Investments and Valuation: cram pack

Formula sheets, the key method steps for every topic and 8 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

Bond pricing & yield

Bond price
P = C·(1 − (1 + y)−n)/y + F/(1 + y)n
Semi-annual
C/2, y/2 and 2n periods
Current yield
C/P
Price and yield
yield up → price down

Method

  1. Find the coupon per period and the yield per period.
  2. Price = present value of the coupons (an annuity) + present value of the face value.
  3. For semi-annual coupons use half the coupon, half the yield and twice the periods.
  4. Check: if the yield is above the coupon rate, the price is below face value.

CAPM & WACC

CAPM
re = rf + β·(rm − rf)
WACC
E/V·re + D/V·rd·(1 − T)
Firm value
V = E + D

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

2Practice problems

1.Time value of moneyMedium
years012€2 000FV = ?

You invest €2 000 at a nominal rate of 3% per year, compounded monthly. Find the value FV of the investment after 2 years.

PV = €2 0003% / 12n = 2
FV = €
2.Time value of moneyHard
months01…72…360€150 000AB = ?A7.2% / 12

A mortgage of €150 000 is repaid with equal monthly payments over 30 years at 7.2% per year, compounded monthly. How much is still owed just after the payment at the end of year 6? Find the outstanding balance B.

P = €150 0007.2% / 12N = 360k = 72
B = €
3.Bond pricing & yieldMedium
half-years0123456€22.50€22.50€22.50 + €1 000P = ?

A bond with a face value of €1 000 pays a 4.5% annual coupon in two half-yearly payments and matures in 3 years. The yield to maturity is 7% per year. Find the price P of the bond.

F = €1 000coupon = 4.5%YTM = 7%n = 3
P = €
4.Bond pricing & yieldHard

A bond trades at €945 with a yield to maturity of 3% (annual compounding) and a Macaulay duration of 4.1 years. Use the modified duration to estimate the new price P if the yield rises by 75 basis points.

P0 = €945y = 3%D = 4.1Δy = +75 bp
P = €
5.CAPM & WACCMedium
WACC = ?equity€5 000 000re​ = 8%debt€5 000 000rd​ = 7%T = 21%

A company has equity worth €5 000 000 and debt worth €5 000 000. Its cost of equity is 8%, its pre-tax cost of debt is 7% and the tax rate is 21%. Find the WACC.

E = €5 000 000D = €5 000 000re = 8%rd = 7%T = 21%
WACC = %
6.CAPM & WACCHard
WACC = ?equity4 000 000 × €19.00β = 0.9rf​ = 2%, rm​ = 7%debt5 000 × €960rd​ = 4%T = 25.8%

A company has 4 000 000 shares at €19.00 each and 5 000 bonds trading at €960 each. The pre-tax cost of debt is 4% and the tax rate is 25.8%. The share’s beta is 0.9, the risk-free rate 2% and the market return 7%. Find the WACC.

β = 0.9rf = 2%rm = 7%rd = 4%T = 25.8%
WACC = %
7.NPV & IRRMedium
years01234−20 0005 0004 0009 0005 000

An investment of €20 000 gives these cash flows at the end of years 1 to 4: €5 000, €4 000, €9 000, €5 000. The cost of capital is 6%. Find the net present value NPV.

r = 6%CF0 = −20 000CF1 = 5 000CF2 = 4 000CF3 = 9 000CF4 = 5 000
NPV = €
8.NPV & IRRHard
years0123−10 0006 5007 0004 500

A project costs €10 000 and returns €6 500, €7 000, €4 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.

CF0 = −10 000CF1 = 6 500CF2 = 7 000CF3 = 4 500
IRR = %

3Solutions

1.Time value of money

Answer: FV = 2124 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate and number of periods

i = r/m = 0.03/12 = 0.0025
N = m·n = 12·2 = 24

Future value

FV = 2 000·(1 + 0.0025)24 = 2 000·1.062 = €2 123.51

Answer

FV = €2 123.51
2.Time value of money

Answer: B = 139396 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly payment

i = 0.006, N = 360
A = 150 000·0.006/(1 − (1 + 0.006)−360) = €1 018.18

Present value of the remaining payments

Whatever is still owed must be exactly paid off by the remaining payments.

