Open-channel flow (Manning) worksheet with answers

Free printable Open-channel flow (Manning) worksheet: 6 problems from easy to exam level, with an answer key. Print it or save it as a PDF.

For teachers: free to print, copy and use in class. Every new worksheet has new values and its own answer key. A link to ExamProblems on your course page is appreciated.

Name: ____________________   Date: ____________

1.Easy
b = 1.5 my = 0.6 mn = 0.014

Water flows uniformly 0.6 m deep in a rectangular unfinished concrete channel 1.5 m wide (Manning n = 0.014). The bed slope is S = 0.0005. Use Manning’s equation in SI units to find the mean velocity V.

b = 1.5 my = 0.6 mn = 0.014S = 0.0005
V = m/s
2.Easy
b = 3 my = 1.4 mn = 0.022

Water flows uniformly 1.4 m deep in a rectangular clean earth channel 3 m wide (Manning n = 0.022). The bed slope is S = 0.0005. Use Manning’s equation in SI units to find the mean velocity V.

b = 3 my = 1.4 mn = 0.022S = 0.0005
V = m/s
3.Medium
D = 900 mmn = 0.013, S = 0.004

A concrete storm sewer with an inside diameter of 900 mm flows just full (as an open channel, not under pressure). Manning n = 0.013 and the slope is S = 0.004. Find the flow rate Q in m³/s.

D = 900 mmn = 0.013S = 0.004
Q = m³/s
4.Medium
b = 3.5 my = 1.8 mn = 0.012, S = 0.0008

A rectangular finished concrete channel is 3.5 m wide. Water flows uniformly 1.8 m deep. Manning n = 0.012 and the bed slope is S = 0.0008. Find the flow rate Q in m³/s.

b = 3.5 my = 1.8 mn = 0.012S = 0.0008
Q = m³/s
5.Hard
b = 4.5 my = 1.8 mn = 0.012, Q = 26 m³/s

A rectangular finished concrete channel 4.5 m wide must carry 26 m³/s in uniform flow at a depth of 1.8 m. Manning n = 0.012. Find the required bed slope S (in m/m).

Q = 26 m³/sb = 4.5 my = 1.8 mn = 0.012
S = m/m
6.Hard
D = 600 mmn = 0.013, V = 1.2 m/s

A concrete sewer with an inside diameter of 600 mm (Manning n = 0.013) must reach a self-cleansing velocity of 1.2 m/s when flowing just full. Find the minimum slope S (in m/m).

D = 600 mmn = 0.013V = 1.2 m/s
S = m/m

Answer key

  1. 1. V = 0.7678 m/s
  2. 2. V = 0.8196 m/s
  3. 3. Q = 1.145 m³/s
  4. 4. Q = 13.71 m³/s
  5. 5. S = 0.001484 m/m
  6. 6. S = 0.003053 m/m

Full step-by-step solutions: practise this topic on examproblems.com.