laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.
L = 4 mP1 = 55 kN at 1 mP2 = 25 kN at 2 m
RA = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. A load P acts at 0.5 m from A, inclined at 45° to the horizontal, and a vertical load Q acts at 3.5 m from A. Find the magnitude of the total reaction force RA at the pin A.
L = 6 mP = 20 kN at 0.5 m, θ = 45°Q = 45 kN at 3.5 m
RA = kN
3.Truss: method of jointsMedium
Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.
span = 4 mheight = 3 mB is 3 m from Avertical load = 35 kN
FAB = kN
4.Truss: method of jointsHard
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
35 kN @ 6 m50 kN @ 10 m
1A (x = 0 m)
2B (x = 2 m)
3C (x = 4 m)
4D (x = 6 m)
5E (x = 8 m)
6F (x = 10 m)
7G (x = 12 m)
6.Shear force & bending momentHard
The simply supported beam carries a uniformly distributed load over part of its span. Find the maximum bending moment Mmax in the beam.
L = 5 mw = 12 kN/m from 2 to 4 m
Mmax = kN·m
7.Beam deflectionMedium
A cantilever of length L is fixed at A and carries a point load P at a distance a = 1.5 m from A. Find the deflection δB at the free end B.
P = 26 kNa = 1.5 mL = 2.5 mE = 11 GPa (timber)I = 120 × 10⁶ mm⁴
δB = mm
8.Beam deflectionHard
A simply supported timber beam of rectangular section, 75 mm wide, carries a uniformly distributed load w over its whole span. Its midspan deflection may not exceed span/360. Find the smallest depth hreq of the section.
w = 3 kN/mL = 5 mE = 11 GPa (timber)b = 75 mm
hreq = mm
9.Column bucklingMedium
A column of length L made of steel is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 4 mE = 200 GPa (steel)b × h = 25 × 50 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of steel is fixed at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 3 mE = 200 GPa (steel)d = 60 mm
σcr = MPa
11.Centroid & second moment of areaMedium
Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.
bf = 120 mmtf = 25 mmtw = 18 mmhw = 160 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A 100 mm × 300 mm plate has a rectangular cut-out 40 mm wide and 20 mm high, centred on the vertical centre line with its centre 180 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 100 mmh = 300 mmcut-out: 40 × 20 mmhole centre: y = 180 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
For the soil profile shown, find the pore water pressure u at point X.
A 2 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.04 and e₀ = 0.85. At its mid-depth the effective vertical stress is 85 kPa and the overconsolidation ratio is OCR = 3. A new building adds 80 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 7.5 m thick has a coefficient of consolidation cv = 2 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 90% average consolidation the time factor is Tv = 0.848. How many years t does the layer take to reach 90% consolidation?
A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 1.5 m wide sits in the wall of a tank of oil, with its top edge 4 m below the surface. Find the resultant hydrostatic force F on the gate.
d = 4 mH = 2 mb = 1.5 mρ = 880 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
Water flows at 120 L/s through a pipe 400 m long with an inside diameter of 300 mm. Use the Darcy friction factor f = 0.025 and g = 9.81 m/s². Find the friction head loss hf.
Two open reservoirs are joined by a pipe 200 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.022. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 80 L/s?
A trapezoidal finished concrete channel has a bottom width of 1.5 m and side slopes of 1.5:1 (horizontal:vertical). Water flows uniformly 2.4 m deep. Manning n = 0.012 and the bed slope is S = 0.0008. Find the flow rate Q in m³/s.
b = 1.5 my = 2.4 mz = 1.5n = 0.012S = 0.0008
Q = m³/s
22.Open-channel flow (Manning)Hard
A concrete sewer with an inside diameter of 450 mm (Manning n = 0.013) must reach a self-cleansing velocity of 1.2 m/s when flowing just full. Find the minimum slope S (in m/m).
D = 450 mmn = 0.013V = 1.2 m/s
S = m/m
23.Pumps & pump powerMedium
In a test, a pump delivers 40 L/s of water (ρ = 1000 kg/m³) against a head of 12 m while its shaft takes 5.7 kW. Use g = 9.81 m/s². Find the pump efficiency η in percent.
Q = 40 L/sH = 12 mPshaft = 5.7 kWg = 9.81 m/s²
η = %
24.Pumps & pump powerHard
A pump moves 50 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 6 m higher. The pipe is 200 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.018; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.
An annuity pays €3 000 at the end of each year for 12 years. The interest rate is 7% per year. Find the present value PV of the annuity.
A = €3 000i = 7%n = 12
PV = €
26.Time value of moneyHard
A loan of €150 000 is repaid with equal monthly payments over 20 years. The interest rate is 4.8% per year, compounded monthly. Find the monthly payment A.
