FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 35 kNP2​ = 35 kNABRA​ = ?RB​1 m2 m2 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.

L = 5 mP1 = 35 kN at 1 mP2 = 35 kN at 3 m
RA = kN
2.Beam support reactionsHard
w = 3 kN/mP = 10 kNABRA​RB​ = ?2 m2 m2 m2 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.

L = 8 mP = 10 kN at 6 mw = 3 kN/m from 2 to 4 m
RB = kN
3.Truss: method of jointsMedium
ABCDEFGH15 kN10 kN20 kN25 kN20 kN4 × 4 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 15 kN ↓D: 10 kN ↓F: 20 kN ↓G: 25 kN ↓H: 20 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
4.Truss: method of jointsHard
ABCDEFGH30 kN10 kN20 kN15 kN20 kN25 kN4 × 4 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 30 kN ↓D: 10 kN ↓F: 20 kN ↓F: 15 kN →G: 20 kN ↓H: 25 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
5.Shear force & bending momentMedium
M0​ = 10 kN·mAB2 m3 m

The simply supported beam carries a clockwise couple M0 = 10 kN·m at x = 2 m from A, and no other load. Find the bending moment Mx just to the right of the couple. Use sagging moments positive and upward shear on the left face positive.

L = 5 mM0 = 10 kN·m clockwise, at 2 m
Mx = kN·m
6.Shear force & bending momentHard
5 kN/m50 kN30 kNABCDEFG2 m2 m2 m2 m2 m2 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

50 kN @ 0 m30 kN @ 12 m5 kN/m, 2–8 m
  1. 1A (x = 0 m)
  2. 2B (x = 2 m)
  3. 3C (x = 4 m)
  4. 4D (x = 6 m)
  5. 5E (x = 8 m)
  6. 6F (x = 10 m)
  7. 7G (x = 12 m)
7.Beam deflectionMedium
w = 20 kN/mABθ8 m

A simply supported beam carries a uniformly distributed load w over its whole span. Find the slope θA of the beam at support A, in radians.

w = 20 kN/mL = 8 mE = 200 GPa (steel)I = 160 × 10⁶ mm⁴
θA = rad
8.Beam deflectionHard
P = 8 kNP = 8 kNABδ1.667 m1.666 m1.667 m

A simply supported beam carries two equal point loads P at its third points (L/3 from each support). Using superposition, find the midspan deflection δmax.

P = 8 kNL = 5 mE = 200 GPa (steel)I = 8.5 × 10⁶ mm⁴
δmax = mm
9.Column bucklingMedium
PL = 2 md = 20 mmcross-section

A column of length L made of steel is pinned at both ends. Using Euler’s formula, find its critical buckling load Pcr.

L = 2 mE = 200 GPa (steel)d = 20 mm
Pcr = kN
10.Column bucklingHard
P = 40 kNL = 5 md = ?cross-section

A solid round column of length L made of steel is fixed at the base and free at the top. It must carry 40 kN with a factor of safety of 2.5 against buckling. Find the smallest diameter d.

P = 40 kNn = 2.5L = 5 mE = 200 GPa (steel)
d = mm
11.Centroid & second moment of areaMedium
1003014010xdimensions in mm

Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.

bf = 100 mmtf = 30 mmtw = 10 mmhw = 140 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
260251808xhogging Mdimensions in mm

A cast-iron beam has the T-section shown, with the flange on top. The allowable stresses are 40 MPa in tension and 150 MPa in compression. Find the largest hogging bending moment Mallow the beam can carry (give its size).

bf = 260 mmtf = 25 mmtw = 8 mmhw = 180 mmσt,allow = 40 MPaσc,allow = 150 MPa
Mallow = kN·m
13.Effective stress in soilMedium
sandγd​ = 16.5 kN/m³γsat​ = 19 kN/m³6 mwater tableXz = 5 m

For the soil profile shown, find the pore water pressure u at point X.

