FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
w = 3 kN/mP = 55 kNABRA​ = ?5 m

The cantilever beam is fixed to the wall at A. It carries a uniformly distributed load w along its whole length and a point load P at 5 m from the wall. Find the vertical reaction RA at the wall.

L = 5 mP = 55 kN at 5 mw = 3 kN/m from 0 to 5 m
RA = kN
2.Beam support reactionsHard
P = 55 kN, 60°Q = 15 kNABα = ?0.5 m3.5 m1 m

The simply supported beam has a pin at A and a roller at B. A load P acts at 4 m from A, inclined at 60° to the horizontal, and a vertical load Q acts at 0.5 m from A. Find the angle α between the total reaction force at the pin A and the horizontal.

L = 5 mP = 55 kN at 4 m, θ = 60°Q = 15 kN at 0.5 m
α = °
3.Truss: method of jointsMedium
ABCDEFGH25 kN10 kN4 × 3 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

D: 25 kN ↓G: 10 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
4.Truss: method of jointsHard
ABCDEFGH40 kN30 kN40 kN30 kN4 × 3 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 40 kN ↓C: 30 kN ↓F: 40 kN →G: 30 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
5.Shear force & bending momentMedium
10 kN45 kNABCDEFG1 m1 m1 m1 m1 m1 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

10 kN @ 3 m45 kN @ 2 m
  1. 1A (x = 0 m)
  2. 2B (x = 1 m)
  3. 3C (x = 2 m)
  4. 4D (x = 3 m)
  5. 5E (x = 4 m)
  6. 6F (x = 5 m)
  7. 7G (x = 6 m)
6.Shear force & bending momentHard
w = 12 kN/mP = 55 kNABsection3 m2 m

Find the bending moment Mx at the section x = 3 m from support A. Use sagging moments positive and upward shear on the left face positive.

L = 5 mP = 55 kN at 3 mw = 12 kN/m from 0 to 5 mx = 3 m
Mx = kN·m
7.Beam deflectionMedium
P = 6 kNABδ3.5 m4.5 m

A simply supported beam carries a point load P at a = 3.5 m from support A. Find the deflection δP under the load.

P = 6 kNa = 3.5 mL = 8 mE = 11 GPa (timber)I = 160 × 10⁶ mm⁴
δP = mm
8.Beam deflectionHard
w = 20 kN/mδL = 2 m

A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.

w = 20 kN/mL = 2 mE = 70 GPa (aluminium)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
PL = 4 m40 × 50 mmcross-section

A column of length L made of aluminium is fixed at both ends. Using Euler’s formula, find its critical buckling load Pcr.

L = 4 mE = 70 GPa (aluminium)b × h = 40 × 50 mm
Pcr = kN
10.Column bucklingHard
PL = 1.5 md = 40 mmcross-section

A column of length L made of aluminium is fixed at the base and pinned at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 1.5 mE = 70 GPa (aluminium)d = 40 mm
σcr = MPa
11.Centroid & second moment of areaMedium
100 mm150 mm60 mmØ60xIx​ = ?

A 100 mm × 150 mm plate has a circular hole of diameter 60 mm on its vertical centre line, with its centre 60 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 100 mmh = 150 mmd = 60 mmhole centre: y = 60 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
2202028010xM = 25 kN·mdimensions in mm

The T-section is used as a beam with the flange on top and carries a sagging bending moment of 25 kN·m. Find the bending stress σbottom at the bottom edge.

bf = 220 mmtf = 20 mmtw = 10 mmhw = 280 mmM = 25 kN·m
σbottom = MPa
13.Effective stress in soilMedium
sandγd​ = 16 kN/m³γsat​ = 18.5 kN/m³7 mwater tableXz = 6 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 6 mzw = 4 mγw = 9.81 kN/m³sand: γd = 16 kN/m³sand: γsat = 18.5 kN/m³
σ = kPa
14.Effective stress in soilHard
sandγd​ = 16.5 kN/m³γsat​ = 18.5 kN/m³5 mclayγsat​ = 18 kN/m³6 mwater tableXz = 8 m

For the soil profile shown, find the pore water pressure u at point X.

z = 8 mzw = 4 mγw = 9.81 kN/m³sand: γd = 16.5 kN/m³sand: γsat = 18.5 kN/m³clay: γsat = 18 kN/m³
u = kPa
15.Consolidation settlementMedium
Δσ = 80 kPasandclayCc​ = 0.25, Cr​ = 0.04e0​ = 0.6σ′0​ = 95 kPaσ′p​ = 205 kPa5 mwater table

A 5 m thick overconsolidated clay layer has Cc = 0.25, Cr = 0.04 and e₀ = 0.6. At its mid-depth the effective vertical stress is 95 kPa and the preconsolidation pressure is 205 kPa. A new building adds 80 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 5 mCc = 0.25Cr = 0.04e0 = 0.6σ′0 = 95 kPaσ′p = 205 kPaΔσ = 80 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 5 m5 msandwater table

