FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
w = 4 kN/mP = 10 kNABRA​ = ?2 m3 m

The cantilever beam is fixed to the wall at A. It carries a uniformly distributed load w from the wall to 2 m and a point load P at 5 m from the wall. Find the vertical reaction RA at the wall.

L = 5 mP = 10 kN at 5 mw = 4 kN/m from 0 to 2 m
RA = kN
2.Beam support reactionsHard
P = 65 kNADCRD​ = ?3 m2 m3 m

A compound beam is fixed to the wall at A, has an internal hinge at C (3 m from A) and rests on a roller at D (8 m from A). It carries a point load P at 5 m from A. Find the reaction RD at the roller.

AC = 3 mAD = 8 mP = 65 kN at 5 m
RD = kN
3.Truss: method of jointsMedium
ABCDEFGH10 kN30 kN4 × 3 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 10 kN ↓G: 30 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
4.Truss: method of jointsHard
ABBCACACB40 kN5 kN6 m1 m3 m

Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.

span = 6 mheight = 3 mB is 1 m from Avertical load = 40 kNhorizontal load = 5 kN →
FAB = kN
5.Shear force & bending momentMedium
15 kN10 kNABCDEFG2 m2 m2 m2 m2 m2 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

15 kN @ 4 m10 kN @ 10 m
  1. 1A (x = 0 m)
  2. 2B (x = 2 m)
  3. 3C (x = 4 m)
  4. 4D (x = 6 m)
  5. 5E (x = 8 m)
  6. 6F (x = 10 m)
  7. 7G (x = 12 m)
6.Shear force & bending momentHard
w = 12 kN/mP = 25 kNAB1.5 m2.5 m

The simply supported beam carries a uniformly distributed load w over its whole span and a point load P. Find the maximum bending moment Mmax in the beam.

L = 4 mP = 25 kN at 1.5 mw = 12 kN/m from 0 to 4 m
Mmax = kN·m
7.Beam deflectionMedium
P = 29 kNABδ5.5 m2.5 m

A simply supported beam carries a point load P at a = 5.5 m from support A. Find the deflection δP under the load.

P = 29 kNa = 5.5 mL = 8 mE = 70 GPa (aluminium)I = 160 × 10⁶ mm⁴
δP = mm
8.Beam deflectionHard
P = 23 kNP = 23 kNABδ1.667 m1.666 m1.667 m

A simply supported beam carries two equal point loads P at its third points (L/3 from each support). Using superposition, find the midspan deflection δmax.

P = 23 kNL = 5 mE = 70 GPa (aluminium)I = 84 × 10⁶ mm⁴
δmax = mm
9.Column bucklingMedium
PL = 1 m40 × 80 mmcross-section

A column of length L made of aluminium is fixed at the base and free at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 1 mE = 70 GPa (aluminium)b × h = 40 × 80 mm
Pcr = kN
10.Column bucklingHard
P = 30 kNL = 3 md = ?cross-section

A solid round column of length L made of aluminium is fixed at the base and free at the top. It must carry 30 kN with a factor of safety of 3 against buckling. Find the smallest diameter d.

P = 30 kNn = 3L = 3 mE = 70 GPa (aluminium)
d = mm
11.Centroid & second moment of areaMedium
1703201414xdimensions in mm

A symmetric I-section has flanges 170 mm wide and 14 mm thick, an overall depth of 320 mm and a web 14 mm thick. Find its elastic section modulus Sx for bending about the horizontal centroidal axis x.

B = 170 mmH = 320 mmtf = 14 mmtw = 14 mm
Sx = × 10³ mm³
12.Centroid & second moment of areaHard
200 mm200 mm80 mm80 × 20xIx​ = ?