z = 5 mzw = 1 mγw = 9.81 kN/m³sand: γd = 16.5 kN/m³sand: γsat = 19 kN/m³
u = kPa
14.Effective stress in soilHard
sandγd​ = 15 kN/m³γsat​ = 20.5 kN/m³4 mclayγsat​ = 19 kN/m³4 mwater tableXz = 6 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 6 mzw = 2 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 20.5 kN/m³clay: γsat = 19 kN/m³
σ = kPa
15.Consolidation settlementMedium
Δσ = 20 kPasandclayCc​ = 0.4, Cr​ = 0.05e0​ = 0.6σ′0​ = 90 kPaOCR = 28 mwater table

An 8 m thick overconsolidated clay layer has Cc = 0.4, Cr = 0.05 and e₀ = 0.6. At its mid-depth the effective vertical stress is 90 kPa and the overconsolidation ratio is OCR = 2. A new building adds 20 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 8 mCc = 0.4Cr = 0.05e0 = 0.6σ′0 = 90 kPaOCR = 2Δσ = 20 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 2 mcv​ = 1 m²/year2 msandwater table

A clay layer 2 m thick has a coefficient of consolidation cv = 1 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?

H = 2 mcv = 1 m²/yearU = 60%Tv = 0.287double drainage
t = years
17.Hydrostatic forceMedium
gated = 0.5 mH = 1 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 0.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 0.5 mH = 1 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 1.5 mH = 2.5 m

A vertical rectangular gate 1 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1.5 mH = 2.5 mb = 1 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
V = 2.8 m/sD = 150 mmL = 800 mf = 0.015

Water (ρ = 1000 kg/m³) flows at 2.8 m/s through a horizontal pipe, 800 m long, with an inside diameter of 150 mm. Use the Darcy friction factor f = 0.015 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 2.8 m/sL = 800 mD = 150 mmf = 0.015ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 5Δz = 5 mL = 100 m, D = 300 mm, f = 0.0182× bend (K = 0.3)

Two open reservoirs are joined by a pipe 100 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.018. The water surface of the upper reservoir is 5 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.

Δz = 5 mL = 100 mD = 300 mmf = 0.018Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 5Kexit = 1.0
Q = L/s
21.Open-channel flow (Manning)Medium
b = 4 my = 1.2 mn = 0.015, S = 0.002

A rectangular brickwork channel is 4 m wide. Water flows uniformly 1.2 m deep. Manning n = 0.015 and the bed slope is S = 0.002. Find the flow rate Q in m³/s.

b = 4 my = 1.2 mn = 0.015S = 0.002
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 1 my = 2 mn = 0.025, Q = 0.97 m³/s

A rectangular gravel channel 1 m wide must carry 0.97 m³/s in uniform flow at a depth of 2 m. Manning n = 0.025. Find the required bed slope S (in m/m).

Q = 0.97 m³/sb = 1 my = 2 mn = 0.025
S = m/m
23.Pumps & pump powerMedium
PQ = 50 L/sH = 78 m

A pump delivers 50 L/s of water (ρ = 1000 kg/m³) against a head of 78 m. The pump efficiency is 60% and the electric motor driving it has an efficiency of 95%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.

Q = 50 L/sH = 78 mηpump = 60%ηmotor = 95%g = 9.81 m/s²
Pel = kW
24.Pumps & pump powerHard
PQ = 50 L/sΔz = 16 mL = 150 m, D = 150 mm, f = 0.018, ΣK = 4

A pump moves 50 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 16 m higher. The pipe is 150 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.018; the minor-loss coefficients add up to ΣK = 4 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.

Q = 50 L/sΔz = 16 mL = 150 mD = 150 mmf = 0.018ΣK = 4
H = m
25.Time value of moneyMedium
years0123€5 000FV = ?

You invest €5 000 at a nominal rate of 5% per year, compounded monthly. Find the value FV of the investment after 3 years.

PV = €5 0005% / 12n = 3
FV = €
26.Time value of moneyHard
months0123…312€500€500€500FV = ?

You save €500 at the end of every month for 26 years. The account pays 4.2% per year, compounded monthly. How much have you saved at the end? Find FV.

A = €5004.2% / 12N = 312
FV = €
27.NPV & IRRMedium
years0123…9−400 00031 000+2%+2%…r = 9%, NPV = ?

