FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 30 kNP2​ = 20 kNABRA​RB​ = ?2 m3 m1 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.

L = 6 mP1 = 30 kN at 2 mP2 = 20 kN at 5 m
RB = kN
2.Beam support reactionsHard
P = 65 kNADCMA​ = ?4 m3 m3 m

A compound beam is fixed to the wall at A, has an internal hinge at C (4 m from A) and rests on a roller at D (10 m from A). It carries a point load P at 7 m from A. Find the magnitude of the reaction moment MA at the wall.

AC = 4 mAD = 10 mP = 65 kN at 7 m
MA = kN·m
3.Truss: method of jointsMedium
ABBCACACB55 kN6 m5 m3 m

Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.

span = 6 mheight = 3 mB is 5 m from Avertical load = 55 kN
FAC = kN
4.Truss: method of jointsHard
ABCDEFGH40 kN40 kN40 kN25 kN35 kN40 kN4 × 4 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 40 kN ↓C: 40 kN ↓F: 40 kN ↓F: 25 kN →G: 35 kN ↓H: 40 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
5.Shear force & bending momentMedium
M0​ = 55 kN·mAB7 m3 m

The simply supported beam carries a clockwise couple M0 = 55 kN·m at x = 7 m from A, and no other load. Find the bending moment Mx just to the left of the couple. Use sagging moments positive and upward shear on the left face positive.

L = 10 mM0 = 55 kN·m clockwise, at 7 m
Mx = kN·m
6.Shear force & bending momentHard
w = 2 kN/mP = 55 kNAB2.5 m1.5 m

The simply supported beam carries a uniformly distributed load w over its whole span and a point load P. Find the maximum bending moment Mmax in the beam.

L = 4 mP = 55 kN at 2.5 mw = 2 kN/m from 0 to 4 m
Mmax = kN·m
7.Beam deflectionMedium
w = 20 kN/mδL = 2.5 m

A cantilever carries a uniformly distributed load w over its whole length. Find the deflection δ at the free end.

w = 20 kN/mL = 2.5 mE = 200 GPa (steel)I = 12 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
w = 15 kN/mAB6 m

A propped cantilever is fixed at A and simply supported (propped) at B. It carries a uniformly distributed load w over its whole length. EI is constant. Find the size of the bending moment MA at the fixed end.

L = 6 mw = 15 kN/m
MA = kN·m
9.Column bucklingMedium
PL = 6 m20 × 80 mmcross-section

A column of length L made of steel is pinned at both ends. Using Euler’s formula, find its critical buckling load Pcr.

L = 6 mE = 200 GPa (steel)b × h = 20 × 80 mm
Pcr = kN
10.Column bucklingHard
P = 115 kNL = 3 md = ?cross-section

A solid round column of length L made of steel is pinned at both ends. It must carry 115 kN with a factor of safety of 2 against buckling. Find the smallest diameter d.

P = 115 kNn = 2L = 3 mE = 200 GPa (steel)
d = mm
11.Centroid & second moment of areaMedium
1602012014xdimensions in mm

Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.

bf = 160 mmtf = 20 mmtw = 14 mmhw = 120 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
300201608xM = 40 kN·mdimensions in mm

The T-section is used as a beam with the flange on top and carries a sagging bending moment of 40 kN·m. Find the size of the bending stress σtop at the top edge.

bf = 300 mmtf = 20 mmtw = 8 mmhw = 160 mmM = 40 kN·m
σtop = MPa
13.Effective stress in soilMedium
sandγd​ = 16.5 kN/m³γsat​ = 20 kN/m³12 mwater tableXz = 2 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 2 mzw = 1 mγw = 9.81 kN/m³sand: γd = 16.5 kN/m³sand: γsat = 20 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 15.5 kN/m³γsat​ = 18.5 kN/m³6 mclayγsat​ = 18.5 kN/m³8 mwater tableXz = 10 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 10 mzw = 1 mγw = 9.81 kN/m³sand: γd = 15.5 kN/m³sand: γsat = 18.5 kN/m³clay: γsat = 18.5 kN/m³
σ′ = kPa
15.Consolidation settlementMedium
Δσ = 105 kPasandclayCc​ = 0.3, Cr​ = 0.02e0​ = 0.85σ′0​ = 85 kPaσ′p​ = 195 kPa4 mwater table

A 4 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.02 and e₀ = 0.85. At its mid-depth the effective vertical stress is 85 kPa and the preconsolidation pressure is 195 kPa. A new building adds 105 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 4 mCc = 0.3Cr = 0.02e0 = 0.85σ′0 = 85 kPaσ′p = 195 kPaΔσ = 105 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 9 mcv​ = 2 m²/year9 msandwater table

A clay layer 9 m thick has a coefficient of consolidation cv = 2 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 70% average consolidation the time factor is Tv = 0.403. How many years t does the layer take to reach 70% consolidation?

