FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
w = 2 kN/mP = 10 kNABMA​ = ?4 m

The cantilever beam is fixed to the wall at A. It carries a uniformly distributed load w along its whole length and a point load P at 4 m from the wall. Find the magnitude of the reaction moment MA at the wall.

L = 4 mP = 10 kN at 4 mw = 2 kN/m from 0 to 4 m
MA = kN·m
2.Beam support reactionsHard
w = 8 kN/mP = 50 kNABRA​RB​ = ?8 m2 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.

L = 10 mP = 50 kN at 8 mw = 8 kN/m from 8 to 10 m
RB = kN
3.Truss: method of jointsMedium
ABCDEFGH35 kN30 kN30 kN4 × 4 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

D: 35 kN ↓G: 30 kN ↓H: 30 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
4.Truss: method of jointsHard
ABCDEFGH40 kN35 kN10 kN4 × 3 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

F: 40 kN ↓G: 35 kN ↓H: 10 kN ←
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
5.Shear force & bending momentMedium
20 kN60 kNABCDEFG2 m2 m2 m2 m2 m2 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

20 kN @ 10 m60 kN @ 2 m
  1. 1A (x = 0 m)
  2. 2B (x = 2 m)
  3. 3C (x = 4 m)
  4. 4D (x = 6 m)
  5. 5E (x = 8 m)
  6. 6F (x = 10 m)
  7. 7G (x = 12 m)
6.Shear force & bending momentHard
w = 3 kN/mP = 60 kNAB7 m1 m

The simply supported beam carries a uniformly distributed load w over its whole span and a point load P. Find the maximum bending moment Mmax in the beam.

L = 8 mP = 60 kN at 7 mw = 3 kN/m from 0 to 8 m
Mmax = kN·m
7.Beam deflectionMedium
w = 5 kN/mδL = 3 m

A cantilever carries a uniformly distributed load w over its whole length. Find the deflection δ at the free end.

w = 5 kN/mL = 3 mE = 70 GPa (aluminium)I = 57 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
P = 60 kNAB2 m2 m

A propped cantilever is fixed at A and simply supported (propped) at B. It carries a point load P at midspan. EI is constant. Find the size of the bending moment MA at the fixed end.

L = 4 mP = 60 kN at 2 m
MA = kN·m
9.Column bucklingMedium
PL = 4 m40 × 100 mmcross-section

A column of length L made of aluminium is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 4 mE = 70 GPa (aluminium)b × h = 40 × 100 mm
Pcr = kN
10.Column bucklingHard
P = 145 kNL = 1.5 md = ?cross-section

A solid round column of length L made of steel is fixed at the base and free at the top. It must carry 145 kN with a factor of safety of 2.5 against buckling. Find the smallest diameter d.

P = 145 kNn = 2.5L = 1.5 mE = 200 GPa (steel)
d = mm
11.Centroid & second moment of areaMedium
xD = 180d = 160dimensions in mm

A circular tube has outside diameter D = 180 mm and inside diameter d = 160 mm. Find its radius of gyration r about the horizontal centroidal axis.

D = 180 mmd = 160 mm
r = mm
12.Centroid & second moment of areaHard
110200102401216xdimensions in mm

A welded I-section has a top flange 110 × 10 mm, a web 240 mm high and 16 mm thick, and a bottom flange 200 × 12 mm (width × thickness). Find its second moment of area Ix about the horizontal axis x through its centroid.

top flange: 110 × 10 mmweb: 16 × 240 mmbottom flange: 200 × 12 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
sandγd​ = 16.5 kN/m³γsat​ = 19.5 kN/m³6 mwater tableXz = 6 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 6 mzw = 2 mγw = 9.81 kN/m³sand: γd = 16.5 kN/m³sand: γsat = 19.5 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 16 kN/m³γsat​ = 20.5 kN/m³3 mclayγsat​ = 17.5 kN/m³8 mwater tableXz = 7 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 7 mzw = 2 mγw = 9.81 kN/m³sand: γd = 16 kN/m³sand: γsat = 20.5 kN/m³clay: γsat = 17.5 kN/m³
σ′ = kPa
15.Consolidation settlementMedium
Δσ = 110 kPasandclayCc​ = 0.25, Cr​ = 0.06e0​ = 0.65σ′0​ = 80 kPaOCR = 2.55.5 mwater table

A 5.5 m thick overconsolidated clay layer has Cc = 0.25, Cr = 0.06 and e₀ = 0.65. At its mid-depth the effective vertical stress is 80 kPa and the overconsolidation ratio is OCR = 2.5. A new building adds 110 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 5.5 mCc = 0.25Cr = 0.06e0 = 0.65σ′0 = 80 kPaOCR = 2.5Δσ = 110 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 8 mcv​ = 5 m²/year8 msandwater table

A clay layer 8 m thick has a coefficient of consolidation cv = 5 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 90% average consolidation the time factor is Tv = 0.848. How many years t does the layer take to reach 90% consolidation?

