are normally distributed with mean 178 cm and standard deviation 7 cm. Drag the cut-off so the shaded bottom 25% is to the left of it. Find the cut-off x.
μ = 178 cmσ = 7 cm25%
x = cm
3Solutions
1.Beam support reactions
Answer: RB = 33 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·10 = 10·3 + 60·5
RB = 330/10 = 33 kN
ΣFy = 0: RA = 70 − 33 = 37 kN
Answer
RB = 33 kN
2.Beam support reactions
Answer: RA = 35 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
UDL resultant: W = w·ℓ = 5·3 = 15 kN, acting at x̄ = 2.5 m
ΣMA = 0: RB·6 = 45·2.5 + 5·3·2.5
RB = 150/6 = 25 kN
ΣFy = 0: RA = 60 − 25 = 35 kN
Answer
RA = 35 kN
3.Truss: method of joints
Answer: FAC = 16.67 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·6 = 60·5 → Cy = 50 kN
ΣFy = 0: Ay = 60 − 50 = 10 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
sin γ = 3/3.162 = 0.9487, cos γ = 1/3.162 = 0.3162
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint G
FG and GH lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.
ΣF⊥ = 0 → FCG = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 42.5 kN, R2 = 52.5 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = 42.5, MC = 79, MD = 103.5 kN·m, ME = 81, MF = 46.5, MG = 0
Answer
Mark D: MD = 103.5 kN·m
6.Shear force & bending moment
Answer: Mmax = 84 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 4·10 = 40 kN, acting at x̄ = 5 m
ΣMA = 0: RB·10 = 15·4 + 4·10·5
RB = 260/10 = 26 kN
ΣFy = 0: RA = 55 − 26 = 29 kN
Where is V = 0?
V(4⁻) = RA − w·4 = 13 kN
V(4⁺) = 13 − 15 = −2 kN
The shear changes sign at the load, so the maximum is under the load.
Maximum moment
Mmax = RA·4 − w·4²/2 = 29·4 − 4·4²/2 = 84 kN·m
Answer
Mmax = 84 kN·m
It occurs at x = 4 m from A.
7.Beam deflection
Answer: δmax = 5.536 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
w = 4 N/mm, L = 5000 mm
EI = 5.88 × 10¹² N·mm²
Deflection
δmax = 5wL⁴/(384EI) = 5·4·5000⁴/(384·5.88 × 10¹²) = 5.536 mm
Answer
δmax = 5.536 mm
8.Beam deflection
Answer: MA = 30 kN·m
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).
Remove the prop
Without the prop the beam is a cantilever. Its free end would deflect under the load.
δload = wL⁴/(8EI)
Compatibility at the prop
The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·50⁴/64 = 306796 mm⁴
Radius of gyration and slenderness
A = 1963 mm²
r = √(I/A) = √(306796/1963) = 12.5 mm
KL = 0.7·6000 = 4200 mm
KL/r = 4200/12.5 = 336
Critical stress
σcr = π²E/(KL/r)² = π²·70000/336² = 6.12 MPa
Answer
σcr = 6.12 MPa
11.Centroid & second moment of area
Answer: Ix = 46.15 × 10⁶ mm⁴
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 280·20 = 5600 mm², yf = 240 + 20/2 = 250 mm
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 160·25 = 4000 mm², yf = 280 + 25/2 = 292.5 mm
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·1 = 9.81 kPa
Effective stress
σ′ = σ − u = 50.5 − 9.81 = 40.69 kPa
Answer
σ′ = 40.69 kPa
14.Effective stress in soil
Answer: σ′ = 75.64 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·1 + γsat,sand·3 + γsat,clay·3
σ = 16·1 + 20.5·3 + 19·3 = 134.5 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·6 = 58.86 kPa
Effective stress
σ′ = σ − u = 134.5 − 58.86 = 75.64 kPa
Answer
σ′ = 75.64 kPa
15.Consolidation settlement
Answer: S = 14.81 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 60 + 15 = 75 kPa ≤ 90 kPa
Settlement
The clay stays on its recompression line.
