1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 50 kNP2​ = 45 kNABRA​RB​ = ?1 m2 m1 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.

L = 4 mP1 = 50 kN at 1 mP2 = 45 kN at 3 m
RB = kN
2.Beam support reactionsHard
w = 12 kN/mP = 15 kNABRA​ = ?RB​3 m3 m3 m1 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.

L = 10 mP = 15 kN at 3 mw = 12 kN/m from 6 to 9 m
RA = kN
3.Truss: method of jointsMedium
ABCDEFGH35 kN10 kN40 kN4 × 3 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 35 kN ↓F: 10 kN ↓G: 40 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
4.Truss: method of jointsHard
ABCDEFGH40 kN35 kN40 kN30 kN4 × 3 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 40 kN ↓D: 35 kN ↓F: 40 kN ↓H: 30 kN ←
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
5.Shear force & bending momentMedium
P1​ = 30 kNP2​ = 45 kNABC3.5 m2.5 m1.5 m

The beam rests on a pin at A and a roller at B and overhangs B by 1.5 m to the free end C. It carries a point load P1 between the supports and a point load P2 at C. Find the bending moment Mx under the load P1. Use sagging moments positive and upward shear on the left face positive.

L = 7.5 mP1 = 30 kN at 3.5 mP2 = 45 kN at 7.5 msupports at x = 0 and x = 6 m
Mx = kN·m
6.Shear force & bending momentHard
w = 4 kN/mP = 60 kNAB3 m3 m

The simply supported beam carries a uniformly distributed load w over its whole span and a point load P. Find the maximum bending moment Mmax in the beam.

L = 6 mP = 60 kN at 3 mw = 4 kN/m from 0 to 6 m
Mmax = kN·m
7.Beam deflectionMedium
w = 8 kN/mδL = 5 m

A simply supported beam carries a uniformly distributed load w over its whole span. Find the maximum deflection δmax, at midspan.

w = 8 kN/mL = 5 mE = 70 GPa (aluminium)I = 12 × 10⁶ mm⁴
δmax = mm
8.Beam deflectionHard
P = 40 kNAB1.5 m1.5 m

A propped cantilever is fixed at A and simply supported (propped) at B. It carries a point load P at midspan. EI is constant. Find the reaction RB at the prop.

L = 3 mP = 40 kN at 1.5 m
RB = kN
9.Column bucklingMedium
PL = 1.5 m40 × 80 mmcross-section

A column of length L made of steel is fixed at the base and free at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 1.5 mE = 200 GPa (steel)b × h = 40 × 80 mm
Pcr = kN
10.Column bucklingHard
PL = 6 md = 25 mmcross-section

A column of length L made of steel is fixed at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 6 mE = 200 GPa (steel)d = 25 mm
σcr = MPa
11.Centroid & second moment of areaMedium
2202020014xdimensions in mm

Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.

bf = 220 mmtf = 20 mmtw = 14 mmhw = 200 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
190340106xM = 50 kN·mdimensions in mm

A symmetric I-section has flanges 190 mm wide and 10 mm thick, an overall depth of 340 mm and a web 6 mm thick. It carries a bending moment of 50 kN·m about the axis x. Find the size of the bending stress σj at the junction of the web and the top flange.

B = 190 mmH = 340 mmtf = 10 mmtw = 6 mmM = 50 kN·m
σj = MPa
13.Effective stress in soilMedium
sandγd​ = 17 kN/m³γsat​ = 20 kN/m³12 mwater tableXz = 10 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 10 mzw = 3 mγw = 9.81 kN/m³sand: γd = 17 kN/m³sand: γsat = 20 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 15 kN/m³γsat​ = 19.5 kN/m³4 mclayγsat​ = 19 kN/m³4 mwater tableXz = 6 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 6 mzw = 1 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 19.5 kN/m³clay: γsat = 19 kN/m³
σ′ = kPa
15.Consolidation settlementMedium
Δσ = 170 kPasandclayCc​ = 0.2, Cr​ = 0.04e0​ = 0.8σ′0​ = 120 kPaσ′p​ = 200 kPa8 mwater table

An 8 m thick overconsolidated clay layer has Cc = 0.2, Cr = 0.04 and e₀ = 0.8. At its mid-depth the effective vertical stress is 120 kPa and the preconsolidation pressure is 200 kPa. A new building adds 170 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 8 mCc = 0.2Cr = 0.04e0 = 0.8σ′0 = 120 kPaσ′p = 200 kPaΔσ = 170 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 3.5 mcv​ = 5 m²/year3.5 mimpervious rockwater table

A clay layer 3.5 m thick has a coefficient of consolidation cv = 5 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 50% average consolidation the time factor is Tv = 0.197. How many years t does the layer take to reach 50% consolidation?

