An 8.5 m thick layer of normally consolidated clay (Cc = 0.4, e₀ = 1.05) has an effective vertical stress of 65 kPa at its mid-depth. A wide fill raises the vertical stress in the clay by 60 kPa. Treat the layer as one sublayer with the stresses at its mid-depth. Find the primary consolidation settlement S in mm.
Consolidation settlement worksheet with answers
A 5 m thick normally consolidated clay layer (γsat = 18.5 kN/m³, Cc = 0.45, e₀ = 0.8) lies below 2 m of sand (γ = 18.5 kN/m³). The water table is at the top of the clay; use γw = 9.81 kN/m³. A wide fill raises the vertical stress throughout the clay by 140 kPa. Treat the layer as one sublayer with the stresses at its mid-depth. Find the primary consolidation settlement S in mm.
A 5.5 m thick overconsolidated clay layer has Cc = 0.4, Cr = 0.02 and e₀ = 0.95. At its mid-depth the effective vertical stress is 100 kPa and the overconsolidation ratio is OCR = 2. A new building adds 60 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A 6 m thick overconsolidated clay layer has Cc = 0.25, Cr = 0.04 and e₀ = 0.7. At its mid-depth the effective vertical stress is 100 kPa and the overconsolidation ratio is OCR = 1.5. A new building adds 180 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 6 m thick has a coefficient of consolidation cv = 1.2 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 90% average consolidation the time factor is Tv = 0.848. How many years t does the layer take to reach 90% consolidation?
In a laboratory oedometer test, a clay specimen 20 mm thick, drained at the top and bottom, reaches 50% consolidation in 12 min. In the field the same clay forms a layer 5 m thick. It lies on impervious rock, with sand above it, so water drains out only at the top. How many days t does the field layer take to reach 50% consolidation?
Answer key
- 1. S = 471 mm
- 2. S = 661.8 mm
- 3. S = 11.51 mm
- 4. S = 264 mm
- 5. t = 25.44 years
- 6. t = 2083 days