N − k = 360 − 72 = 288
B = 1018·(1 − (1 + 0.006)−288)/0.006 = €139 396.13

Answer

B = €139 396.13
3.Bond pricing & yield

Answer: P = 933.4 €

Bond pricing: a bond’s price is the present value of its cash flows, discounted at the yield to maturity (YTM): the coupons form an annuity and the face value is paid back at maturity. P = C·(1 − (1 + y)⁻ⁿ)/y + F/(1 + y)ⁿ. When the yield is above the coupon rate the bond trades below face value, and the other way round.

Per period

C = €22.50, i = 0.035, N = 6

Present value of the coupons

€22.50·(1 − 0.8135)/0.035 = €119.89

Present value of the face value

€1 000·0.8135 = €813.50

Price

P = €933.39

Answer

P = €933.39

The yield is above the coupon rate, so the bond sells at a discount.

4.Bond pricing & yield

Answer: P = 916.8 €

Duration: the Macaulay duration is the weighted average time at which a bond pays its cash flows, with the present values of the cash flows as weights: D = Σ t·PVₜ/P. The modified duration D/(1 + y) estimates the percentage price change for a small change in yield: %ΔP ≈ −Dmod·Δy.

Modified duration

Dmod = 4.1/1.03 = 3.981

Estimated price change

%ΔP ≈ −3.981·(0.0075) = −2.985%
P ≈ 945·(1 − 0.02985) = €916.79

Answer

P = €916.79

Duration is a linear estimate; for large yield changes convexity makes the true price a little higher.

5.CAPM & WACC

Answer: WACC = 6.765 %

Cost of capital: CAPM gives the return shareholders require: re = rf + β·(rm − rf). The weighted average cost of capital mixes equity and debt by their market values: WACC = E/V·re + D/V·rd·(1 − T), with V = E + D. Interest is tax-deductible, hence the (1 − T).

Weights

V = €10 000 000, E/V = 0.5, D/V = 0.5

WACC

WACC = 0.5·8% + 0.5·7%·(1 − 0.21) = 6.765%

Answer

WACC = 6.765%
6.CAPM & WACC

Answer: WACC = 6.29 %

Cost of capital: CAPM gives the return shareholders require: re = rf + β·(rm − rf). The weighted average cost of capital mixes equity and debt by their market values: WACC = E/V·re + D/V·rd·(1 − T), with V = E + D. Interest is tax-deductible, hence the (1 − T).

Market values

E = 4 000 000·€19.00 = €76 000 000
D = 5 000·€960 = €4 800 000

Cost of equity (CAPM)

re = 2% + 0.9·5% = 6.5%

Weights

V = €80 800 000, E/V = 0.9406, D/V = 0.05941

WACC

WACC = 0.9406·6.5% + 0.05941·4%·(1 − 0.258) = 6.29%

Answer

WACC = 6.29%
7.NPV & IRR

Answer: NPV = −206 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of each cash flow

CF0 = −20 000
CF1/(1 + 0.06)1 = 5 000/1.06 = 4 716.98
CF2/(1 + 0.06)2 = 4 000/1.124 = 3 559.99
CF3/(1 + 0.06)3 = 9 000/1.191 = 7 556.57
CF4/(1 + 0.06)4 = 5 000/1.262 = 3 960.47

Add them up

NPV = €−205.99

Answer

NPV = €−205.99

NPV is negative, so the project earns less than the required return.

8.NPV & IRR

Answer: IRR = 38.79 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(35%) = 484.68
NPV(40%) = −145.77

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 35 + 5·484.68/(484.68 − (−145.77)) = 38.84%
exact: NPV(38.79%) = 0 → IRR = 38.79%

Answer

IRR = 38.79%

ExamProblems · examproblems.com/courses/investments-and-valuation