H = 3.5 mcv = 5 m²/yearU = 50%Tv = 0.197single drainage
t = years
17.Hydrostatic forceMedium
gated = 1 mH = 2 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 1 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1 mH = 2 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 0.5 mH = 2 m

A vertical rectangular gate 1.5 m wide sits in the wall of a tank of glycerin, with its top edge 0.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 0.5 mH = 2 mb = 1.5 mρ = 1260 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
V = 1.7 m/sD = 200 mmL = 400 mf = 0.02

Water (ρ = 1000 kg/m³) flows at 1.7 m/s through a horizontal pipe, 400 m long, with an inside diameter of 200 mm. Use the Darcy friction factor f = 0.02 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 1.7 m/sL = 400 mD = 200 mmf = 0.02ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 10Δz = ?L = 100 m, D = 200 mm, f = 0.0182× bend (K = 0.3)

Two open reservoirs are joined by a pipe 100 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.018. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 10) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 80 L/s?

Q = 80 L/sL = 100 mD = 200 mmf = 0.018Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 10Kexit = 1.0
Δz = m
21.Open-channel flow (Manning)Medium
b = 3 my = 1.5 m1 : 1n = 0.012, S = 0.004

A trapezoidal finished concrete channel has a bottom width of 3 m and side slopes of 1:1 (horizontal:vertical). Water flows uniformly 1.5 m deep. Manning n = 0.012 and the bed slope is S = 0.004. Find the flow rate Q in m³/s.

b = 3 my = 1.5 mz = 1n = 0.012S = 0.004
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 5 my = 1.6 m1 : 1n = 0.025, Q = 10 m³/s

A trapezoidal gravel channel with a bottom width of 5 m and side slopes of 1:1 (horizontal:vertical) must carry 10 m³/s in uniform flow at a depth of 1.6 m. Manning n = 0.025. Find the required bed slope S (in m/m).

Q = 10 m³/sb = 5 my = 1.6 mz = 1n = 0.025
S = m/m
23.Pumps & pump powerMedium
PQ = 15 L/sH = 26 m

A pump with an efficiency of 72% delivers 15 L/s of water (ρ = 1000 kg/m³) against a head of 26 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.

Q = 15 L/sH = 26 mη = 72%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
PQ = 75 L/sΔz = 17 mL = 500 m, D = 200 mm, f = 0.02, ΣK = 8

A pump moves 75 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 17 m higher. The pipe is 500 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.02; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.

Q = 75 L/sΔz = 17 mL = 500 mD = 200 mmf = 0.02ΣK = 8
H = m
25.Time value of moneyMedium
years0123…16PV = ?€8 000€8 000€8 000€8 000

An annuity pays €8 000 at the end of each year for 16 years. The interest rate is 6% per year. Find the present value PV of the annuity.

A = €8 000i = 6%n = 16
PV = €
26.Time value of moneyHard
months0123…96€50€50€50FV = ?

You save €50 at the end of every month for 8 years. The account pays 4.2% per year, compounded monthly. How much have you saved at the end? Find FV.

A = €504.2% / 12N = 96
FV = €
27.NPV & IRRMedium
years012345−100 00026 00026 00026 00026 00046 000

A machine costs €100 000 today. It generates €26 000 at the end of each year for 5 years and can then be sold for €20 000. The cost of capital is 10%. Find the net present value NPV.

C0 = €100 000CF = €26 000S = €20 000n = 5r = 10%
NPV = €
28.NPV & IRRHard
years01234−10 0005 0004 5005 0005 000

A project costs €10 000 and returns €5 000, €4 500, €5 000, €5 000 at the end of years 1 to 4. Cash flows can be reinvested at the cost of capital of 12%. Find the modified internal rate of return MIRR in percent.

r = 12%CF0 = −10 000CF1 = 5 000CF2 = 4 500CF3 = 5 000CF4 = 5 000
MIRR = %
29.Normal distributionMedium
−3−2−10123zshaded area between −z and z = 0.9774

Drag z so that the shaded area between −z and z under the standard normal curve is 0.9774. Find z to two decimals.