H = 9 mcv = 2 m²/yearU = 70%Tv = 0.403double drainage
t = years
17.Hydrostatic forceMedium
gated = 1.5 mH = 1 m

A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1.5 mH = 1 mb = 3 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 2 mH = 1 m

A vertical rectangular gate 1 m wide sits in the wall of a tank of glycerin, with its top edge 2 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 2 mH = 1 mb = 1 mρ = 1260 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
V = 2.3 m/sD = 300 mmL = 100 mf = 0.03

Water (ρ = 1000 kg/m³) flows at 2.3 m/s through a horizontal pipe, 100 m long, with an inside diameter of 300 mm. Use the Darcy friction factor f = 0.03 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 2.3 m/sL = 100 mD = 300 mmf = 0.03ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 0.2Δz = ?L = 100 m, D = 200 mm, f = 0.0152× bend (K = 0.3)

Two open reservoirs are joined by a pipe 100 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.015. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 0.2) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 80 L/s?

Q = 80 L/sL = 100 mD = 200 mmf = 0.015Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 0.2Kexit = 1.0
Δz = m
21.Open-channel flow (Manning)Medium
b = 5 my = 1.5 m3 : 1n = 0.015, S = 0.001

A trapezoidal brickwork channel has a bottom width of 5 m and side slopes of 3:1 (horizontal:vertical). Water flows uniformly 1.5 m deep. Manning n = 0.015 and the bed slope is S = 0.001. Find the flow rate Q in m³/s.

b = 5 my = 1.5 mz = 3n = 0.015S = 0.001
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 2 my = 2.2 m2 : 1n = 0.022, Q = 45 m³/s

A trapezoidal clean earth channel with a bottom width of 2 m and side slopes of 2:1 (horizontal:vertical) must carry 45 m³/s in uniform flow at a depth of 2.2 m. Manning n = 0.022. Find the required bed slope S (in m/m).

Q = 45 m³/sb = 2 my = 2.2 mz = 2n = 0.022
S = m/m
23.Pumps & pump powerMedium
PQ = 30 L/sH = 38 m

A pump with an efficiency of 70% delivers 30 L/s of water (ρ = 1000 kg/m³) against a head of 38 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.

Q = 30 L/sH = 38 mη = 70%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
PQ = 60 L/sΔz = 7 mL = 500 m, D = 200 mm, f = 0.015, ΣK = 5

A pump moves 60 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 7 m higher. The pipe is 500 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.015; the minor-loss coefficients add up to ΣK = 5 (entrance and exit included). Use g = 9.81 m/s². The pump efficiency is 80%. Find the shaft power Pshaft in kW.

Q = 60 L/sΔz = 7 mL = 500 mD = 200 mmf = 0.015ΣK = 5η = 80%
Pshaft = kW
25.Time value of moneyMedium
years0123…9PV = ?€6 000+4%+4%…r = 10%

A property is expected to earn net rent of €6 000 next year. The rent is expected to grow by 4% per year forever. The required return is 10% per year. Find the value PV of the property today.

C1 = €6 000g = 4%r = 10%
PV = €
26.Time value of moneyHard
years0123…27€3 000€3 000€3 000FV = ?

You deposit €3 000 at the start of every year for 27 years, the first deposit today. The account pays 4% per year. How much is in the account at the end of year 27? Find FV.

A = €3 000i = 4%n = 27
FV = €
27.NPV & IRRMedium
years012345−20 0005 5008 0008 5005 0009 000

A project costs €20 000 today and returns €5 500, €8 000, €8 500, €5 000, €9 000 at the end of years 1 to 5. The cost of capital is 8%. Assume cash flows arrive evenly through each year. Find the discounted payback period DPB in years.

r = 8%CF0 = −20 000CF1 = 5 500CF2 = 8 000CF3 = 8 500CF4 = 5 000CF5 = 9 000
DPB = years
28.NPV & IRRHard
years0123−50 00029 00022 00036 000

A project costs €50 000 and returns €29 000, €22 000, €36 000 at the end of years 1 to 3. Find its internal rate of return IRR in percent.

CF0 = −50 000CF1 = 29 000CF2 = 22 000CF3 = 36 000
IRR = %
29.Normal distributionMedium
−3−2−10123zshaded area between −z and z = 0.5527

Drag z so that the shaded area between −z and z under the standard normal curve is 0.5527. Find z to two decimals.

