Open-channel flow (Manning) worksheet with answers

Free printable Open-channel flow (Manning) worksheet: 6 problems from easy to exam level, with an answer key. Print it or save it as a PDF.

For teachers: free to print, copy and use in class. Every new worksheet has new values and its own answer key. A link to ExamProblems on your course page is appreciated.

Name: ____________________   Date: ____________

1.Easy
b = 3.5 my = 1.8 mn = 0.025

Water flows uniformly 1.8 m deep in a rectangular gravel channel 3.5 m wide (Manning n = 0.025). The bed drops 0.5 m per kilometre. Use Manning’s equation in SI units to find the mean velocity V.

b = 3.5 my = 1.8 mn = 0.025drop = 0.5 m/km
V = m/s
2.Easy
b = 1 my = 2 mn = 0.022

Water flows uniformly 2 m deep in a rectangular clean earth channel 1 m wide (Manning n = 0.022). The bed slope is S = 0.004. Use Manning’s equation in SI units to find the mean velocity V.

b = 1 my = 2 mn = 0.022S = 0.004
V = m/s
3.Medium
b = 5.5 my = 1.8 mn = 0.025, S = 0.004

A rectangular gravel channel is 5.5 m wide. Water flows uniformly 1.8 m deep. Manning n = 0.025 and the bed slope is S = 0.004. Find the flow rate Q in m³/s.

b = 5.5 my = 1.8 mn = 0.025S = 0.004
Q = m³/s
4.Medium
b = 4 my = 1.4 m3 : 1n = 0.014, S = 0.0005

A trapezoidal unfinished concrete channel has a bottom width of 4 m and side slopes of 3:1 (horizontal:vertical). Water flows uniformly 1.4 m deep. Manning n = 0.014 and the bed slope is S = 0.0005. Find the flow rate Q in m³/s.

b = 4 my = 1.4 mz = 3n = 0.014S = 0.0005
Q = m³/s
5.Hard
b = 1.5 my = 0.5 m3 : 1n = 0.014, Q = 2.2 m³/s

A trapezoidal unfinished concrete channel with a bottom width of 1.5 m and side slopes of 3:1 (horizontal:vertical) must carry 2.2 m³/s in uniform flow at a depth of 0.5 m. Manning n = 0.014. Find the required bed slope S (in m/m).

Q = 2.2 m³/sb = 1.5 my = 0.5 mz = 3n = 0.014
S = m/m
6.Hard
b = 1 my = 1.3 mn = 0.012, Q = 1.7 m³/s

A rectangular finished concrete channel 1 m wide must carry 1.7 m³/s in uniform flow at a depth of 1.3 m. Manning n = 0.012. Find the required bed slope S (in m/m).

Q = 1.7 m³/sb = 1 my = 1.3 mn = 0.012
S = m/m

Answer key

  1. 1. V = 0.8259 m/s
  2. 2. V = 1.561 m/s
  3. 3. Q = 26.49 m³/s
  4. 4. Q = 17 m³/s
  5. 5. S = 0.001912 m/m
  6. 6. S = 0.0009576 m/m

Full step-by-step solutions: practise this topic on examproblems.com.