P = €150 0004.8% / 12N = 240
A = €
27.NPV & IRRMedium
A project costs €40 000 today and returns €11 500, €11 000, €10 500, €11 500, €14 500, €14 000 at the end of years 1 to 6. The cost of capital is 12%. Assume cash flows arrive evenly through each year. Find the discounted payback period DPB in years.
A project costs €150 000 today. Its cash flow is €23 500 at the end of year 1 and grows by 5% per year until the last cash flow at the end of year 7. The cost of capital is 12%. Find the net present value NPV.
C0 = €150 000CF1 = €23 500g = 5%n = 7r = 12%
NPV = €
29.Normal distributionMedium
Drag z so that the shaded area under the standard normal curve, to the right of z, is 0.9664. Find z to two decimals.
A = 0.9664
z =
30.Normal distributionHard
The IQ scores are normally distributed with mean 100 points and standard deviation 15 points. Drag the cut-off so the shaded bottom 20% is to the left of it. Find the cut-off x.
μ = 100 pointsσ = 15 points20%
x = points
3Solutions
1.Beam support reactions
Answer: RA = 53.75 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·4 = 55·1 + 25·2
RB = 105/4 = 26.25 kN
ΣFy = 0: RA = 80 − 26.25 = 53.75 kN
Answer
RA = 53.75 kN
2.Beam support reactions
Answer: RA = 34.72 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·4 = 35·3 → Cy = 26.25 kN
ΣFy = 0: Ay = 35 − 26.25 = 8.75 kN
Joint A
Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.
sin α = 3/4.243 = 0.7071
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −8.75/0.7071 = −12.37 kN
Answer
FAB = −12.37 kN (compression)
4.Truss: method of joints
Answer: member BF
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint B
AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.
ΣF⊥ = 0 → FBF = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 25.83 kN, R2 = 59.17 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = 51.67, MC = 103.3, MD = 155 kN·m, ME = 136.7, MF = 118.3, MG = 0
Answer
Mark D: MD = 155 kN·m
6.Shear force & bending moment
Answer: Mmax = 23.04 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 12·2 = 24 kN, acting at x̄ = 3 m
ΣMA = 0: RB·5 = 12·2·3
RB = 72/5 = 14.4 kN
ΣFy = 0: RA = 24 − 14.4 = 9.6 kN
Zero shear
The shear force starts at RA, stays constant over any unloaded part and falls with slope w inside the load.
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 26000 N, a = 1500 mm, L = 2500 mm
EI = 1.32 × 10¹² N·mm²
Deflection at the free end
Deflection at the load plus the slope at the load times the remaining length.
δP = Pa³/(3EI) = 22.16 mm
θP = Pa²/(2EI) = 0.02216 rad
δB = δP + θP·(L − a) = Pa²(3L − a)/(6EI) = 44.32 mm
Answer
δB = 44.32 mm
8.Beam deflection
Answer: hreq = 294.6 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
bh³/12 = Ireq → h = (12·1.598 × 10⁸/75)1/3 = 294.6 mm
Answer
hreq = 294.6 mm
In practice, choose the next standard depth above this value.
9.Column buckling
Answer: Pcr = 16.39 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·60⁴/64 = 636173 mm⁴
Radius of gyration and slenderness
A = 2827 mm²
r = √(I/A) = √(636173/2827) = 15 mm
KL = 0.5·3000 = 1500 mm
KL/r = 1500/15 = 100
Critical stress
σcr = π²E/(KL/r)² = π²·200000/100² = 197.4 MPa
Answer
σcr = 197.4 MPa
11.Centroid & second moment of area
Answer: Ix = 18.87 × 10⁶ mm⁴
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 120·25 = 3000 mm², yf = 160 + 25/2 = 172.5 mm
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (30000·150 − 800·180)/(30000 − 800) = 149.2 mm
Full plate about ȳ
100·300³/12 + 30000·0.8219² = 225 × 10⁶ mm⁴
Hole about ȳ
40·20³/12 + 800·30.82² = 0.7867 × 10⁶ mm⁴
Subtract
Ix = 224.2 × 10⁶ mm⁴
Answer
Ix = 224.2 × 10⁶ mm⁴
13.Effective stress in soil
Answer: u = 19.62 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·2 = 19.62 kPa
Answer
u = 19.62 kPa
14.Effective stress in soil
Answer: σ = 123 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·2 + γsat,sand·2 + γsat,clay·3
σ = 17·2 + 19·2 + 17·3 = 123 kPa
Answer
σ = 123 kPa
15.Consolidation settlement
Answer: S = 12.46 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Preconsolidation pressure
σ′p = OCR·σ′0 = 3·85 = 255 kPa
Compare with the preconsolidation pressure
σ′f = 85 + 80 = 165 kPa ≤ 255 kPa
Settlement
The clay stays on its recompression line.
