A 4.5 m thick layer of normally consolidated clay (Cc = 0.3, e₀ = 1.25) has an effective vertical stress of 135 kPa at its mid-depth. A wide fill raises the vertical stress in the clay by 135 kPa. Treat the layer as one sublayer with the stresses at its mid-depth. Find the primary consolidation settlement S in mm.
Consolidation settlement worksheet with answers
A 5.5 m thick layer of normally consolidated clay (Cc = 0.6, e₀ = 1) has an effective vertical stress of 90 kPa at its mid-depth. A wide fill raises the vertical stress in the clay by 45 kPa. Treat the layer as one sublayer with the stresses at its mid-depth. Find the primary consolidation settlement S in mm.
A 7 m thick overconsolidated clay layer has Cc = 0.45, Cr = 0.06 and e₀ = 0.7. At its mid-depth the effective vertical stress is 115 kPa and the overconsolidation ratio is OCR = 1.5. A new building adds 120 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A 4 m thick overconsolidated clay layer has Cc = 0.5, Cr = 0.06 and e₀ = 1.15. At its mid-depth the effective vertical stress is 85 kPa and the overconsolidation ratio is OCR = 1.5. A new building adds 40 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 6 m thick has a coefficient of consolidation cv = 4 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 90% average consolidation the time factor is Tv = 0.848. How many years t does the layer take to reach 90% consolidation?
A clay layer 6.5 m thick has a coefficient of consolidation cv = 1 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?
Answer key
- 1. S = 180.6 mm
- 2. S = 290.6 mm
- 3. S = 292.3 mm
- 4. S = 18.7 mm
- 5. t = 1.908 years
- 6. t = 12.13 years
Full step-by-step solutions: practise this topic on examproblems.com.