A voltmeter, an ammeter and a wattmeter connected to a single-phase inductive load read 230 V, 11.5 A and 2513 W. Find the reactive power Q taken by the load.
AC power & power factor worksheet with answers
A load takes 50 kW of real power and 26.5 kvar of reactive power (lagging). Find the apparent power S.
A single-phase motor takes 26 kW at a power factor of 0.6 lagging from a 240 V supply. Find the line current I.
A single-phase motor takes 2 kW at a power factor of 0.7 lagging from a 400 V supply. Find the line current I.
A single-phase load takes 21 kW at a power factor of 0.8 lagging from a 240 V, 50 Hz supply. A 220 µF capacitor is connected in parallel with the load. Find the new line current I.
A 15 kVA single-phase transformer supplies a load of 7 kW at a power factor of 0.85 lagging. How much extra real power ΔP can be added as a resistive (unity power factor) load before the transformer reaches its kVA rating?
Answer key
- 1. Q = 825.1 var
- 2. S = 56.59 kVA
- 3. I = 180.6 A
- 4. I = 7.143 A
- 5. I = 100.3 A
- 6. ΔP = 7.359 kW
Full step-by-step solutions: practise this topic on examproblems.com.