A 2 m thick layer of normally consolidated clay (Cc = 0.6, e₀ = 1.1) has an effective vertical stress of 150 kPa at its mid-depth. A wide fill raises the vertical stress in the clay by 60 kPa. Treat the layer as one sublayer with the stresses at its mid-depth. Find the primary consolidation settlement S in mm.
Consolidation settlement worksheet with answers
A 6 m thick layer of normally consolidated clay (Cc = 0.15, e₀ = 0.65) has an effective vertical stress of 145 kPa at its mid-depth. A wide fill raises the vertical stress in the clay by 40 kPa. Treat the layer as one sublayer with the stresses at its mid-depth. Find the primary consolidation settlement S in mm.
A 3.5 m thick overconsolidated clay layer has Cc = 0.5, Cr = 0.06 and e₀ = 1.05. At its mid-depth the effective vertical stress is 100 kPa and the preconsolidation pressure is 140 kPa. A new building adds 190 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A 6 m thick overconsolidated clay layer has Cc = 0.4, Cr = 0.03 and e₀ = 0.85. At its mid-depth the effective vertical stress is 70 kPa and the overconsolidation ratio is OCR = 2.5. A new building adds 80 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 9.5 m thick has a coefficient of consolidation cv = 2 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?
A clay layer 3.5 m thick has a coefficient of consolidation cv = 1.5 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 90% average consolidation the time factor is Tv = 0.848. How many years t does the layer take to reach 90% consolidation?
Answer key
- 1. S = 83.5 mm
- 2. S = 57.71 mm
- 3. S = 285 mm
- 4. S = 32.2 mm
- 5. t = 3.238 years
- 6. t = 1.731 years
Full step-by-step solutions: practise this topic on examproblems.com.