A 200 mm × 200 mm plate has a rectangular cut-out 80 mm wide and 20 mm high, centred on the vertical centre line with its centre 80 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 200 mmh = 200 mmcut-out: 80 × 20 mmhole centre: y = 80 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
sandγd​ = 16.5 kN/m³γsat​ = 18.5 kN/m³6 mwater tableXz = 5 m

For the soil profile shown, find the pore water pressure u at point X.

z = 5 mzw = 1 mγw = 9.81 kN/m³sand: γd = 16.5 kN/m³sand: γsat = 18.5 kN/m³
u = kPa
14.Effective stress in soilHard
sandγd​ = 16 kN/m³γsat​ = 19 kN/m³4 mclayγsat​ = 17.5 kN/m³6 mwater tableXz = 7 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 7 mzw = 2 mγw = 9.81 kN/m³sand: γd = 16 kN/m³sand: γsat = 19 kN/m³clay: γsat = 17.5 kN/m³
σ = kPa
15.Consolidation settlementMedium
Δσ = 25 kPasandclayCc​ = 0.25, Cr​ = 0.02e0​ = 0.75σ′0​ = 75 kPaσ′p​ = 145 kPa3.5 mwater table

A 3.5 m thick overconsolidated clay layer has Cc = 0.25, Cr = 0.02 and e₀ = 0.75. At its mid-depth the effective vertical stress is 75 kPa and the preconsolidation pressure is 145 kPa. A new building adds 25 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 3.5 mCc = 0.25Cr = 0.02e0 = 0.75σ′0 = 75 kPaσ′p = 145 kPaΔσ = 25 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 7 mcv​ = 3 m²/year7 msandwater table

A clay layer 7 m thick has a coefficient of consolidation cv = 3 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?

H = 7 mcv = 3 m²/yearU = 60%Tv = 0.287double drainage
t = years
17.Hydrostatic forceMedium
gated = 0.5 mH = 1.5 m

A vertical rectangular gate 1.5 m wide sits in the wall of a tank of water, with its top edge 0.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 0.5 mH = 1.5 mb = 1.5 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 0.5 mH = 2.5 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of glycerin, with its top edge 0.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 0.5 mH = 2.5 mb = 2 mρ = 1260 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
Q = 50 L/sD = 250 mmL = 50 mf = 0.02

Water flows at 50 L/s through a pipe 50 m long with an inside diameter of 250 mm. Use the Darcy friction factor f = 0.02 and g = 9.81 m/s². Find the friction head loss hf.

Q = 50 L/sL = 50 mD = 250 mmf = 0.02g = 9.81 m/s²
hf = m
20.Pipe friction & head lossHard
K = 2Δz = ?L = 500 m, D = 250 mm, f = 0.0152× bend (K = 0.3)

Two open reservoirs are joined by a pipe 500 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.015. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 2) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 100 L/s?

Q = 100 L/sL = 500 mD = 250 mmf = 0.015Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 2Kexit = 1.0
Δz = m
21.Open-channel flow (Manning)Medium
b = 1.5 my = 1.1 m1 : 1n = 0.014, S = 0.0008

A trapezoidal unfinished concrete channel has a bottom width of 1.5 m and side slopes of 1:1 (horizontal:vertical). Water flows uniformly 1.1 m deep. Manning n = 0.014 and the bed slope is S = 0.0008. Find the flow rate Q in m³/s.

b = 1.5 my = 1.1 mz = 1n = 0.014S = 0.0008
Q = m³/s
22.Open-channel flow (Manning)Hard
D = 250 mmn = 0.013, V = 0.75 m/s

A concrete sewer with an inside diameter of 250 mm (Manning n = 0.013) must reach a self-cleansing velocity of 0.75 m/s when flowing just full. Find the minimum slope S (in m/m).

D = 250 mmn = 0.013V = 0.75 m/s
S = m/m
23.Pumps & pump powerMedium
PQ = 25 L/sH = 68 m

A pump with an efficiency of 60% delivers 25 L/s of water (ρ = 1000 kg/m³) against a head of 68 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.