H = 8 mcv = 5 m²/yearU = 90%Tv = 0.848double drainage
t = years
17.Hydrostatic forceMedium
gated = 2.5 mH = 3 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 2.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 2.5 mH = 3 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 1 mH = 1 m

A vertical rectangular gate 1 m wide sits in the wall of a tank of oil, with its top edge 1 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1 mH = 1 mb = 1 mρ = 880 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
V = 1.1 m/sD = 100 mmL = 200 mf = 0.03

Water flows at a mean velocity of 1.1 m/s through a pipe 200 m long with an inside diameter of 100 mm. Use the Darcy friction factor f = 0.03 and g = 9.81 m/s². Find the friction head loss hf.

V = 1.1 m/sL = 200 mD = 100 mmf = 0.03g = 9.81 m/s²
hf = m
20.Pipe friction & head lossHard
K = 5Δz = 10 mL = 400 m, D = 300 mm, f = 0.0184× bend (K = 0.3)

Two open reservoirs are joined by a pipe 400 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.018. The water surface of the upper reservoir is 10 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.

Δz = 10 mL = 400 mD = 300 mmf = 0.018Kentrance = 0.5Kbend = 0.3 (×4)Kvalve = 5Kexit = 1.0
Q = L/s
21.Open-channel flow (Manning)Medium
b = 4.5 my = 1 m1.5 : 1n = 0.022, S = 0.0015

A trapezoidal clean earth channel has a bottom width of 4.5 m and side slopes of 1.5:1 (horizontal:vertical). Water flows uniformly 1 m deep. Manning n = 0.022 and the bed slope is S = 0.0015. Find the flow rate Q in m³/s.

b = 4.5 my = 1 mz = 1.5n = 0.022S = 0.0015
Q = m³/s
22.Open-channel flow (Manning)Hard
D = 600 mmn = 0.013, V = 1 m/s

A concrete sewer with an inside diameter of 600 mm (Manning n = 0.013) must reach a self-cleansing velocity of 1 m/s when flowing just full. Find the minimum slope S (in m/m).

D = 600 mmn = 0.013V = 1 m/s
S = m/m
23.Pumps & pump powerMedium
PQ = 80 L/sH = 64 m

A pump with an efficiency of 80% delivers 80 L/s of water (ρ = 1000 kg/m³) against a head of 64 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.

Q = 80 L/sH = 64 mη = 80%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
PQ = 50 L/sΔz = 22 mL = 200 m, D = 150 mm, f = 0.015, ΣK = 4

A pump moves 50 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 22 m higher. The pipe is 200 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.015; the minor-loss coefficients add up to ΣK = 4 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.

Q = 50 L/sΔz = 22 mL = 200 mD = 150 mmf = 0.015ΣK = 4
H = m
25.Time value of moneyMedium
years01234PV = ?€40 000

You need €40 000 in 4 years. An account pays 4.8% per year, compounded quarterly. How much must you deposit today? Find the present value PV.

FV = €40 0004.8% / 4n = 4
PV = €
26.Time value of moneyHard
months0123…N = ?€5 000€125€125€125€1257.2% / 12

You borrow €5 000 at 7.2% per year, compounded monthly, and repay €125 at the end of every month. How many months does it take until the loan is repaid (the last payment may be smaller)? Give the number of payments N.

P = €5 000A = €1257.2% / 12
N = payments
27.NPV & IRRMedium
years0123456€40 000€4 000€4 000€4 000€4 000€4 000€4 000r = 8%, EAC = ?

A machine costs €40 000 today, lasts 6 years and costs €4 000 per year to run (paid at the end of each year). The cost of capital is 8%. Find its equivalent annual cost EAC.

C0 = €40 000M = €4 000n = 6r = 8%
EAC = €
28.NPV & IRRHard
years0123…10−80 0009 500+5%+5%+5%r = 10%, NPV = ?

A project costs €80 000 today. Its cash flow is €9 500 at the end of year 1 and grows by 5% per year until the last cash flow at the end of year 10. The cost of capital is 10%. Find the net present value NPV.