A = 0.5527
z =
30.Normal distributionHard
μ = 65x = ?20%

The exam scores are normally distributed with mean 65 points and standard deviation 10 points. Find the value x below which 20% of them lie (the 20th percentile).

μ = 65σ = 10P = 20%
x = points

3Solutions

1.Beam support reactions

Answer: RB = 26.67 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

P1​ = 30 kNP2​ = 20 kNABRA​RB​2 m3 m1 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·6 = 30·2 + 20·5
RB = 160/6 = 26.67 kN
ΣFy = 0: RA = 50 − 26.67 = 23.33 kN

Answer

RB = 26.67 kN
2.Beam support reactions

Answer: MA = 130 kN·m

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation. An internal hinge cannot carry a bending moment, which gives one extra equation: the moment about the hinge of the forces on either side is zero.

Part CD

The hinge has no moment, so moments about C on CD alone must balance.

ΣMC = 0: RD·6 = 65·3
RD = 32.5 kN
VC = 65 − 32.5 = 32.5 kN

Part AC

The hinge force VC acts downward on AC (equal and opposite to its action on CD).

RA = 32.5 = 32.5 kN
MA = 32.5·4 = 130 kN·m

Answer

MA = 130 kN·m
3.Truss: method of joints

Answer: FAC = 15.28 kN

Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.

ABBCACACB55 kNAy​Cy​

Support reactions

Equilibrium of the whole truss. Moments about A, counter-clockwise positive.

ΣMA = 0: Cy·6 = 55·5 → Cy = 45.83 kN
ΣFy = 0: Ay = 55 − 45.83 = 9.167 kN

Joint C

The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.

sin γ = 3/3.162 = 0.9487, cos γ = 1/3.162 = 0.3162
ΣFy = 0: Cy + FBC·sin γ = 0 → FBC = −45.83/0.9487 = −48.31 kN
ΣFx = 0: −FAC − FBC·cos γ = 0 → FAC = −(−48.31)·0.3162 = 15.28 kN

Answer

FAC = 15.28 kN (tension)
4.Truss: method of joints

Answer: member DH

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint D

CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.

ΣF⊥ = 0 → FDH = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 126.3 kN (T), BC: 126.3 kN (T), CD: 93.75 kN (T), DE: 93.75 kN (T), FG: 147.5 kN (C), GH: 147.5 kN (C), AF: 143.2 kN (C), HE: 132.6 kN (C), BF: 40 kN (T), CG: 35 kN (C), DH: 0, FC: 30.05 kN (T), HC: 76.01 kN (T)

Answer

Zero-force member: DH
5.Shear force & bending moment

Answer: Mx = −38.5 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. An applied couple makes the bending moment diagram jump by the size of the couple.

Support reactions

Moments about A, counter-clockwise positive: RB·L − M0 = 0. Vertical balance: RA + RB = 0.

RB = M0/L = 55/10 = 5.5 kN (upward)
RA = −RB = −5.5 kN (downward)

Cut just left of the couple

The left part contains only RA.

Mx = RA·a = −5.5·7 = −38.5 kN·m

Answer

Mx = −38.5 kN·m
6.Shear force & bending moment

Answer: Mmax = 55.31 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 2·4 = 8 kN, acting at x̄ = 2 m
ΣMA = 0: RB·4 = 55·2.5 + 2·4·2
RB = 153.5/4 = 38.38 kN
ΣFy = 0: RA = 63 − 38.38 = 24.63 kN

Where is V = 0?

V(2.5⁻) = RA − w·2.5 = 19.63 kN
V(2.5⁺) = 19.63 − 55 = −35.38 kN
The shear changes sign at the load, so the maximum is under the load.

Maximum moment

Mmax = RA·2.5 − w·2.5²/2 = 24.63·2.5 − 2·2.5²/2 = 55.31 kN·m

Answer

Mmax = 55.31 kN·m

It occurs at x = 2.5 m from A.

7.Beam deflection

Answer: δ = 40.69 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 20 N/mm, L = 2500 mm
EI = 2.4 × 10¹² N·mm²

Deflection

δ = wL⁴/(8EI) = 20·2500⁴/(8·2.4 × 10¹²) = 40.69 mm

Answer

δ = 40.69 mm
8.Beam deflection

Answer: MA = 67.5 kN·m

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).

Remove the prop

Without the prop the beam is a cantilever. Its free end would deflect under the load.

δload = wL⁴/(8EI)

Compatibility at the prop

The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.