Q = 25 L/sH = 68 mη = 60%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
250 kPa (gauge)PQ = 120 L/sΔz = 9 mL = 150 m, D = 250 mm, f = 0.015, ΣK = 6

A pump moves 120 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 9 m higher. The pipe is 150 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.015; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 250 kPa. Find the head H the pump must add.

Q = 120 L/sΔz = 9 mL = 150 mD = 250 mmf = 0.015ΣK = 6ptank = 250 kPa
H = m
25.Time value of moneyMedium
periods0123…36511 + EAR = ?24% / 365

A credit card charges a nominal interest rate of 24% per year, compounded daily. Find the effective annual rate EAR in percent.

r = 24%m = 365
EAR = %
26.Time value of moneyHard
months0123…96€100€100€100FV = ?

You save €100 at the end of every month for 8 years. The account pays 2.4% per year, compounded monthly. How much have you saved at the end? Find FV.

A = €1002.4% / 12N = 96
FV = €
27.NPV & IRRMedium
years0123456−30 0008 5008 5008 5008 5008 5008 500

A project costs €30 000 today and returns €8 500 at the end of each year for 6 years. The cost of capital is 12%. Assume cash flows arrive evenly through each year. Find the discounted payback period DPB in years.

r = 12%CF0 = −30 000CF1 = 8 500CF2 = 8 500CF3 = 8 500CF4 = 8 500CF5 = 8 500CF6 = 8 500
DPB = years
28.NPV & IRRHard
years0123−25 00016 00017 00018 000

A project costs €25 000 and returns €16 000, €17 000, €18 000 at the end of years 1 to 3. Find its internal rate of return IRR in percent.

CF0 = −25 000CF1 = 16 000CF2 = 17 000CF3 = 18 000
IRR = %
29.Normal distributionMedium
−3−2−10123zshaded area between −z and z = 0.7923

Drag z so that the shaded area between −z and z under the standard normal curve is 0.7923. Find z to two decimals.

A = 0.7923
z =
30.Normal distributionHard
0.02 mm0D − d?

Hole diameters D are normal with mean 25.02 mm and standard deviation 0.01 mm. Shaft diameters d are independent and normal with mean 25 mm and standard deviation 0.01 mm. A randomly chosen shaft fits when D − d > 0. Find the probability P that it fits. Round z to two decimals.

hole: μ = 25.02 mm, σ = 0.01 mmshaft: μ = 25 mm, σ = 0.01 mm
P =

3Solutions

1.Beam support reactions

Answer: RA = 18 kN

Cantilever equilibrium: a fixed support can push up and also resist rotation, so it gives a vertical reaction RA and a reaction moment MA. ΣFy = 0 gives RA, and moments about the wall give MA = Σ(load × distance from the wall). A distributed load acts as its resultant at the centroid of the load diagram.

Resultant of the distributed load

W = 4·2 = 8 kN, x̄ = 1 m

Vertical equilibrium

RA = P + W = 10 + 8 = 18 kN

Answer

RA = 18 kN
2.Beam support reactions

Answer: RD = 26 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation. An internal hinge cannot carry a bending moment, which gives one extra equation: the moment about the hinge of the forces on either side is zero.

Part CD

The hinge has no moment, so moments about C on CD alone must balance.

ΣMC = 0: RD·5 = 65·2
RD = 26 kN
VC = 65 − 26 = 39 kN

Answer

RD = 26 kN
3.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 16.88 kN (T), BC: 26.25 kN (T), CD: 26.25 kN (T), DE: 13.12 kN (T), FG: 16.87 kN (C), GH: 13.12 kN (C), AF: 28.13 kN (C), HE: 21.87 kN (C), BF: 22.5 kN (T), CG: 0, DH: 17.5 kN (T), BG: 15.63 kN (C), DG: 21.88 kN (C)

Answer

Zero-force member: CG
4.Truss: method of joints

Answer: FAB = −32.5 kN

Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.