C0 = €80 000CF1 = €9 500g = 5%n = 10r = 10%
NPV = €
29.Normal distributionMedium
32 min37 minX + Y?

X is normal with mean 12 min and standard deviation 1.5 min; Y is independent and normal with mean 20 min and standard deviation 2 min. Find the probability P that X + Y is more than 37 min. Round z to two decimals.

μX = 12, σX = 1.5μY = 20, σY = 2X + Y > 37 min
P =
30.Normal distributionHard
157164171178185192199cmbottom 85%

The heights of adult men are normally distributed with mean 178 cm and standard deviation 7 cm. Drag the cut-off so the shaded bottom 85% is to the left of it. Find the cut-off x.

μ = 178 cmσ = 7 cm85%
x = cm

3Solutions

1.Beam support reactions

Answer: MA = 56 kN·m

Cantilever equilibrium: a fixed support can push up and also resist rotation, so it gives a vertical reaction RA and a reaction moment MA. ΣFy = 0 gives RA, and moments about the wall give MA = Σ(load × distance from the wall). A distributed load acts as its resultant at the centroid of the load diagram.

Resultant of the distributed load

W = 2·4 = 8 kN, x̄ = 2 m

Moment about the wall

MA = P·a + W·x̄ = 10·4 + 8·2 = 56 kN·m

Answer

MA = 56 kN·m
2.Beam support reactions

Answer: RB = 54.4 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

w = 8 kN/mP = 50 kNABRA​RB​8 m2 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

UDL resultant: W = w·ℓ = 8·2 = 16 kN, acting at x̄ = 9 m
ΣMA = 0: RB·10 = 50·8 + 8·2·9
RB = 544/10 = 54.4 kN
ΣFy = 0: RA = 66 − 54.4 = 11.6 kN

Answer

RB = 54.4 kN
3.Truss: method of joints

Answer: member BF

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint B

AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.

ΣF⊥ = 0 → FBF = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 31.25 kN (T), BC: 31.25 kN (T), CD: 63.75 kN (T), DE: 63.75 kN (T), FG: 62.5 kN (C), GH: 62.5 kN (C), AF: 44.19 kN (C), HE: 90.16 kN (C), BF: 0, CG: 30 kN (C), DH: 35 kN (T), FC: 44.19 kN (T), HC: 1.768 kN (C)

Answer

Zero-force member: BF
4.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 40 kN (T), BC: 50 kN (T), CD: 50 kN (T), DE: 25 kN (T), FG: 50 kN (C), GH: 35 kN (C), AF: 70.71 kN (C), HE: 35.36 kN (C), BF: 10 kN (T), CG: 0, DH: 25 kN (T), BG: 14.14 kN (C), DG: 35.36 kN (C)

Answer

Zero-force member: CG
5.Shear force & bending moment

Answer: B (x = 2 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 53.33 kN, R2 = 26.67 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 106.7 kN·m, MC = 93.33, MD = 80, ME = 66.67, MF = 53.33, MG = 0

Answer

Mark B: MB = 106.7 kN·m
6.Shear force & bending moment

Answer: Mmax = 63.38 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 3·8 = 24 kN, acting at x̄ = 4 m
ΣMA = 0: RB·8 = 60·7 + 3·8·4
RB = 516/8 = 64.5 kN
ΣFy = 0: RA = 84 − 64.5 = 19.5 kN

Where is V = 0?

RA − w·x0 = 0 → x0 = 19.5/3 = 6.5 m

Maximum moment

Mmax = RA·x0 − w·x0²/2 = 19.5·6.5 − 3·6.5²/2 = 63.38 kN·m

Answer

Mmax = 63.38 kN·m

It occurs at x = 6.5 m from A.

7.Beam deflection

Answer: δ = 12.69 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 5 N/mm, L = 3000 mm
EI = 3.99 × 10¹² N·mm²

Deflection

δ = wL⁴/(8EI) = 5·3000⁴/(8·3.99 × 10¹²) = 12.69 mm

Answer

δ = 12.69 mm
8.Beam deflection

Answer: MA = 45 kN·m

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).

Remove the prop

Without the prop the beam is a cantilever. Its free end would deflect under the load.

δload = P(L/2)²(3L − L/2)/(6EI) = 5PL³/(48EI)

Compatibility at the prop

The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.

RB·L³/(3EI) = 5PL³/(48EI) → RB = 5P/16 = 5·60/16 = 18.75 kN

Moment at the fixed end

Moments about A of the loads and the prop force.

