A project costs €80 000 today and returns €15 500, €16 500, €18 500, €31 500, €28 500, €16 000 at the end of years 1 to 6. Assume cash flows arrive evenly through each year. Find the payback period PB in years.
NPV & IRR worksheet with answers
A project costs €50 000 today and returns €11 500, €15 500, €19 500, €17 500, €18 000, €17 500 at the end of years 1 to 6. Assume cash flows arrive evenly through each year. Find the payback period PB in years.
A project costs €200 000 today. It generates €21 000 at the end of the first year, and the cash flow then grows by 4% per year forever. The cost of capital is 12%. Find the net present value NPV.
A machine costs €50 000 today. It generates €17 500 at the end of each year for 3 years and can then be sold for €12 500. The cost of capital is 10%. Find the net present value NPV.
A project costs €20 000 and returns €9 500, €10 000, €7 500 at the end of years 1 to 3. Cash flows can be reinvested at the cost of capital of 8%. Find the modified internal rate of return MIRR in percent.
A project costs €10 000 and returns €4 000, €5 000, €5 000 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
Answer key
- 1. PB = 3.937 years
- 2. PB = 3.2 years
- 3. NPV = 62500 €
- 4. NPV = 2911 €
- 5. MIRR = 13.68 %
- 6. IRR = 18.14 %