ABBCACACB40 kN5 kNAy​Cy​Ax​

Support reactions

Equilibrium of the whole truss. Moments about A, counter-clockwise positive.

ΣMA = 0: Cy·6 = 40·1 + 5·3 → Cy = 9.167 kN
ΣFy = 0: Ay = 40 − 9.167 = 30.83 kN
ΣFx = 0: Ax = −5 kN

Joint A

Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.

sin α = 3/3.162 = 0.9487
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −30.83/0.9487 = −32.5 kN

Answer

FAB = −32.5 kN (compression)
5.Shear force & bending moment

Answer: C (x = 4 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 11.67 kN, R2 = 13.33 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 23.33, MC = 46.67 kN·m, MD = 40, ME = 33.33, MF = 26.67, MG = 0

Answer

Mark C: MC = 46.67 kN·m
6.Shear force & bending moment

Answer: Mmax = 45.94 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 12·4 = 48 kN, acting at x̄ = 2 m
ΣMA = 0: RB·4 = 25·1.5 + 12·4·2
RB = 133.5/4 = 33.38 kN
ΣFy = 0: RA = 73 − 33.38 = 39.63 kN

Where is V = 0?

V(1.5⁻) = RA − w·1.5 = 21.63 kN
V(1.5⁺) = 21.63 − 25 = −3.375 kN
The shear changes sign at the load, so the maximum is under the load.

Maximum moment

Mmax = RA·1.5 − w·1.5²/2 = 39.63·1.5 − 12·1.5²/2 = 45.94 kN·m

Answer

Mmax = 45.94 kN·m

It occurs at x = 1.5 m from A.

7.Beam deflection

Answer: δP = 20.4 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 29000 N, a = 5500 mm, b = 2500 mm, L = 8000 mm
EI = 1.12 × 10¹³ N·mm²

Deflection under the load

δP = Pa²b²/(3EIL) = 29000·5500²·2500²/(3·1.12 × 10¹³·8000) = 20.4 mm

Answer

δP = 20.4 mm
8.Beam deflection

Answer: δmax = 17.35 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 23000 N, L = 5000 mm
EI = 5.88 × 10¹² N·mm²

One load at L/3

δ₁ = Pb(3L² − 4b²)/(48EI), b = L/3 = 1667 mm
δ₁ = 8.677 mm

Add both loads

δmax = 2·δ₁ = 23PL³/(648EI) = 17.35 mm

Answer

δmax = 17.35 mm
9.Column buckling

Answer: Pcr = 73.69 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A rectangle buckles about its weak axis, using the smaller dimension cubed.

Imin = h·b³/12 = 80·40³/12 = 426667 mm⁴

Effective length

KL = 2·1000 = 2000 mm

Critical load

Pcr = π²EI/(KL)² = π²·70000·426667/2000² = 73693 N = 73.69 kN

Answer

Pcr = 73.69 kN
10.Column buckling

Answer: d = 98.87 mm

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Required critical load

Pcr = n·P = 3·30000 = 90000 N
KL = 2·3000 = 6000 mm

Solve for the diameter

d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·90000·6000²/(π³·70000))^(1/4) = 98.87 mm

Answer

d = 98.87 mm

Check: the slenderness KL/r is 242.8, so the column is slender and Euler applies.

11.Centroid & second moment of area

Answer: Sx = 878.4 × 10³ mm³

Second moment of area: for a rectangle about its own centroidal axis I = bh³/12, and about its base bh³/3 (parallel-axis theorem I = Ic + A·d²). A hole is handled by subtracting its I, as long as both parts share the same axis. The elastic section modulus is S = I/c, where c is the distance to the extreme fibre.