RB·L³/(3EI) = wL⁴/(8EI) → RB = 3wL/8 = 3·15·6/8 = 33.75 kN

Moment at the fixed end

Moments about A of the loads and the prop force.

MA = wL²/2 − RB·L = 270 − 202.5 = 67.5 kN·m

Answer

MA = 67.5 kN·m
9.Column buckling

Answer: Pcr = 2.924 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A rectangle buckles about its weak axis, using the smaller dimension cubed.

Imin = h·b³/12 = 80·20³/12 = 53333 mm⁴

Effective length

KL = 1·6000 = 6000 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·53333/6000² = 2924 N = 2.924 kN

Answer

Pcr = 2.924 kN
10.Column buckling

Answer: d = 67.99 mm

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Required critical load

Pcr = n·P = 2·115000 = 230000 N
KL = 1·3000 = 3000 mm

Solve for the diameter

d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·230000·3000²/(π³·200000))^(1/4) = 67.99 mm

Answer

d = 67.99 mm

Check: the slenderness KL/r is 176.5, so the column is slender and Euler applies.

11.Centroid & second moment of area

Answer: Ix = 7.521 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 160·20 = 3200 mm², yf = 120 + 20/2 = 130 mm
web: Aw = 14·120 = 1680 mm², yw = 120/2 = 60 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (3200·130 + 1680·60)/4880 = 105.9 mm

Parallel-axis theorem

flange: 160·20³/12 + 3200·(130 − 105.9)² = 1.965 × 10⁶ mm⁴
web: 14·120³/12 + 1680·(60 − 105.9)² = 5.556 × 10⁶ mm⁴
Ix = 1.965 × 10⁶ + 5.556 × 10⁶ = 7.521 × 10⁶ mm⁴ = 7.521 × 10⁶ mm⁴

Answer

Ix = 7.521 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: σtop = 90.01 MPa

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 300·20 = 6000 mm², yf = 160 + 20/2 = 170 mm
web: Aw = 8·160 = 1280 mm², yw = 160/2 = 80 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (6000·170 + 1280·80)/7280 = 154.2 mm

Parallel-axis theorem

flange: 300·20³/12 + 6000·(170 − 154.2)² = 1.702 × 10⁶ mm⁴
web: 8·160³/12 + 1280·(80 − 154.2)² = 9.773 × 10⁶ mm⁴
Ix = 1.702 × 10⁶ + 9.773 × 10⁶ = 1.148 × 10⁷ mm⁴

Bending stress

The top edge is h − ȳ from the axis.

y = 180 − 154.2 = 25.82 mm
σ = M·y/I = 4 × 10⁷·25.82/1.148 × 10⁷ = 90.01 MPa

Answer

σtop = 90.01 MPa
13.Effective stress in soil

Answer: σ′ = 26.69 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 16.5·1 + 20·1 = 36.5 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·1 = 9.81 kPa

Effective stress

σ′ = σ − u = 36.5 − 9.81 = 26.69 kPa

Answer

σ′ = 26.69 kPa
14.Effective stress in soil

Answer: σ′ = 93.71 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·1 + γsat,sand·5 + γsat,clay·4
σ = 15.5·1 + 18.5·5 + 18.5·4 = 182 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·9 = 88.29 kPa

Effective stress

σ′ = σ − u = 182 − 88.29 = 93.71 kPa

Answer

σ′ = 93.71 kPa
15.Consolidation settlement

Answer: S = 15.11 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 85 + 105 = 190 kPa ≤ 195 kPa

Settlement

The clay stays on its recompression line.

S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.02·4/(1 + 0.85)·log₁₀(190/85) = 15.11 mm

Answer

S = 15.11 mm
16.Consolidation settlement

Answer: t = 4.08 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H/2 = 9/2 = 4.5 m

Time

t = Tv·Hdr²/cv = 0.403·4.5²/2 = 4.08 years

Answer

t = 4.08 years
17.Hydrostatic force

Answer: F = 58.86 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1.5 + 1/2 = 2 m
A = H·b = 1·3 = 3 m²
gated = 1.5 mH = 1 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2·3 = 58.86 kN

Answer

F = 58.86 kN
18.Hydrostatic force

Answer: ycp = 2.533 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 2 + 1/2 = 2.5 m
A = H·b = 1·1 = 1 m²
gated = 2 mH = 1 mF

Resultant force

F = ρ·g·yc·A = 1260·9.81·2.5·1 = 30.9 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 1·1³/12 = 0.08333 m⁴
ycp = yc + Ic/(yc·A) = 2.5 + 0.08333/(2.5·1) = 2.533 m