MA = P·L/2 − RB·L = 120 − 75 = 45 kN·m

Answer

MA = 45 kN·m
9.Column buckling

Answer: Pcr = 47 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A rectangle buckles about its weak axis, using the smaller dimension cubed.

Imin = h·b³/12 = 100·40³/12 = 533333 mm⁴

Effective length

KL = 0.7·4000 = 2800 mm

Critical load

Pcr = π²EI/(KL)² = π²·70000·533333/2800² = 46998 N = 47 kN

Answer

Pcr = 47 kN
10.Column buckling

Answer: d = 76.18 mm

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Required critical load

Pcr = n·P = 2.5·145000 = 362500 N
KL = 2·1500 = 3000 mm

Solve for the diameter

d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·362500·3000²/(π³·200000))^(1/4) = 76.18 mm

Answer

d = 76.18 mm

Check: the slenderness KL/r is 157.5, so the column is slender and Euler applies.

11.Centroid & second moment of area

Answer: r = 60.21 mm

Second moment of area: for a rectangle about its own centroidal axis I = bh³/12, and about its base bh³/3 (parallel-axis theorem I = Ic + A·d²). A hole is handled by subtracting its I, as long as both parts share the same axis. The elastic section modulus is S = I/c, where c is the distance to the extreme fibre. The radius of gyration r = √(I/A) is the distance at which the whole area would give the same I; it is used in column buckling.

Net area and second moment of area

A = π(D² − d²)/4 = 5341 mm²
I = π(D⁴ − d⁴)/64 = 1.936 × 10⁷ mm⁴

Radius of gyration

r = √(I/A) = √(1.936 × 10⁷/5341) = 60.21 mm

Answer

r = 60.21 mm
12.Centroid & second moment of area

Answer: Ix = 70.06 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into three rectangles

Measure every y from the bottom edge.

top flange: A = 1100 mm², y = 257 mm
web: A = 3840 mm², y = 132 mm
bottom flange: A = 2400 mm², y = 6 mm

Centroid

ȳ = (1100·257 + 3840·132 + 2400·6)/7340 = 109.5 mm

Parallel-axis theorem

top flange: 110·10³/12 + 1100·147.5² = 2.393 × 10⁷ mm⁴
web: 16·240³/12 + 3840·22.47² = 2.037 × 10⁷ mm⁴
bottom flange: 200·12³/12 + 2400·103.5² = 2.576 × 10⁷ mm⁴
Ix = 2.393 × 10⁷ + 2.037 × 10⁷ + 2.576 × 10⁷
Ix = 7.006 × 10⁷ mm⁴ = 70.06 × 10⁶ mm⁴

Answer

Ix = 70.06 × 10⁶ mm⁴
13.Effective stress in soil

Answer: σ′ = 71.76 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 16.5·2 + 19.5·4 = 111 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·4 = 39.24 kPa

Effective stress

σ′ = σ − u = 111 − 39.24 = 71.76 kPa

Answer

σ′ = 71.76 kPa
14.Effective stress in soil

Answer: σ′ = 73.45 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·2 + γsat,sand·1 + γsat,clay·4
σ = 16·2 + 20.5·1 + 17.5·4 = 122.5 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·5 = 49.05 kPa

Effective stress

σ′ = σ − u = 122.5 − 49.05 = 73.45 kPa

Answer

σ′ = 73.45 kPa
15.Consolidation settlement

Answer: S = 75.13 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Preconsolidation pressure

σ′p = OCR·σ′0 = 2.5·80 = 200 kPa

Compare with the preconsolidation pressure

σ′f = 80 + 110 = 190 kPa ≤ 200 kPa

Settlement

The clay stays on its recompression line.

S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.06·5.5/(1 + 0.65)·log₁₀(190/80) = 75.13 mm

Answer

S = 75.13 mm
16.Consolidation settlement

Answer: t = 2.714 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H/2 = 8/2 = 4 m

Time

t = Tv·Hdr²/cv = 0.848·4²/5 = 2.714 years

Answer

t = 2.714 years
17.Hydrostatic force

Answer: F = 235.4 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 2.5 + 3/2 = 4 m
A = H·b = 3·2 = 6 m²
gated = 2.5 mH = 3 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·4·6 = 235.4 kN

Answer

F = 235.4 kN
18.Hydrostatic force

Answer: F = 12.95 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1 + 1/2 = 1.5 m
A = H·b = 1·1 = 1 m²
gated = 1 mH = 1 mF

Resultant force

F = ρ·g·yc·A = 880·9.81·1.5·1 = 12.95 kN

Answer

F = 12.95 kN
19.Pipe friction & head loss

Answer: hf = 3.7 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity head

V²/(2g) = 1.1²/(2·9.81) = 0.06167 m

Darcy–Weisbach

hf = f·(L/D)·V²/(2g) = 0.03·(200/0.1)·1.1²/(2·9.81) = 3.7 m

Answer

hf = 3.7 m
20.Pipe friction & head loss

Answer: Q = 175.9 L/s

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Loss coefficients

f·L/D = 0.018·400/0.3 = 24
ΣK = 0.5 + 4·0.3 + 5 + 1.0 = 7.7

Energy equation

Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.