A project costs €400 000 today. It generates €31 000 at the end of the first year, and the cash flow then grows by 2% per year forever. The cost of capital is 9%. Find the net present value NPV.

C0 = €400 000CF1 = €31 000g = 2%r = 9%
NPV = €
28.NPV & IRRHard
years012−25 00017 00013 000

A project costs €25 000 and returns €17 000, €13 000 at the end of years 1 to 2. Find its internal rate of return IRR in percent.

CF0 = −25 000CF1 = 17 000CF2 = 13 000
IRR = %
29.Normal distributionMedium
72 kg70 kgT = X₁ + … + X₆?

The masses of boxes are independent and normal with mean 12 kg and standard deviation 0.8 kg. Find the probability P that the total mass of 6 of them exceeds 70 kg. Round z to two decimals.

μ = 12 kgσ = 0.8 kgn = 6> 70 kg
P =
30.Normal distributionHard
10 g0X − Y?

The mass X of a product from line 1 and Y from line 2 are independent and normal: X has mean 500 g and standard deviation 8 g, Y has mean 490 g and standard deviation 6 g. Find the probability P that X is greater than Y. Round z to two decimals.

μX = 500 g, σX = 8 gμY = 490 g, σY = 6 g
P =

3Solutions

1.Beam support reactions

Answer: RA = 42 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

P1​ = 35 kNP2​ = 35 kNABRA​RB​1 m2 m2 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·5 = 35·1 + 35·3
RB = 140/5 = 28 kN
ΣFy = 0: RA = 70 − 28 = 42 kN

Answer

RA = 42 kN
2.Beam support reactions

Answer: RB = 9.75 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

w = 3 kN/mP = 10 kNABRA​RB​2 m2 m2 m2 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

UDL resultant: W = w·ℓ = 3·2 = 6 kN, acting at x̄ = 3 m
ΣMA = 0: RB·8 = 10·6 + 3·2·3
RB = 78/8 = 9.75 kN
ΣFy = 0: RA = 16 − 9.75 = 6.25 kN

Answer

RB = 9.75 kN
3.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 61.67 kN (T), BC: 76.67 kN (T), CD: 76.67 kN (T), DE: 58.33 kN (T), FG: 61.67 kN (C), GH: 58.33 kN (C), AF: 77.08 kN (C), HE: 72.92 kN (C), BF: 26.25 kN (T), CG: 0, DH: 23.75 kN (T), BG: 18.75 kN (C), DG: 22.92 kN (C)

Answer

Zero-force member: CG
4.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 67.5 kN (T), BC: 70 kN (T), CD: 70 kN (T), DE: 52.5 kN (T), FG: 67.5 kN (C), GH: 52.5 kN (C), AF: 74.25 kN (C), HE: 74.25 kN (C), BF: 32.5 kN (T), CG: 0, DH: 27.5 kN (T), BG: 3.536 kN (C), DG: 24.75 kN (C)

Answer

Zero-force member: CG
5.Shear force & bending moment

Answer: Mx = 6 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. An applied couple makes the bending moment diagram jump by the size of the couple.

Support reactions

Moments about A, counter-clockwise positive: RB·L − M0 = 0. Vertical balance: RA + RB = 0.

RB = M0/L = 10/5 = 2 kN (upward)
RA = −RB = −2 kN (downward)

Cut just right of the couple

The left part now contains RA and the couple.

Mx = RA·a + M0 = −2·2 + 10 = 6 kN·m

Answer

Mx = 6 kN·m
6.Shear force & bending moment

Answer: E (x = 8 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 61.67 kN, R2 = 48.33 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = −100, MC = −86.67, MD = −93.33, ME = −120 kN·m, MF = −60, MG = 0

Answer

Mark E: ME = −120 kN·m
7.Beam deflection

Answer: θA = 0.01333 rad

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). The slope θ = dv/dx is the first integral of M/(EI); in consistent units it comes out in radians.

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 20 N/mm, L = 8000 mm
EI = 3.2 × 10¹³ N·mm²

End slope

θA = wL³/(24EI) = 20·8000³/(24·3.2 × 10¹³) = 0.01333 rad

Answer

θA = 0.01333 rad

That is 0.7639°.

