A 7.5 m thick layer of normally consolidated clay (Cc = 0.25, e₀ = 0.75) has an effective vertical stress of 60 kPa at its mid-depth. A wide fill raises the vertical stress in the clay by 135 kPa. Treat the layer as one sublayer with the stresses at its mid-depth. Find the primary consolidation settlement S in mm.
Consolidation settlement worksheet with answers
An 8.5 m thick layer of normally consolidated clay (Cc = 0.3, e₀ = 1) has an effective vertical stress of 120 kPa at its mid-depth. A wide fill raises the vertical stress in the clay by 120 kPa. Treat the layer as one sublayer with the stresses at its mid-depth. Find the primary consolidation settlement S in mm.
A 6 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.02 and e₀ = 0.6. At its mid-depth the effective vertical stress is 70 kPa and the preconsolidation pressure is 110 kPa. A new building adds 15 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
An 8 m thick overconsolidated clay layer has Cc = 0.25, Cr = 0.04 and e₀ = 0.95. At its mid-depth the effective vertical stress is 110 kPa and the overconsolidation ratio is OCR = 2.5. A new building adds 20 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 8 m thick has a coefficient of consolidation cv = 1 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 80% average consolidation the time factor is Tv = 0.567. How many years t does the layer take to reach 80% consolidation?
A clay layer 2 m thick has a coefficient of consolidation cv = 1 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?
Answer key
- 1. S = 548.4 mm
- 2. S = 383.8 mm
- 3. S = 6.324 mm
- 4. S = 11.91 mm
- 5. t = 9.072 years
- 6. t = 0.287 years