The controller C(s) = 4 drives the plant G(s) = 5/(s(s + 3)) in a unity-feedback loop. What is the system type N of the loop?
Steady-state error & PID control worksheet with answers
The controller C(s) = 10(s + 2)/s drives the plant G(s) = 1/(s + 10) in a unity-feedback loop. What is the system type N of the loop?
The parabolic input r(t) = 2·t²/2 is applied to a unity-feedback loop with G(s) = 5(s + 5)/(s²(s + 5)). Find the steady-state error ess.
The input r(t) = 10 + 1t (a step plus a ramp) is applied to a unity-feedback loop with G(s) = 20/(s(s + 10)). Find the steady-state error ess.
A proportional controller K = 40 drives the plant G(s) = 1/(s(s + 4)) in a unity-feedback loop. Find the peak time tp of the step response.
A proportional controller K = 16 drives the plant G(s) = 10/(s(s + 5)) in a unity-feedback loop. Find the percent overshoot %OS of the step response.
Answer key
- 1. N = 1
- 2. N = 1
- 3. ess = 0.4
- 4. ess = 0.5
- 5. tp = 0.5236 s
- 6. %OS = 53.08 %
Full step-by-step solutions: practise this topic on examproblems.com.