8.Beam deflection

Answer: δmax = 20.88 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 8000 N, L = 5000 mm
EI = 1.7 × 10¹² N·mm²

One load at L/3

δ₁ = Pb(3L² − 4b²)/(48EI), b = L/3 = 1667 mm
δ₁ = 10.44 mm

Add both loads

δmax = 2·δ₁ = 23PL³/(648EI) = 20.88 mm

Answer

δmax = 20.88 mm
9.Column buckling

Answer: Pcr = 3.876 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·20⁴/64 = 7854 mm⁴

Effective length

KL = 1·2000 = 2000 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·7854/2000² = 3876 N = 3.876 kN

Answer

Pcr = 3.876 kN
10.Column buckling

Answer: d = 100.8 mm

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Required critical load

Pcr = n·P = 2.5·40000 = 100000 N
KL = 2·5000 = 10000 mm

Solve for the diameter

d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·100000·10000²/(π³·200000))^(1/4) = 100.8 mm

Answer

d = 100.8 mm

Check: the slenderness KL/r is 396.9, so the column is slender and Euler applies.

11.Centroid & second moment of area

Answer: Ix = 9.408 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 100·30 = 3000 mm², yf = 140 + 30/2 = 155 mm
web: Aw = 10·140 = 1400 mm², yw = 140/2 = 70 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (3000·155 + 1400·70)/4400 = 128 mm

Parallel-axis theorem

flange: 100·30³/12 + 3000·(155 − 128)² = 2.419 × 10⁶ mm⁴
web: 10·140³/12 + 1400·(70 − 128)² = 6.989 × 10⁶ mm⁴
Ix = 2.419 × 10⁶ + 6.989 × 10⁶ = 9.408 × 10⁶ mm⁴ = 9.408 × 10⁶ mm⁴

Answer

Ix = 9.408 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: Mallow = 14.33 kN·m

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Centroid

ȳ = (6500·192.5 + 1440·90)/7940 = 173.9 mm
top edge: c = 205 − 173.9 = 31.09 mm

Second moment of area

I = 260·25³/12 + 6500·18.59² + 8·180³/12 + 1440·83.91² = 1.661 × 10⁷ mm⁴

Moment allowed by each edge

Hogging: the top is in tension, the bottom in compression.

top edge: M = 40·1.661 × 10⁷/31.09 = 21.37 kN·m
bottom edge: M = 150·1.661 × 10⁷/173.9 = 14.33 kN·m

Governing value

Mallow = min = 14.33 kN·m (bottom edge)

Answer

Mallow = 14.33 kN·m
13.Effective stress in soil

Answer: u = 39.24 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·4 = 39.24 kPa

Answer

u = 39.24 kPa
14.Effective stress in soil

Answer: σ = 109 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·2 + γsat,sand·2 + γsat,clay·2
σ = 15·2 + 20.5·2 + 19·2 = 109 kPa

Answer

σ = 109 kPa
15.Consolidation settlement

Answer: S = 21.79 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Preconsolidation pressure

σ′p = OCR·σ′0 = 2·90 = 180 kPa

Compare with the preconsolidation pressure

σ′f = 90 + 20 = 110 kPa ≤ 180 kPa

Settlement

The clay stays on its recompression line.

S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.05·8/(1 + 0.6)·log₁₀(110/90) = 21.79 mm

Answer

S = 21.79 mm
16.Consolidation settlement

Answer: t = 0.287 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H/2 = 2/2 = 1 m

Time

t = Tv·Hdr²/cv = 0.287·1²/1 = 0.287 years

Answer

t = 0.287 years
17.Hydrostatic force

Answer: F = 19.62 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 0.5 + 1/2 = 1 m
A = H·b = 1·2 = 2 m²
gated = 0.5 mH = 1 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·1·2 = 19.62 kN

Answer

F = 19.62 kN
18.Hydrostatic force

Answer: F = 67.44 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1.5 + 2.5/2 = 2.75 m
A = H·b = 2.5·1 = 2.5 m²
gated = 1.5 mH = 2.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2.75·2.5 = 67.44 kN

Answer

F = 67.44 kN
19.Pipe friction & head loss

Answer: Δp = 313.6 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.015·(800/0.15)·2.8²/(2·9.81) = 31.97 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·31.97 = 313600 Pa = 313.6 kPa

Answer

Δp = 313.6 kPa
20.Pipe friction & head loss

Answer: Q = 193.4 L/s

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Loss coefficients

f·L/D = 0.018·100/0.3 = 6
ΣK = 0.5 + 2·0.3 + 5 + 1.0 = 7.1

Energy equation

Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.

