A project costs €20 000 today and returns €8 500 at the end of each year for 3 years. The required rate of return is 5%. Find the net present value NPV.
NPV & IRR worksheet with answers
A project costs €20 000 today and returns €4 000 at the end of each year for 6 years. The required rate of return is 12%. Find the profitability index PI.
An investment of €75 000 gives these cash flows at the end of years 1 to 3: €28 000, €18 000, €31 000. The cost of capital is 9%. Find the net present value NPV.
A project costs €60 000 today and returns €18 500, €25 500, €15 500, €16 000 at the end of years 1 to 4. The cost of capital is 8%. Assume cash flows arrive evenly through each year. Find the discounted payback period DPB in years.
A project costs €20 000 and returns €8 000, €12 000, €11 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
A project costs €40 000 and returns €29 500, €29 500 at the end of years 1 to 2. Find its internal rate of return IRR in percent.
Answer key
- 1. NPV = 3148 €
- 2. PI = 0.8223
- 3. NPV = −10224 €
- 4. DPB = 3.74 years
- 5. IRR = 24.9 %
- 6. IRR = 30.33 %