A = 0.9774
z =
30.Normal distributionHard
557085100115130145pointstop 15%

The IQ scores are normally distributed with mean 100 points and standard deviation 15 points. Drag the cut-off so the shaded top 15% is to the right of it. Find the cut-off x.

μ = 100 pointsσ = 15 points15%
x = points

3Solutions

1.Beam support reactions

Answer: RB = 46.25 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

P1​ = 50 kNP2​ = 45 kNABRA​RB​1 m2 m1 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·4 = 50·1 + 45·3
RB = 185/4 = 46.25 kN
ΣFy = 0: RA = 95 − 46.25 = 48.75 kN

Answer

RB = 46.25 kN
2.Beam support reactions

Answer: RA = 19.5 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

w = 12 kN/mP = 15 kNABRA​RB​3 m3 m3 m1 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

UDL resultant: W = w·ℓ = 12·3 = 36 kN, acting at x̄ = 7.5 m
ΣMA = 0: RB·10 = 15·3 + 12·3·7.5
RB = 315/10 = 31.5 kN
ΣFy = 0: RA = 51 − 31.5 = 19.5 kN

Answer

RA = 19.5 kN
3.Truss: method of joints

Answer: member DH

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint D

CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.

ΣF⊥ = 0 → FDH = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 40.31 kN (T), BC: 40.31 kN (T), CD: 23.44 kN (T), DE: 23.44 kN (T), FG: 46.88 kN (C), GH: 46.88 kN (C), AF: 67.19 kN (C), HE: 39.06 kN (C), BF: 35 kN (T), CG: 40 kN (C), DH: 0, FC: 10.94 kN (T), HC: 39.06 kN (T)

Answer

Zero-force member: DH
4.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint G

FG and GH lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 46.25 kN (T), BC: 46.25 kN (T), CD: 38.75 kN (T), DE: 38.75 kN (T), FG: 72.5 kN (C), GH: 72.5 kN (C), AF: 107.8 kN (C), HE: 54.8 kN (C), BF: 40 kN (T), CG: 0, DH: 35 kN (T), FC: 5.303 kN (C), HC: 5.303 kN (T)

Answer

Zero-force member: CG
5.Shear force & bending moment

Answer: Mx = 4.375 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam. The overhang load also acts about A.

ΣMA = 0: RB·6 = 30·3.5 + 45·7.5
RB = 442.5/6 = 73.75 kN
ΣFy = 0: RA = 75 − 73.75 = 1.25 kN

Cut under P1 and keep the left part

Mx = RA·3.5 = 1.25·3.5 = 4.375 kN·m

Answer

Mx = 4.375 kN·m
6.Shear force & bending moment

Answer: Mmax = 108 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 4·6 = 24 kN, acting at x̄ = 3 m
ΣMA = 0: RB·6 = 60·3 + 4·6·3
RB = 252/6 = 42 kN
ΣFy = 0: RA = 84 − 42 = 42 kN

Where is V = 0?

V(3⁻) = RA − w·3 = 30 kN
V(3⁺) = 30 − 60 = −30 kN
The shear changes sign at the load, so the maximum is under the load.

Maximum moment

Mmax = RA·3 − w·3²/2 = 42·3 − 4·3²/2 = 108 kN·m

Answer

Mmax = 108 kN·m

It occurs at x = 3 m from A.

7.Beam deflection

Answer: δmax = 77.5 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 8 N/mm, L = 5000 mm
EI = 8.4 × 10¹¹ N·mm²

Deflection

δmax = 5wL⁴/(384EI) = 5·8·5000⁴/(384·8.4 × 10¹¹) = 77.5 mm

Answer

δmax = 77.5 mm
8.Beam deflection

Answer: RB = 12.5 kN

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).

Remove the prop

Without the prop the beam is a cantilever. Its free end would deflect under the load.

δload = P(L/2)²(3L − L/2)/(6EI) = 5PL³/(48EI)

Compatibility at the prop

The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.