Outer rectangle minus the two side cut-outs

Both cut-outs together are (B − tw) wide and hw = H − 2tf high, and share the axis x.

hw = 320 − 2·14 = 292 mm
Ix = (B·H³ − (B − tw)·hw³)/12 = (170·320³ − 156·292³)/12
Ix = 1.406 × 10⁸ mm⁴

Section modulus

c = H/2 = 160 mm
Sx = I/c = 1.406 × 10⁸/160
Sx = 878445 mm³ = 878.4 × 10³ mm³

Answer

Sx = 878.4 × 10³ mm³
12.Centroid & second moment of area

Answer: Ix = 132.6 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (40000·100 − 1600·80)/(40000 − 1600) = 100.8 mm

Full plate about ȳ

200·200³/12 + 40000·−0.8333² = 133.4 × 10⁶ mm⁴

Hole about ȳ

80·20³/12 + 1600·−20.83² = 0.7478 × 10⁶ mm⁴

Subtract

Ix = 132.6 × 10⁶ mm⁴

Answer

Ix = 132.6 × 10⁶ mm⁴
13.Effective stress in soil

Answer: u = 39.24 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·4 = 39.24 kPa

Answer

u = 39.24 kPa
14.Effective stress in soil

Answer: σ = 122.5 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·2 + γsat,sand·2 + γsat,clay·3
σ = 16·2 + 19·2 + 17.5·3 = 122.5 kPa

Answer

σ = 122.5 kPa
15.Consolidation settlement

Answer: S = 4.998 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 75 + 25 = 100 kPa ≤ 145 kPa

Settlement

The clay stays on its recompression line.

S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.02·3.5/(1 + 0.75)·log₁₀(100/75) = 4.998 mm

Answer

S = 4.998 mm
16.Consolidation settlement

Answer: t = 1.172 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H/2 = 7/2 = 3.5 m

Time

t = Tv·Hdr²/cv = 0.287·3.5²/3 = 1.172 years

Answer

t = 1.172 years
17.Hydrostatic force

Answer: F = 27.59 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 0.5 + 1.5/2 = 1.25 m
A = H·b = 1.5·1.5 = 2.25 m²
gated = 0.5 mH = 1.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·1.25·2.25 = 27.59 kN

Answer

F = 27.59 kN
18.Hydrostatic force

Answer: ycp = 2.048 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 0.5 + 2.5/2 = 1.75 m
A = H·b = 2.5·2 = 5 m²
gated = 0.5 mH = 2.5 mF

Resultant force

F = ρ·g·yc·A = 1260·9.81·1.75·5 = 108.2 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 2·2.5³/12 = 2.604 m⁴
ycp = yc + Ic/(yc·A) = 1.75 + 2.604/(1.75·5) = 2.048 m

Answer

ycp = 2.048 m
19.Pipe friction & head loss

Answer: hf = 0.2115 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Mean velocity

A = π·0.25²/4 = 0.04909 m²
V = Q/A = 0.05/0.04909 = 1.019 m/s

Velocity head

V²/(2g) = 1.019²/(2·9.81) = 0.05288 m

Darcy–Weisbach

hf = f·(L/D)·V²/(2g) = 0.02·(50/0.25)·1.019²/(2·9.81) = 0.2115 m

Answer

hf = 0.2115 m
20.Pipe friction & head loss

Answer: Δz = 7.213 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.1/0.04909 = 2.037 m/s
V²/(2g) = 0.2115 m

Loss coefficients

f·L/D = 0.015·500/0.25 = 30
ΣK = 0.5 + 2·0.3 + 2 + 1.0 = 4.1

Total head loss

hf = 30·0.2115 = 6.346 m
hm = 4.1·0.2115 = 0.8673 m
Δz = hf + hm = 7.213 m

Answer

Δz = 7.213 m
21.Open-channel flow (Manning)

Answer: Q = 4.202 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (1.5 + 1·1.1)·1.1 = 2.86 m²
P = b + 2y·√(1 + z²) = 1.5 + 2·1.1·√(1 + 1²) = 4.611 m
R = A/P = 0.6202 m

Velocity

V = (1/0.014)·0.62022/3·0.00081/2 = 1.469 m/s

Flow rate

Q = A·V = 2.86·1.469 = 4.202 m³/s

Answer

Q = 4.202 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.003833 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Hydraulic radius

R = D/4 = 0.25/4 = 0.0625 m

Solve Manning for S

S = (n·V/R2/3)² = (0.013·0.75/0.1575)² = 0.003833

Answer

S = 0.003833

That is a fall of 3.833 m per kilometre.

