laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The beam has a pin at A and a roller at B, 3 m from A, and overhangs B to the free end C. Find the vertical reaction RB, taking upward as positive.
AB = 3 mAC = 4 mP1 = 15 kN at 1 mP2 = 15 kN at 4 m
RB = kN
2.Beam support reactionsHard
The beam has a pin at A and a roller at B, 3 m from A, and overhangs B to the free end C. It carries a point load P at 1.5 m from A and a uniformly distributed load w from 3 m to the free end at 4 m. Find the vertical reaction RB, taking upward as positive.
AB = 3 mAC = 4 mP = 35 kN at 1.5 mw = 12 kN/m from 3 to 4 m
RB = kN
3.Truss: method of jointsMedium
Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.
span = 6 mheight = 3 mB is 2 m from Avertical load = 30 kN
FAC = kN
4.Truss: method of jointsHard
Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.
span = 8 mheight = 4 mB is 7 m from Avertical load = 15 kNhorizontal load = 30 kN ←
FAB = kN
5.Shear force & bending momentMedium
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
15 kN @ 3 m15 kN/m, 0–6 m
1A (x = 0 m)
2B (x = 1 m)
3C (x = 2 m)
4D (x = 3 m)
5E (x = 4 m)
6F (x = 5 m)
7G (x = 6 m)
6.Shear force & bending momentHard
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
50 kN @ 0 m15 kN @ 6 m40 kN @ 2 m6 kN/m, 1–5 m
1A (x = 0 m)
2B (x = 1 m)
3C (x = 2 m)
4D (x = 3 m)
5E (x = 4 m)
6F (x = 5 m)
7G (x = 6 m)
7.Beam deflectionMedium
A cantilever carries a uniformly distributed load w over its whole length and a point load P at its free end. Using superposition, find the deflection δ at the free end.
P = 2 kNw = 4 kN/mL = 5 mE = 200 GPa (steel)I = 160 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.
w = 15 kN/mL = 1.5 mE = 70 GPa (aluminium)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
A column of length L made of steel is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 3 mE = 200 GPa (steel)b × h = 20 × 40 mm
Pcr = kN
10.Column bucklingHard
A solid round column of length L made of steel is fixed at the base and pinned at the top. It must carry 50 kN with a factor of safety of 3 against buckling. Find the smallest diameter d.
P = 50 kNn = 3L = 4 mE = 200 GPa (steel)
d = mm
11.Centroid & second moment of areaMedium
Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.
bf = 180 mmtf = 10 mmtw = 8 mmhw = 100 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A cast-iron beam has the T-section shown, with the flange on top. The allowable stresses are 50 MPa in tension and 150 MPa in compression. Find the largest sagging bending moment Mallow the beam can carry.
A 4 m thick overconsolidated clay layer has Cc = 0.2, Cr = 0.06 and e₀ = 0.7. At its mid-depth the effective vertical stress is 115 kPa and the overconsolidation ratio is OCR = 3. A new building adds 50 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 6 m thick has a coefficient of consolidation cv = 1.5 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 50% average consolidation the time factor is Tv = 0.197. How many years t does the layer take to reach 50% consolidation?
A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 3 m wide sits in the wall of a tank of glycerin, with its top edge 1.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.
Water flows at a mean velocity of 0.9 m/s through a pipe 400 m long with an inside diameter of 250 mm. Use the Darcy friction factor f = 0.025 and g = 9.81 m/s². Find the friction head loss hf.
Two open reservoirs are joined by a pipe 200 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.018. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each), a valve (K = 0.2) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 150 L/s?
A concrete storm sewer with an inside diameter of 1200 mm flows just full (as an open channel, not under pressure). Manning n = 0.013 and the slope is S = 0.0005. Find the flow rate Q in m³/s.
D = 1200 mmn = 0.013S = 0.0005
Q = m³/s
22.Open-channel flow (Manning)Hard
A rectangular unfinished concrete channel 2 m wide must carry 2.6 m³/s in uniform flow at a depth of 1.2 m. Manning n = 0.014. Find the required bed slope S (in m/m).
Q = 2.6 m³/sb = 2 my = 1.2 mn = 0.014
S = m/m
23.Pumps & pump powerMedium
A pump with an efficiency of 70% delivers 15 L/s of water (ρ = 1000 kg/m³) against a head of 24 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.
Q = 15 L/sH = 24 mη = 70%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
A pump moves 120 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 26 m higher. The pipe is 100 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.022; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 350 kPa. Find the head H the pump must add.
You invest €3 000 at a nominal rate of 4% per year, compounded quarterly. Find the value FV of the investment after 7 years.
