A project costs €10 000 today and returns €4 000 at the end of each year for 3 years. The required rate of return is 12%. Find the net present value NPV.
NPV & IRR worksheet with answers
A project costs €40 000 today and returns €17 000 at the end of each year for 3 years. The required rate of return is 9%. Find the net present value NPV.
A project costs €250 000 today. It generates €24 000 at the end of the first year, and the cash flow then grows by 2% per year forever. The cost of capital is 10%. Find the net present value NPV.
An investment of €60 000 gives these cash flows at the end of years 1 to 4: €26 000, €21 000, €25 000, €13 000. The cost of capital is 6%. Find the net present value NPV.
A project costs €40 000 and returns €12 000, €17 000, €14 500 at the end of years 1 to 3. Cash flows can be reinvested at the cost of capital of 8%. Find the modified internal rate of return MIRR in percent.
A project costs €40 000 and returns €25 500, €30 000 at the end of years 1 to 2. Find its internal rate of return IRR in percent.
Answer key
- 1. NPV = −392.7 €
- 2. NPV = 3032 €
- 3. NPV = 50000 €
- 4. NPV = 14506 €
- 5. MIRR = 5.415 %
- 6. IRR = 24.16 %
Full step-by-step solutions: practise this topic on examproblems.com.