23.Pumps & pump power

Answer: Pshaft = 27.8 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.025·68 = 16.68 kW

Shaft power

Pshaft = Ph/η = 16.68/0.6 = 27.8 kW

Answer

Pshaft = 27.8 kW
24.Pumps & pump power

Answer: H = 39.05 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.12/0.04909 = 2.445 m/s
V²/(2g) = 0.3046 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (9 + 6)·0.3046 = 4.569 m

Pressure head

p/(ρ·g) = 250000/(1000·9.81) = 25.48 m

Pump head

Both surfaces are practically at rest, so there is no velocity head term.

H = Δz + p/(ρ·g) + hL = 9 + 25.48 + 4.569 = 39.05 m

Answer

H = 39.05 m
25.Time value of money

Answer: EAR = 27.11 %

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate per period

r/m = 0.24/365 = 0.0006575

Compound over one year

EAR = (1 + 0.0006575)365 − 1 = 1.271 − 1 = 27.11%

Answer

EAR = 27.11%

The EAR is always above the nominal rate when interest compounds more than once a year.

26.Time value of money

Answer: FV = 10572 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly rate and number of deposits

i = 0.024/12 = 0.002
N = 12·8 = 96

Future value of the deposits

FV = A·((1 + i)N − 1)/i = 100·(1.211 − 1)/0.002 = €10 571.91

Answer

FV = €10 571.91

You paid in €9 600 yourself; the rest is interest.

27.NPV & IRR

Answer: DPB = 4.867 years

Payback period: the time until the cumulative cash flows repay the initial investment. Cash is assumed to come in evenly during each year, so the last part is a fraction of a year. The simple payback ignores the time value of money; the discounted payback period uses the discounted cash flows instead.

Discounted and cumulative cash flows

year 1: 8 500/1.12 = 7 589.29 → Σ = 7 589.29
year 2: 8 500/1.254 = 6 776.15 → Σ = 14 365.43
year 3: 8 500/1.405 = 6 050.13 → Σ = 20 415.57
year 4: 8 500/1.574 = 5 401.90 → Σ = 25 817.47
year 5: 8 500/1.762 = 4 823.13 → Σ = 30 640.60

Fraction of the last year

DPB = 4 + 4 182.53/4 823.13 = 4.867

Answer

DPB = 4.867 years

The discounted payback is always longer than the simple payback (3.529 years).

28.NPV & IRR

Answer: IRR = 45.08 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(45%) = 24.40
NPV(50%) = −1 444.44

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 45 + 5·24.40/(24.40 − (−1 444.44)) = 45.08%
exact: NPV(45.08%) = 0 → IRR = 45.08%

Answer

IRR = 45.08%
29.Normal distribution

Answer: z = 1.26

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left of z

Φ(z) = (1 + 0.7923)/2 = 0.8962

Read the z-table backwards

Find 0.8962 inside the table and read off z.

z = 1.26

Answer

z = 1.26
30.Normal distribution

Answer: P = 0.9207

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the difference

μ = 25.02 − 25 = 0.02 mm, σ = 0.01414 mm

Standardise

z = (0 − 0.02)/0.01414 = −1.41

Probability

P = 1 − Φ(−1.41) = 0.9207

Answer

P = 0.9207

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.

ExamProblems · examproblems.com/courses/fe-exam-civil