RB·L³/(3EI) = 5PL³/(48EI) → RB = 5P/16 = 5·40/16 = 12.5 kN

Answer

RB = 12.5 kN
9.Column buckling

Answer: Pcr = 93.58 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A rectangle buckles about its weak axis, using the smaller dimension cubed.

Imin = h·b³/12 = 80·40³/12 = 426667 mm⁴

Effective length

KL = 2·1500 = 3000 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·426667/3000² = 93578 N = 93.58 kN

Answer

Pcr = 93.58 kN
10.Column buckling

Answer: σcr = 8.567 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·25⁴/64 = 19175 mm⁴

Radius of gyration and slenderness

A = 490.9 mm²
r = √(I/A) = √(19175/490.9) = 6.25 mm
KL = 0.5·6000 = 3000 mm
KL/r = 3000/6.25 = 480

Critical stress

σcr = π²E/(KL/r)² = π²·200000/480² = 8.567 MPa

Answer

σcr = 8.567 MPa
11.Centroid & second moment of area

Answer: Ix = 30.18 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 220·20 = 4400 mm², yf = 200 + 20/2 = 210 mm
web: Aw = 14·200 = 2800 mm², yw = 200/2 = 100 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (4400·210 + 2800·100)/7200 = 167.2 mm

Parallel-axis theorem

flange: 220·20³/12 + 4400·(210 − 167.2)² = 8.198 × 10⁶ mm⁴
web: 14·200³/12 + 2800·(100 − 167.2)² = 2.199 × 10⁷ mm⁴
Ix = 8.198 × 10⁶ + 2.199 × 10⁷ = 3.018 × 10⁷ mm⁴ = 30.18 × 10⁶ mm⁴

Answer

Ix = 30.18 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: σj = 66.74 MPa

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Outer rectangle minus the two side cut-outs

Both cut-outs together are (B − tw) wide and hw = H − 2tf high, and share the axis x.

hw = 340 − 2·10 = 320 mm
Ix = (B·H³ − (B − tw)·hw³)/12 = (190·340³ − 184·320³)/12
Ix = 1.199 × 10⁸ mm⁴

Bending stress

y = 170 − 10 = 160 mm
σ = M·y/I = 5 × 10⁷·160/1.199 × 10⁸ = 66.74 MPa

Answer

σj = 66.74 MPa
13.Effective stress in soil

Answer: σ′ = 122.3 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 17·3 + 20·7 = 191 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·7 = 68.67 kPa

Effective stress

σ′ = σ − u = 191 − 68.67 = 122.3 kPa

Answer

σ′ = 122.3 kPa
14.Effective stress in soil

Answer: σ′ = 62.45 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·1 + γsat,sand·3 + γsat,clay·2
σ = 15·1 + 19.5·3 + 19·2 = 111.5 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·5 = 49.05 kPa

Effective stress

σ′ = σ − u = 111.5 − 49.05 = 62.45 kPa

Answer

σ′ = 62.45 kPa
15.Consolidation settlement

Answer: S = 182.9 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 120 + 170 = 290 kPa > 200 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.04·8/(1 + 0.8)·log₁₀(200/120) + 0.2·8/(1 + 0.8)·log₁₀(290/200)
S = 39.44 + 143.4 = 182.9 mm

Answer

S = 182.9 mm
16.Consolidation settlement

Answer: t = 0.4827 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H = 3.5 m

Time

t = Tv·Hdr²/cv = 0.197·3.5²/5 = 0.4827 years

Answer

t = 0.4827 years
17.Hydrostatic force

Answer: F = 78.48 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1 + 2/2 = 2 m
A = H·b = 2·2 = 4 m²
gated = 1 mH = 2 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2·4 = 78.48 kN

Answer

F = 78.48 kN
18.Hydrostatic force

Answer: F = 55.62 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 0.5 + 2/2 = 1.5 m
A = H·b = 2·1.5 = 3 m²
gated = 0.5 mH = 2 mF

Resultant force

F = ρ·g·yc·A = 1260·9.81·1.5·3 = 55.62 kN

Answer

F = 55.62 kN
19.Pipe friction & head loss

Answer: Δp = 57.8 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.02·(400/0.2)·1.7²/(2·9.81) = 5.892 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·5.892 = 57800 Pa = 57.8 kPa

