A 6.5 m thick layer of normally consolidated clay (Cc = 0.6, e₀ = 1.3) has an effective vertical stress of 140 kPa at its mid-depth. A wide fill raises the vertical stress in the clay by 75 kPa. Treat the layer as one sublayer with the stresses at its mid-depth. Find the primary consolidation settlement S in mm.
Consolidation settlement worksheet with answers
A 6.5 m thick layer of normally consolidated clay (Cc = 0.25, e₀ = 1.3) has an effective vertical stress of 60 kPa at its mid-depth. A wide fill raises the vertical stress in the clay by 70 kPa. Treat the layer as one sublayer with the stresses at its mid-depth. Find the primary consolidation settlement S in mm.
A 7.5 m thick overconsolidated clay layer has Cc = 0.5, Cr = 0.03 and e₀ = 1.15. At its mid-depth the effective vertical stress is 95 kPa and the overconsolidation ratio is OCR = 1.5. A new building adds 130 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A 6.5 m thick overconsolidated clay layer has Cc = 0.5, Cr = 0.04 and e₀ = 0.95. At its mid-depth the effective vertical stress is 120 kPa and the preconsolidation pressure is 220 kPa. A new building adds 30 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 6.5 m thick has a coefficient of consolidation cv = 1.2 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?
A clay layer 2 m thick has a coefficient of consolidation cv = 0.5 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?
Answer key
- 1. S = 315.9 mm
- 2. S = 237.2 mm
- 3. S = 364.4 mm
- 4. S = 12.92 mm
- 5. t = 2.526 years
- 6. t = 0.574 years
Full step-by-step solutions: practise this topic on examproblems.com.