PV = €3 0004% / 4n = 7
FV = €
26.Time value of moneyHard
You want €50 000 in 8 years. You save the same amount at the end of every month in an account paying 5.4% per year, compounded monthly. Find the monthly deposit A.
FV = €50 0005.4% / 12N = 96
A = €
27.NPV & IRRMedium
A project costs €250 000 today. It generates €18 000 at the end of the first year, and the cash flow then grows by 3% per year forever. The cost of capital is 11%. Find the net present value NPV.
C0 = €250 000CF1 = €18 000g = 3%r = 11%
NPV = €
28.NPV & IRRHard
A project costs €50 000 and returns €26 500, €34 000, €30 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
CF0 = −50 000CF1 = 26 500CF2 = 34 000CF3 = 30 500
IRR = %
29.Normal distributionMedium
The delivery times are normally distributed with mean 32 min and standard deviation 6 min. What fraction lies between 20 and 43.1 min? Give P as a decimal.
μ = 32σ = 6x1 = 20x2 = 43.1
P =
30.Normal distributionHard
The bag weights are normally distributed with mean 250 g and standard deviation 5 g. Drag the cut-off so the shaded bottom 40% is to the left of it. Find the cut-off x.
μ = 250 gσ = 5 g40%
x = g
3Solutions
1.Beam support reactions
Answer: RB = 25 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Moments about A
Counter-clockwise positive.
ΣMA = 0: RB·3 = 15·1 + 15·4
RB = 75/3 = 25 kN
Vertical equilibrium
RA = 15 + 15 − 25 = 5 kN
Answer
RB = 25 kN
2.Beam support reactions
Answer: RB = 31.5 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Resultant of the distributed load
W = 12·1 = 12 kN, x̄ = (3 + 4)/2 = 3.5 m
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·3 = 35·1.5 + 12·3.5
RB = 94.5/3 = 31.5 kN
RA = 47 − 31.5 = 15.5 kN
Answer
RB = 31.5 kN
3.Truss: method of joints
Answer: FAC = 13.33 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·6 = 30·2 → Cy = 10 kN
ΣFy = 0: Ay = 30 − 10 = 20 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·8 = 15·7 − 30·4 → Cy = −1.875 kN
ΣFy = 0: Ay = 15 − −1.875 = 16.88 kN
ΣFx = 0: Ax = 30 kN
Joint A
Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.
sin α = 4/8.062 = 0.4961
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −16.88/0.4961 = −34.01 kN
Answer
FAB = −34.01 kN (compression)
5.Shear force & bending moment
Answer: D (x = 3 m)
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 52.5 kN, R2 = 52.5 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = 45, MC = 75, MD = 90 kN·m, ME = 75, MF = 45, MG = 0
Answer
Mark D: MD = 90 kN·m
6.Shear force & bending moment
Answer: B (x = 1 m)
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 100.8 kN, R2 = 28.25 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = −50 kN·m, MC = −2.25, MD = −0.5, ME = −4.75, MF = −15, MG = 0
Answer
Mark B: MB = −50 kN·m
7.Beam deflection
Answer: δ = 12.37 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 2000 N, w = 4 N/mm, L = 5000 mm
EI = 3.2 × 10¹³ N·mm²
Each load on its own
δP = PL³/(3EI) = 2000·5000³/(3·3.2 × 10¹³) = 2.604 mm
δw = wL⁴/(8EI) = 4·5000⁴/(8·3.2 × 10¹³) = 9.766 mm
Add them
δ = 2.604 + 9.766 = 12.37 mm
Answer
δ = 12.37 mm
8.Beam deflection
Answer: Ireq = 3.39 × 10⁶ mm⁴
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Deflection limit
δallow = L/360 = 1500/360 = 4.167 mm
Required second moment of area
I = 5wL⁴/(384·E·δallow) = 5·15·1500⁴/(384·70000·4.167) = 3.39 × 10⁶ mm⁴
Ireq = 3.39 × 10⁶ mm⁴
Answer
Ireq = 3.39 × 10⁶ mm⁴
9.Column buckling
Answer: Pcr = 11.94 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Required critical load
Pcr = n·P = 3·50000 = 150000 N
KL = 0.7·4000 = 2800 mm
Solve for the diameter
d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·150000·2800²/(π³·200000))^(1/4) = 59.02 mm
Answer
d = 59.02 mm
Check: the slenderness KL/r is 189.8, so the column is slender and Euler applies.
