A project costs €25 000 today and returns €11 500 at the end of each year for 3 years. The required rate of return is 6%. Find the net present value NPV.
NPV & IRR worksheet with answers
A project costs €25 000 today and returns €10 000 at the end of each year for 5 years. The required rate of return is 15%. Find the net present value NPV.
A project costs €500 000 today. It generates €24 000 at the end of the first year, and the cash flow then grows by 3% per year forever. The cost of capital is 9%. Find the net present value NPV.
A machine costs €20 000 today, lasts 8 years and costs €1 500 per year to run (paid at the end of each year). The cost of capital is 8%. Find its equivalent annual cost EAC.
A project costs €20 000 and returns €7 500, €14 500 at the end of years 1 to 2. Find its internal rate of return IRR in percent.
A project costs €25 000 and returns €14 500, €14 500, €11 500, €8 000 at the end of years 1 to 4. Cash flows can be reinvested at the cost of capital of 10%. Find the modified internal rate of return MIRR in percent.
Answer key
- 1. NPV = 5740 €
- 2. NPV = 8522 €
- 3. NPV = −100000 €
- 4. EAC = 4980 €
- 5. IRR = 5.937 %
- 6. MIRR = 23.15 %