A company claims that a proportion of 0.25 of its customers are satisfied. In a random survey of 100 customers, 35 say they are satisfied. Find the test statistic z for H₀: p = 0.25.
Hypothesis tests & confidence intervals worksheet with answers
A company claims that a proportion of 0.3 of its customers are satisfied. In a random survey of 100 customers, 37 say they are satisfied. Find the test statistic z for H₀: p = 0.3.
Two production lines make the same part. Line 1: a sample of 60 parts has mean length 140 mm, and the line's known standard deviation is 17 mm. Line 2: a sample of 60 parts has mean 133.2 mm, known standard deviation 8 mm. Find the test statistic z for H₀: μ₁ = μ₂, taking the difference as x̄₁ − x̄₂ (line 1 minus line 2).
A sample of 81 students has a mean score of 49.2 and a sample standard deviation of 8. Find the test statistic t for H₀: μ = 50.
A one-sided z test of H₀: μ = 50 against H₁: μ < 50 is done at α = 0.01 with a sample of 36; the standard deviation is known to be 3. In reality the mean is 49.15. Find the power 1 − β of the test in percent.
A sample of 16 measurements has mean 203.8. The population standard deviation is 15. Find the upper limit U of the 95% confidence interval for the mean.
Answer key
- 1. z = 2.309
- 2. z = 1.528
- 3. z = 2.803
- 4. t = −0.9
- 5. 1 − β = 26.57 %
- 6. U = 211.2
Full step-by-step solutions: practise this topic on examproblems.com.