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.04·2/(1 + 0.85)·log₁₀(165/85) = 12.46 mm
Answer
S = 12.46 mm
16.Consolidation settlement
Answer: t = 5.962 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H/2 = 7.5/2 = 3.75 m
Time
t = Tv·Hdr²/cv = 0.848·3.75²/2 = 5.962 years
Answer
t = 5.962 years
17.Hydrostatic force
Answer: F = 134.9 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1.5 + 2.5/2 = 2.75 m
A = H·b = 2.5·2 = 5 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·2.75·5 = 134.9 kN
Answer
F = 134.9 kN
18.Hydrostatic force
Answer: F = 129.5 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 4 + 2/2 = 5 m
A = H·b = 2·1.5 = 3 m²
Resultant force
F = ρ·g·yc·A = 880·9.81·5·3 = 129.5 kN
Answer
F = 129.5 kN
19.Pipe friction & head loss
Answer: hf = 4.896 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Mean velocity
A = π·0.3²/4 = 0.07069 m²
V = Q/A = 0.12/0.07069 = 1.698 m/s
Velocity head
V²/(2g) = 1.698²/(2·9.81) = 0.1469 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.025·(400/0.3)·1.698²/(2·9.81) = 4.896 m
Answer
hf = 4.896 m
20.Pipe friction & head loss
Answer: Δz = 3.344 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.08/0.04909 = 1.63 m/s
V²/(2g) = 0.1354 m
Loss coefficients
f·L/D = 0.022·200/0.25 = 17.6
ΣK = 0.5 + 2·0.3 + 5 + 1.0 = 7.1
Total head loss
hf = 17.6·0.1354 = 2.383 m
hm = 7.1·0.1354 = 0.9612 m
Δz = hf + hm = 3.344 m
Answer
Δz = 3.344 m
21.Open-channel flow (Manning)
Answer: Q = 32.68 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (1.5 + 1.5·2.4)·2.4 = 12.24 m²
P = b + 2y·√(1 + z²) = 1.5 + 2·2.4·√(1 + 1.5²) = 10.15 m
R = A/P = 1.206 m
Velocity
V = (1/0.012)·1.2062/3·0.00081/2 = 2.67 m/s
Flow rate
Q = A·V = 12.24·2.67 = 32.68 m³/s
Answer
Q = 32.68 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.004481 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Hydraulic radius
R = D/4 = 0.45/4 = 0.1125 m
Solve Manning for S
S = (n·V/R2/3)² = (0.013·1.2/0.233)² = 0.004481
Answer
S = 0.004481
That is a fall of 4.481 m per kilometre.
23.Pumps & pump power
Answer: η = 82.61 %
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.04·12 = 4.709 kW
Efficiency
η = Ph/Pshaft = 4.709/5.7 = 82.61%
Answer
η = 82.61%
24.Pumps & pump power
Answer: H = 9.099 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are open and practically at rest, so pressure and velocity terms drop out.
H = Δz + hL = 6 + 3.099 = 9.099 m
Answer
H = 9.099 m
25.Time value of money
Answer: PV = 23828 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Annuity factor
(1 − (1 + i)−n)/i = (1 − 0.444)/0.07 = 7.943
Present value
PV = 3 000·7.943 = €23 828.06
Answer
PV = €23 828.06
26.Time value of money
Answer: A = 973.4 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Monthly rate and number of payments
i = 0.048/12 = 0.004
N = 12·20 = 240
Payment
The present value of N equal payments A is A·(1 − (1 + i)⁻ᴺ)/i. Set it equal to the loan and solve for A.
(1 + i)−N = 0.3836
A = 150 000·0.004/(1 − 0.3836) = €973.44
Answer
A = €973.44
27.NPV & IRR
Answer: DPB = 4.751 years
Payback period: the time until the cumulative cash flows repay the initial investment. Cash is assumed to come in evenly during each year, so the last part is a fraction of a year. The simple payback ignores the time value of money; the discounted payback period uses the discounted cash flows instead.
Discounted and cumulative cash flows
year 1: 11 500/1.12 = 10 267.86 → Σ = 10 267.86
year 2: 11 000/1.254 = 8 769.13 → Σ = 19 036.99
year 3: 10 500/1.405 = 7 473.69 → Σ = 26 510.68
year 4: 11 500/1.574 = 7 308.46 → Σ = 33 819.14
year 5: 14 500/1.762 = 8 227.69 → Σ = 42 046.83
Fraction of the last year
DPB = 4 + 6 180.86/8 227.69 = 4.751
Answer
DPB = 4.751 years
The discounted payback is always longer than the simple payback (3.609 years).
28.NPV & IRR
Answer: NPV = −27968 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
NPV is negative, so the project earns less than the required return.
29.Normal distribution
Answer: z = −1.83
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left of z
Φ(z) = 1 − 0.9664 = 0.0336
Read the z-table backwards
Find 0.0336 inside the table and read off z.
z = −1.83
Answer
z = −1.83
30.Normal distribution
Answer: x = 87.4 points
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.