In a laboratory oedometer test, a clay specimen 19 mm thick, drained at the top and bottom, reaches 50% consolidation in 5 min. In the field the same clay forms a layer 5 m thick. It lies between two sand layers, so water drains out at the top and the bottom. How many days t does the field layer take to reach 50% consolidation?

hlab = 19 mmtlab = 5 minH = 5 mfield: double drainage
t = days
17.Hydrostatic forceMedium
gated = 1 mH = 3 m

A vertical rectangular gate 1 m wide sits in the wall of a tank of water, with its top edge 1 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1 mH = 3 mb = 1 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 1 mH = 1 m

A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 1 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1 mH = 1 mb = 3 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
V = 1.9 m/sD = 100 mmL = 300 mf = 0.018

Water (ρ = 1000 kg/m³) flows at 1.9 m/s through a horizontal pipe, 300 m long, with an inside diameter of 100 mm. Use the Darcy friction factor f = 0.018 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 1.9 m/sL = 300 mD = 100 mmf = 0.018ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 2Δz = ?L = 300 m, D = 300 mm, f = 0.0182× bend (K = 0.3)

Two open reservoirs are joined by a pipe 300 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.018. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 2) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 80 L/s?

Q = 80 L/sL = 300 mD = 300 mmf = 0.018Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 2Kexit = 1.0
Δz = m
21.Open-channel flow (Manning)Medium
D = 750 mmn = 0.013, S = 0.004

A concrete storm sewer with an inside diameter of 750 mm flows half full. Manning n = 0.013 and the slope is S = 0.004. Find the flow rate Q in m³/s.

D = 750 mmn = 0.013S = 0.004
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 2.5 my = 1.5 mn = 0.014, Q = 15 m³/s

A rectangular unfinished concrete channel 2.5 m wide must carry 15 m³/s in uniform flow at a depth of 1.5 m. Manning n = 0.014. Find the required bed slope S (in m/m).

Q = 15 m³/sb = 2.5 my = 1.5 mn = 0.014
S = m/m
23.Pumps & pump powerMedium
PQ = 50 L/sH = 46 m

A pump with an efficiency of 72% delivers 50 L/s of water (ρ = 1000 kg/m³) against a head of 46 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.

Q = 50 L/sH = 46 mη = 72%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
PQ = 60 L/sΔz = 11 mL = 600 m, D = 200 mm, f = 0.02, ΣK = 8

A pump moves 60 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 11 m higher. The pipe is 600 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.02; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². The pump efficiency is 85%. Find the shaft power Pshaft in kW.

Q = 60 L/sΔz = 11 mL = 600 mD = 200 mmf = 0.02ΣK = 8η = 85%
Pshaft = kW
25.Time value of moneyMedium
years0123…10€1 000FV = ?

You invest €1 000 at 7% per year with continuous compounding. Find the value FV after 10 years.

PV = €1 000r = 7%t = 10
FV = €
26.Time value of moneyHard
months0123…N = ?€20 000€325€325€325€3254.2% / 12

You borrow €20 000 at 4.2% per year, compounded monthly, and repay €325 at the end of every month. How many months does it take until the loan is repaid (the last payment may be smaller)? Give the number of payments N.

P = €20 000A = €3254.2% / 12
N = payments
27.NPV & IRRMedium
years0123−100 00039 50039 50059 500

A machine costs €100 000 today. It generates €39 500 at the end of each year for 3 years and can then be sold for €20 000. The cost of capital is 6%. Find the net present value NPV.

C0 = €100 000CF = €39 500S = €20 000n = 3r = 6%
NPV = €
28.NPV & IRRHard
r (%)NPVABr* = ?0

Project A costs €10 000 and returns €6 000, €3 500, €2 000 at the end of years 1 to 3. Project B costs €12 000 and returns €3 000, €4 500, €6 500. Find the crossover rate r* at which both projects have the same NPV, in percent.

A: −10 000, 6 000, 3 500, 2 000B: −12 000, 3 000, 4 500, 6 500
r* = %
29.Normal distributionMedium
85115.75P = ?

The IQ scores are normally distributed with mean 100 points and standard deviation 15 points. What fraction lies between 85 and 115.75 points? Give P as a decimal.

μ = 100σ = 15x1 = 85x2 = 115.75
P =
30.Normal distributionHard
0.04 mm0D − d?

Hole diameters D are normal with mean 25.04 mm and standard deviation 0.02 mm. Shaft diameters d are independent and normal with mean 25 mm and standard deviation 0.01 mm. A randomly chosen shaft fits when D − d > 0. Find the probability P that it fits. Round z to two decimals.

hole: μ = 25.04 mm, σ = 0.02 mmshaft: μ = 25 mm, σ = 0.01 mm
P =

3Solutions

1.Beam support reactions

Answer: RA = 70 kN

Cantilever equilibrium: a fixed support can push up and also resist rotation, so it gives a vertical reaction RA and a reaction moment MA. ΣFy = 0 gives RA, and moments about the wall give MA = Σ(load × distance from the wall). A distributed load acts as its resultant at the centroid of the load diagram.