11.Centroid & second moment of area
Answer: Ix = 2.357 × 10⁶ mm⁴
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 180·10 = 1800 mm², yf = 100 + 10/2 = 105 mm
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Sagging: the top is in compression, the bottom in tension.
top edge: M = 150·4.599 × 10⁷/97.27 = 70.93 kN·m
bottom edge: M = 50·4.599 × 10⁷/222.7 = 10.33 kN·m
Governing value
Mallow = min = 10.33 kN·m (bottom edge)
Answer
Mallow = 10.33 kN·m
13.Effective stress in soil
Answer: σ = 134 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·1 + γsat,sand·2 + γsat,clay·2
σ = 17·1 + 18.5·2 + 18.5·2 = 91 kPa
Answer
σ = 91 kPa
15.Consolidation settlement
Answer: S = 22.13 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Preconsolidation pressure
σ′p = OCR·σ′0 = 3·115 = 345 kPa
Compare with the preconsolidation pressure
σ′f = 115 + 50 = 165 kPa ≤ 345 kPa
Settlement
The clay stays on its recompression line.
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.06·4/(1 + 0.7)·log₁₀(165/115) = 22.13 mm
Answer
S = 22.13 mm
16.Consolidation settlement
Answer: t = 4.728 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H = 6 m
Time
t = Tv·Hdr²/cv = 0.197·6²/1.5 = 4.728 years
Answer
t = 4.728 years
17.Hydrostatic force
Answer: F = 176.6 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1.5 + 3/2 = 3 m
A = H·b = 3·2 = 6 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3·6 = 176.6 kN
Answer
F = 176.6 kN
18.Hydrostatic force
Answer: ycp = 2.333 m
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1.5 + 1.5/2 = 2.25 m
A = H·b = 1.5·3 = 4.5 m²
Resultant force
F = ρ·g·yc·A = 1260·9.81·2.25·4.5 = 125.2 kN
Centre of pressure
Pressure grows with depth, so the resultant acts below the centroid.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity head
V²/(2g) = 0.9²/(2·9.81) = 0.04128 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.025·(400/0.25)·0.9²/(2·9.81) = 1.651 m
Answer
hf = 1.651 m
20.Pipe friction & head loss
Answer: Δz = 3.351 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.15/0.07069 = 2.122 m/s
V²/(2g) = 0.2295 m
Loss coefficients
f·L/D = 0.018·200/0.3 = 12
ΣK = 0.5 + 3·0.3 + 0.2 + 1.0 = 2.6
Total head loss
hf = 12·0.2295 = 2.754 m
hm = 2.6·0.2295 = 0.5967 m
Δz = hf + hm = 3.351 m
Answer
Δz = 3.351 m
21.Open-channel flow (Manning)
Answer: Q = 0.8718 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = 1.131 m², R = D/4 = 0.3 m
Velocity
V = (1/0.013)·0.32/3·0.00051/2 = 0.7708 m/s
Flow rate
Q = A·V = 1.131·0.7708 = 0.8718 m³/s
Answer
Q = 0.8718 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.0005161 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.015·24 = 3.532 kW
Shaft power
Pshaft = Ph/η = 3.532/0.7 = 5.045 kW
Answer
Pshaft = 5.045 kW
24.Pumps & pump power
Answer: H = 66.8 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are practically at rest, so there is no velocity head term.
H = Δz + p/(ρ·g) + hL = 26 + 35.68 + 5.117 = 66.8 m
Answer
H = 66.8 m
25.Time value of money
Answer: FV = 3964 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rate and number of periods
i = r/m = 0.04/4 = 0.01
N = m·n = 4·7 = 28
Future value
FV = 3 000·(1 + 0.01)28 = 3 000·1.321 = €3 963.87
Answer
FV = €3 963.87
26.Time value of money
Answer: A = 417.6 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Value of the cash flows
PV = 18 000/(0.11 − 0.03) = 225 000.00
NPV
NPV = 225 000.00 − 250 000 = −€25 000.00
Answer
NPV = −€25 000.00
NPV is negative, so the project earns less than the required return.
28.NPV & IRR
Answer: IRR = 35.99 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(35%) = 681.81
NPV(40%) = −2 609.33
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z-scores
z₁ = (20 − 32)/6 = −2
z₂ = (43.1 − 32)/6 = 1.85
Area between
P = Φ(1.85) − Φ(−2) = 0.9678 − 0.02275 = 0.9451
Answer
P = 0.9451
30.Normal distribution
Answer: x = 248.8 g
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left
Φ(z) = 0.4
z from the table
z ≈ −0.25
Back to the original units
x = 250 − 0.25·5 = 248.8 g
Answer
x = 248.8 g
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.