1Formulas and methods

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

2Practice problems

1.Effective stress in soilMedium
sandγd​ = 15.5 kN/m³γsat​ = 20 kN/m³6 mwater tableXz = 4 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 4 mzw = 2 mγw = 9.81 kN/m³sand: γd = 15.5 kN/m³sand: γsat = 20 kN/m³
σ′ = kPa
2.Effective stress in soilHard
sandγd​ = 15 kN/m³γsat​ = 20.5 kN/m³3 mclayγsat​ = 17.5 kN/m³7 mwater tableXz = 6.5 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 6.5 mzw = 1 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 20.5 kN/m³clay: γsat = 17.5 kN/m³
σ = kPa
3.Consolidation settlementMedium
Δσ = 50 kPasandclayCc​ = 0.3, Cr​ = 0.02e0​ = 0.6σ′0​ = 95 kPaOCR = 2.53.5 mwater table

A 3.5 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.02 and e₀ = 0.6. At its mid-depth the effective vertical stress is 95 kPa and the overconsolidation ratio is OCR = 2.5. A new building adds 50 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 3.5 mCc = 0.3Cr = 0.02e0 = 0.6σ′0 = 95 kPaOCR = 2.5Δσ = 50 kPa
S = mm
4.Consolidation settlementHard
sandclayH = 3.5 mcv​ = 0.5 m²/year3.5 mimpervious rockwater table

A clay layer 3.5 m thick has a coefficient of consolidation cv = 0.5 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 50% average consolidation the time factor is Tv = 0.197. How many years t does the layer take to reach 50% consolidation?

H = 3.5 mcv = 0.5 m²/yearU = 50%Tv = 0.197single drainage
t = years
5.Hydrostatic forceMedium
gated = 3 mH = 2.5 m

A vertical rectangular gate 1.5 m wide sits in the wall of a tank of water, with its top edge 3 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 3 mH = 2.5 mb = 1.5 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
6.Hydrostatic forceHard
gated = 4 mH = 2.5 m

A vertical rectangular gate 1.5 m wide sits in the wall of a tank of seawater, with its top edge 4 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 4 mH = 2.5 mb = 1.5 mρ = 1025 kg/m³g = 9.81 m/s²
F = kN

3Solutions

1.Effective stress in soil

Answer: σ′ = 51.38 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 15.5·2 + 20·2 = 71 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·2 = 19.62 kPa

Effective stress

σ′ = σ − u = 71 − 19.62 = 51.38 kPa

Answer

σ′ = 51.38 kPa
2.Effective stress in soil

Answer: σ = 117.3 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·1 + γsat,sand·2 + γsat,clay·3.5
σ = 15·1 + 20.5·2 + 17.5·3.5 = 117.3 kPa

Answer

σ = 117.3 kPa
3.Consolidation settlement

Answer: S = 8.034 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Preconsolidation pressure

σ′p = OCR·σ′0 = 2.5·95 = 237.5 kPa

Compare with the preconsolidation pressure

σ′f = 95 + 50 = 145 kPa ≤ 237.5 kPa

Settlement

The clay stays on its recompression line.

S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.02·3.5/(1 + 0.6)·log₁₀(145/95) = 8.034 mm

Answer

S = 8.034 mm
4.Consolidation settlement

Answer: t = 4.827 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H = 3.5 m

Time

t = Tv·Hdr²/cv = 0.197·3.5²/0.5 = 4.827 years

Answer

t = 4.827 years
5.Hydrostatic force

Answer: F = 156.3 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 3 + 2.5/2 = 4.25 m
A = H·b = 2.5·1.5 = 3.75 m²
gated = 3 mH = 2.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·4.25·3.75 = 156.3 kN

Answer

F = 156.3 kN
6.Hydrostatic force

Answer: F = 198 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 4 + 2.5/2 = 5.25 m
A = H·b = 2.5·1.5 = 3.75 m²
gated = 4 mH = 2.5 mF

Resultant force

F = ρ·g·yc·A = 1025·9.81·5.25·3.75 = 198 kN

Answer

F = 198 kN