Answer

ycp = 2.533 m
19.Pipe friction & head loss

Answer: Δp = 26.45 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.03·(100/0.3)·2.3²/(2·9.81) = 2.696 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·2.696 = 26450 Pa = 26.45 kPa

Answer

Δp = 26.45 kPa
20.Pipe friction & head loss

Answer: Δz = 3.239 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.08/0.03142 = 2.546 m/s
V²/(2g) = 0.3305 m

Loss coefficients

f·L/D = 0.015·100/0.2 = 7.5
ΣK = 0.5 + 2·0.3 + 0.2 + 1.0 = 2.3

Total head loss

hf = 7.5·0.3305 = 2.479 m
hm = 2.3·0.3305 = 0.7602 m
Δz = hf + hm = 3.239 m

Answer

Δz = 3.239 m
21.Open-channel flow (Manning)

Answer: Q = 29.71 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (5 + 3·1.5)·1.5 = 14.25 m²
P = b + 2y·√(1 + z²) = 5 + 2·1.5·√(1 + 3²) = 14.49 m
R = A/P = 0.9837 m

Velocity

V = (1/0.015)·0.98372/3·0.0011/2 = 2.085 m/s

Flow rate

Q = A·V = 14.25·2.085 = 29.71 m³/s

Answer

Q = 29.71 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.003923 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (2 + 2·2.2)·2.2 = 14.08 m²
P = b + 2y·√(1 + z²) = 2 + 2·2.2·√(1 + 2²) = 11.84 m
R = A/P = 1.189 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.022·45/(14.08·1.123) = 0.06264
S = 0.06264² = 0.003923

Answer

S = 0.003923

That is a fall of 3.923 m per kilometre.

23.Pumps & pump power

Answer: Pshaft = 15.98 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.03·38 = 11.18 kW

Shaft power

Pshaft = Ph/η = 11.18/0.7 = 15.98 kW

Answer

Pshaft = 15.98 kW
24.Pumps & pump power

Answer: Pshaft = 10.96 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.06/0.03142 = 1.91 m/s
V²/(2g) = 0.1859 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (37.5 + 5)·0.1859 = 7.901 m

Pump head

H = Δz + hL = 7 + 7.901 = 14.9 m

Shaft power

Pshaft = ρ·g·Q·H/η = 1000·9.81·0.06·14.9/0.8 = 10.96 kW

Answer

Pshaft = 10.96 kW
25.Time value of money

Answer: PV = 100000 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Growing perpetuity

PV = C1/(r − g) = 6 000/(0.1 − 0.04) = 6 000/0.06 = €100 000.00

Answer

PV = €100 000.00
26.Time value of money

Answer: FV = 146903 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Ordinary annuity factor

((1 + 0.04)27 − 1)/0.04 = 47.08

Annuity due

Each deposit is invested one year longer.

FV = 3 000·47.08·1.04 = €146 902.75

Answer

FV = €146 902.75
27.NPV & IRR

Answer: DPB = 3.354 years

Payback period: the time until the cumulative cash flows repay the initial investment. Cash is assumed to come in evenly during each year, so the last part is a fraction of a year. The simple payback ignores the time value of money; the discounted payback period uses the discounted cash flows instead.

Discounted and cumulative cash flows

year 1: 5 500/1.08 = 5 092.59 → Σ = 5 092.59
year 2: 8 000/1.166 = 6 858.71 → Σ = 11 951.30
year 3: 8 500/1.26 = 6 747.57 → Σ = 18 698.88
year 4: 5 000/1.36 = 3 675.15 → Σ = 22 374.03

Fraction of the last year

DPB = 3 + 1 301.12/3 675.15 = 3.354

Answer

DPB = 3.354 years

The discounted payback is always longer than the simple payback (2.765 years).

28.NPV & IRR

Answer: IRR = 32.35 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(30%) = 1 711.42
NPV(35%) = −1 815.27

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 30 + 5·1 711.42/(1 711.42 − (−1 815.27)) = 32.43%
exact: NPV(32.35%) = 0 → IRR = 32.35%

Answer

IRR = 32.35%
29.Normal distribution

Answer: z = 0.76

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left of z

Φ(z) = (1 + 0.5527)/2 = 0.7764

Read the z-table backwards

Find 0.7764 inside the table and read off z.

z = 0.76

Answer

z = 0.76
30.Normal distribution

Answer: x = 56.58 points

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z for the percentile

Φ(z) = 0.2 → z = −0.8416

Back to x

x = 65 + −0.8416·10 = 56.58 points

Answer

x = 56.58 points

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.