10 = (24 + 7.7)·V²/(2·9.81)
V = √(2·9.81·10/31.7) = 2.488 m/s

Flow rate

Q = V·π·D²/4 = 2.488·0.07069 = 0.1759 m³/s = 175.9 L/s

Answer

Q = 175.9 L/s
21.Open-channel flow (Manning)

Answer: Q = 8.643 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (4.5 + 1.5·1)·1 = 6 m²
P = b + 2y·√(1 + z²) = 4.5 + 2·1·√(1 + 1.5²) = 8.106 m
R = A/P = 0.7402 m

Velocity

V = (1/0.022)·0.74022/3·0.00151/2 = 1.441 m/s

Flow rate

Q = A·V = 6·1.441 = 8.643 m³/s

Answer

Q = 8.643 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.00212 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Hydraulic radius

R = D/4 = 0.6/4 = 0.15 m

Solve Manning for S

S = (n·V/R2/3)² = (0.013·1/0.2823)² = 0.00212

Answer

S = 0.00212

That is a fall of 2.12 m per kilometre.

23.Pumps & pump power

Answer: Pshaft = 62.78 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.08·64 = 50.23 kW

Shaft power

Pshaft = Ph/η = 50.23/0.8 = 62.78 kW

Answer

Pshaft = 62.78 kW
24.Pumps & pump power

Answer: H = 31.79 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.05/0.01767 = 2.829 m/s
V²/(2g) = 0.408 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (20 + 4)·0.408 = 9.793 m

Pump head

Both surfaces are open and practically at rest, so pressure and velocity terms drop out.

H = Δz + hL = 22 + 9.793 = 31.79 m

Answer

H = 31.79 m
25.Time value of money

Answer: PV = 33050 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate and number of periods

i = 0.048/4 = 0.012
N = 4·4 = 16

Present value

PV = FV/(1 + i)N = 40 000/1.21 = €33 050.02

Answer

PV = €33 050.02
26.Time value of money

Answer: N = 46 payments

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rearrange the annuity formula

i = 0.006
(1 + i)−N = 1 − 5 000·0.006/125 = 0.76

Solve with logarithms

N = −ln(0.76)/ln(1.006) = 45.88

Round up to whole payments

45 full payments leave a small balance, which the last, smaller payment clears.

N = 46

Answer

N = 46 payments
27.NPV & IRR

Answer: EAC = 12653 €

Equivalent annual cost: spread the present value of all costs over the life as an equal yearly amount (an annuity): EAC = PV·r/(1 − (1 + r)⁻ⁿ). It lets you compare machines with different lives.

Annuity factor

(1 − 1.08−6)/0.08 = 4.623

Annualised purchase price

40 000/4.623 = 8 652.62

EAC

EAC = 8 652.62 + 4 000 = €12 652.62

Answer

EAC = €12 652.62
28.NPV & IRR

Answer: NPV = −9322 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of the growing annuity

((1.05)/(1.1))10 = 0.628
PV = 9 500/(0.1 − 0.05)·(1 − 0.628) = 70 678.22

NPV

NPV = 70 678.22 − 80 000 = −€9 321.78

Answer

NPV = −€9 321.78

NPV is negative, so the project earns less than the required return.

29.Normal distribution

Answer: P = 0.02275

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the sum

μ = 32 min, σ = √(1.5² + 2²) = 2.5 min

Standardise

z = (37 − 32)/2.5 = 2

Upper tail

P = 1 − Φ(2) = 1 − 0.9772 = 0.02275

Answer

P = 0.02275
30.Normal distribution

Answer: x = 185.3 cm

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left

Φ(z) = 0.85

z from the table

z ≈ 1.04

Back to the original units

x = 178 + 1.04·7 = 185.3 cm

Answer

x = 185.3 cm

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.

ExamProblems · examproblems.com/courses/fe-exam-civil