Answer

Δp = 57.8 kPa
20.Pipe friction & head loss

Answer: Δz = 6.974 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.08/0.03142 = 2.546 m/s
V²/(2g) = 0.3305 m

Loss coefficients

f·L/D = 0.018·100/0.2 = 9
ΣK = 0.5 + 2·0.3 + 10 + 1.0 = 12.1

Total head loss

hf = 9·0.3305 = 2.975 m
hm = 12.1·0.3305 = 3.999 m
Δz = hf + hm = 6.974 m

Answer

Δz = 6.974 m
21.Open-channel flow (Manning)

Answer: Q = 33.94 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (3 + 1·1.5)·1.5 = 6.75 m²
P = b + 2y·√(1 + z²) = 3 + 2·1.5·√(1 + 1²) = 7.243 m
R = A/P = 0.932 m

Velocity

V = (1/0.012)·0.9322/3·0.0041/2 = 5.029 m/s

Flow rate

Q = A·V = 6.75·5.029 = 33.94 m³/s

Answer

Q = 33.94 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.0004885 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (5 + 1·1.6)·1.6 = 10.56 m²
P = b + 2y·√(1 + z²) = 5 + 2·1.6·√(1 + 1²) = 9.525 m
R = A/P = 1.109 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.025·10/(10.56·1.071) = 0.0221
S = 0.0221² = 0.0004885

Answer

S = 0.0004885

That is a fall of 0.4885 m per kilometre.

23.Pumps & pump power

Answer: Pshaft = 5.314 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.015·26 = 3.826 kW

Shaft power

Pshaft = Ph/η = 3.826/0.72 = 5.314 kW

Answer

Pshaft = 5.314 kW
24.Pumps & pump power

Answer: H = 33.85 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.075/0.03142 = 2.387 m/s
V²/(2g) = 0.2905 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (50 + 8)·0.2905 = 16.85 m

Pump head

Both surfaces are open and practically at rest, so pressure and velocity terms drop out.

H = Δz + hL = 17 + 16.85 = 33.85 m

Answer

H = 33.85 m
25.Time value of money

Answer: PV = 80847 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Annuity factor

(1 − (1 + i)−n)/i = (1 − 0.3936)/0.06 = 10.11

Present value

PV = 8 000·10.11 = €80 847.16

Answer

PV = €80 847.16
26.Time value of money

Answer: FV = 5693 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly rate and number of deposits

i = 0.042/12 = 0.0035
N = 12·8 = 96

Future value of the deposits

FV = A·((1 + i)N − 1)/i = 50·(1.399 − 1)/0.0035 = €5 693.12

Answer

FV = €5 693.12

You paid in €4 800 yourself; the rest is interest.

27.NPV & IRR

Answer: NPV = 10979 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of the yearly cash flows

26 000·3.791 = 98 560.46

Present value of the salvage value

20 000/1.611 = 12 418.43

NPV

NPV = −100 000 + 98 560.46 + 12 418.43 = €10 978.88

Answer

NPV = €10 978.88
28.NPV & IRR

Answer: MIRR = 23.51 %

Modified IRR: compound every inflow forward to the end of the project at the reinvestment rate (usually the cost of capital) to get the terminal value TV. MIRR is the rate that turns the initial investment into TV: MIRR = (TV/C₀)^(1/n) − 1.

Terminal value of the inflows

5 000·1.123 = 7 024.64
4 500·1.122 = 5 644.80
5 000·1.121 = 5 600.00
5 000·1.120 = 5 000.00
TV = 23 269.44

MIRR

MIRR = (23 269.44/10 000)1/4 − 1 = 23.51%

Answer

MIRR = 23.51%
29.Normal distribution

Answer: z = 2.28

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left of z

Φ(z) = (1 + 0.9774)/2 = 0.9887

Read the z-table backwards

Find 0.9887 inside the table and read off z.

z = 2.28

Answer

z = 2.28
30.Normal distribution

Answer: x = 115.6 points

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left

Φ(z) = 0.85

z from the table

z ≈ 1.04

Back to the original units

x = 100 + 1.04·15 = 115.6 points

Answer

x = 115.6 points