5 = (6 + 7.1)·V²/(2·9.81)
V = √(2·9.81·5/13.1) = 2.737 m/s

Flow rate

Q = V·π·D²/4 = 2.737·0.07069 = 0.1934 m³/s = 193.4 L/s

Answer

Q = 193.4 L/s
21.Open-channel flow (Manning)

Answer: Q = 11.81 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 4·1.2 = 4.8 m²
P = b + 2y = 4 + 2·1.2 = 6.4 m
R = A/P = 0.75 m

Velocity

V = (1/0.015)·0.752/3·0.0021/2 = 2.461 m/s

Flow rate

Q = A·V = 4.8·2.461 = 11.81 m³/s

Answer

Q = 11.81 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.0004988 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 1·2 = 2 m²
P = b + 2y = 1 + 2·2 = 5 m
R = A/P = 0.4 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.025·0.97/(2·0.5429) = 0.02233
S = 0.02233² = 0.0004988

Answer

S = 0.0004988

That is a fall of 0.4988 m per kilometre.

23.Pumps & pump power

Answer: Pel = 67.12 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.05·78 = 38.26 kW

Shaft power

Pshaft = 38.26/0.6 = 63.77 kW

Electrical power

Pel = 63.77/0.95 = 67.12 kW

Answer

Pel = 67.12 kW
24.Pumps & pump power

Answer: H = 24.98 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.05/0.01767 = 2.829 m/s
V²/(2g) = 0.408 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (18 + 4)·0.408 = 8.977 m

Pump head

Both surfaces are open and practically at rest, so pressure and velocity terms drop out.

H = Δz + hL = 16 + 8.977 = 24.98 m

Answer

H = 24.98 m
25.Time value of money

Answer: FV = 5807 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate and number of periods

i = r/m = 0.05/12 = 0.004167
N = m·n = 12·3 = 36

Future value

FV = 5 000·(1 + 0.004167)36 = 5 000·1.161 = €5 807.36

Answer

FV = €5 807.36
26.Time value of money

Answer: FV = 282079 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly rate and number of deposits

i = 0.042/12 = 0.0035
N = 12·26 = 312

Future value of the deposits

FV = A·((1 + i)N − 1)/i = 500·(2.975 − 1)/0.0035 = €282 078.86

Answer

FV = €282 078.86

You paid in €156 000 yourself; the rest is interest.

27.NPV & IRR

Answer: NPV = 42857 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Value of the cash flows

PV = 31 000/(0.09 − 0.02) = 442 857.14

NPV

NPV = 442 857.14 − 400 000 = €42 857.14

Answer

NPV = €42 857.14

NPV is positive, so the project earns more than the required return.

28.NPV & IRR

Answer: IRR = 13.72 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(10%) = 1 198.35
NPV(15%) = −387.52

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 10 + 5·1 198.35/(1 198.35 − (−387.52)) = 13.78%
exact: NPV(13.72%) = 0 → IRR = 13.72%

Answer

IRR = 13.72%
29.Normal distribution

Answer: P = 0.8461

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the total

μT = 72 kg, σT = 0.8·√6 = 1.96 kg

Standardise

z = (70 − 72)/1.96 = −1.02

Probability

P = 1 − Φ(−1.02) = 0.8461

Answer

P = 0.8461
30.Normal distribution

Answer: P = 0.8413

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the difference

μ = 500 − 490 = 10 g, σ = 10 g

Standardise

z = (0 − 10)/10 = −1

Probability

P = 1 − Φ(−1) = 0.8413

Answer

P = 0.8413

ExamProblems · examproblems.com/courses/fe-exam-civil