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.05·5.5/(1 + 0.8)·log₁₀(75/60) = 14.81 mm
Answer
S = 14.81 mm
16.Consolidation settlement
Answer: t = 70.67 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H = 10 m
Time
t = Tv·Hdr²/cv = 0.848·10²/1.2 = 70.67 years
Answer
t = 70.67 years
17.Hydrostatic force
Answer: F = 29.43 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1.5 + 1/2 = 2 m
A = H·b = 1·1.5 = 1.5 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·2·1.5 = 29.43 kN
Answer
F = 29.43 kN
18.Hydrostatic force
Answer: ycp = 2.633 m
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1.5 + 2/2 = 2.5 m
A = H·b = 2·2 = 4 m²
Resultant force
F = ρ·g·yc·A = 1260·9.81·2.5·4 = 123.6 kN
Centre of pressure
Pressure grows with depth, so the resultant acts below the centroid.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Head loss
hf = f·(L/D)·V²/(2g) = 0.018·(100/0.25)·1.7²/(2·9.81) = 1.061 m
Pressure drop
The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.1/0.03142 = 3.183 m/s
V²/(2g) = 0.5164 m
Loss coefficients
f·L/D = 0.018·150/0.2 = 13.5
ΣK = 0.5 + 3·0.3 + 10 = 11.4
Energy equation
The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.
H = (1 + 13.5 + 11.4)·0.5164 = 13.38 m
Answer
H = 13.38 m
21.Open-channel flow (Manning)
Answer: Q = 19.53 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (5 + 2·1.4)·1.4 = 10.92 m²
P = b + 2y·√(1 + z²) = 5 + 2·1.4·√(1 + 2²) = 11.26 m
R = A/P = 0.9697 m
Velocity
V = (1/0.03)·0.96972/3·0.0031/2 = 1.789 m/s
Flow rate
Q = A·V = 10.92·1.789 = 19.53 m³/s
Answer
Q = 19.53 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.0009718 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (5 + 1.5·0.7)·0.7 = 4.235 m²
P = b + 2y·√(1 + z²) = 5 + 2·0.7·√(1 + 1.5²) = 7.524 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.03·32 = 9.418 kW
Shaft power
Pshaft = 9.418/0.72 = 13.08 kW
Electrical power
Pel = 13.08/0.9 = 14.53 kW
Answer
Pel = 14.53 kW
24.Pumps & pump power
Answer: H = 65.16 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are practically at rest, so there is no velocity head term.
H = Δz + p/(ρ·g) + hL = 15 + 40.77 + 9.385 = 65.16 m
Answer
H = 65.16 m
25.Time value of money
Answer: FV = 1391 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Exponent
r·t = 0.03·11 = 0.33
e0.33 = 1.391
Future value
FV = 1 000·1.391 = €1 390.97
Answer
FV = €1 390.97
26.Time value of money
Answer: FV = 23351 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
You paid in €19 200 yourself; the rest is interest.
27.NPV & IRR
Answer: NPV = −17102 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −60 000
CF1/(1 + 0.15)1 = 13 000/1.15 = 11 304.35
CF2/(1 + 0.15)2 = 27 000/1.322 = 20 415.88
CF3/(1 + 0.15)3 = 17 000/1.521 = 11 177.78
Add them up
NPV = €−17 102.00
Answer
NPV = €−17 102.00
NPV is negative, so the project earns less than the required return.
28.NPV & IRR
Answer: IRR = 37.37 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(35%) = 602.55
NPV(40%) = −634.11
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
IRR ≈ 35 + 5·602.55/(602.55 − (−634.11)) = 37.44%
exact: NPV(37.37%) = 0 → IRR = 37.37%
Answer
IRR = 37.37%
29.Normal distribution
Answer: z = −0.42
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left of z
Φ(z) = 1 − 0.6628 = 0.3372
Read the z-table backwards
Find 0.3372 inside the table and read off z.
z = −0.42
Answer
z = −0.42
30.Normal distribution
Answer: x = 173.3 cm
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left
Φ(z) = 0.25
z from the table
z ≈ −0.67
Back to the original units
x = 178 − 0.67·7 = 173.3 cm
Answer
x = 173.3 cm
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.