Resultant of the distributed load

W = 3·5 = 15 kN, x̄ = 2.5 m

Vertical equilibrium

RA = P + W = 55 + 15 = 70 kN

Answer

RA = 70 kN
2.Beam support reactions

Answer: α = 39.94 °

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Components of P

Pv = 55·sin 60° = 47.63 kN
Ph = 55·cos 60° = 27.5 kN

Reactions

ΣMA = 0: RB·5 = 47.63·4 + 15·0.5 → RB = 39.61 kN
Ay = 47.63 + 15 − 39.61 = 23.03 kN
Ax = Ph = 27.5 kN

Direction at A

α = atan(Ay/Ax) = atan(23.03/27.5) = 39.94°

Answer

α = 39.94°
3.Truss: method of joints

Answer: member BF

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint B

AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.

ΣF⊥ = 0 → FBF = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 8.438 kN (T), BC: 8.438 kN (T), CD: 17.81 kN (T), DE: 17.81 kN (T), FG: 16.88 kN (C), GH: 16.88 kN (C), AF: 14.06 kN (C), HE: 29.69 kN (C), BF: 0, CG: 10 kN (C), DH: 25 kN (T), FC: 14.06 kN (T), HC: 1.563 kN (C)

Answer

Zero-force member: BF
4.Truss: method of joints

Answer: member DH

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint D

CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.

ΣF⊥ = 0 → FDH = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 90 kN (T), BC: 90 kN (T), CD: 50 kN (T), DE: 50 kN (T), FG: 100 kN (C), GH: 100 kN (C), AF: 70.71 kN (C), HE: 70.71 kN (C), BF: 40 kN (T), CG: 30 kN (C), DH: 0, FC: 14.14 kN (T), HC: 70.71 kN (T)

Answer

Zero-force member: DH
5.Shear force & bending moment

Answer: C (x = 2 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 35 kN, R2 = 20 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 35, MC = 70 kN·m, MD = 60, ME = 40, MF = 20, MG = 0

Answer

Mark C: MC = 70 kN·m
6.Shear force & bending moment

Answer: Mx = 102 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 12·5 = 60 kN, acting at x̄ = 2.5 m
ΣMA = 0: RB·5 = 55·3 + 12·5·2.5
RB = 315/5 = 63 kN
ΣFy = 0: RA = 115 − 63 = 52 kN
w = 12 kN/mP = 55 kNABRA​ = 52RB​ = 63section3 m2 m

Cut at x = 3 m and keep the left part

Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.

M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 52·3 − 12·3·1.5 = 102 kN·m

Answer

Mx = 102 kN·m
7.Beam deflection

Answer: δP = 35.24 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 6000 N, a = 3500 mm, b = 4500 mm, L = 8000 mm
EI = 1.76 × 10¹² N·mm²

Deflection under the load

δP = Pa²b²/(3EIL) = 6000·3500²·4500²/(3·1.76 × 10¹²·8000) = 35.24 mm

Answer

δP = 35.24 mm
8.Beam deflection

Answer: Ireq = 10.71 × 10⁶ mm⁴

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Deflection limit

δallow = L/360 = 2000/360 = 5.556 mm

Required second moment of area

I = 5wL⁴/(384·E·δallow) = 5·20·2000⁴/(384·70000·5.556) = 1.071 × 10⁷ mm⁴
Ireq = 10.71 × 10⁶ mm⁴

Answer

Ireq = 10.71 × 10⁶ mm⁴
9.Column buckling

Answer: Pcr = 46.06 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A rectangle buckles about its weak axis, using the smaller dimension cubed.

Imin = h·b³/12 = 50·40³/12 = 266667 mm⁴

Effective length

KL = 0.5·4000 = 2000 mm

Critical load

Pcr = π²EI/(KL)² = π²·70000·266667/2000² = 46058 N = 46.06 kN

Answer

Pcr = 46.06 kN
10.Column buckling

Answer: σcr = 62.66 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·40⁴/64 = 125664 mm⁴

Radius of gyration and slenderness

A = 1257 mm²
r = √(I/A) = √(125664/1257) = 10 mm
KL = 0.7·1500 = 1050 mm
KL/r = 1050/10 = 105

Critical stress

σcr = π²E/(KL/r)² = π²·70000/105² = 62.66 MPa

Answer

σcr = 62.66 MPa
11.Centroid & second moment of area

Answer: Ix = 26.7 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (15000·75 − 2827·60)/(15000 − 2827) = 78.48 mm

Full plate about ȳ

100·150³/12 + 15000·−3.484² = 28.31 × 10⁶ mm⁴

Hole about ȳ

π·60⁴/64 + 2827·−18.48² = 1.602 × 10⁶ mm⁴

Subtract

Ix = 26.7 × 10⁶ mm⁴

Answer

Ix = 26.7 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: σbottom = 101.7 MPa

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 220·20 = 4400 mm², yf = 280 + 20/2 = 290 mm
web: Aw = 10·280 = 2800 mm², yw = 280/2 = 140 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (4400·290 + 2800·140)/7200 = 231.7 mm

Parallel-axis theorem

flange: 220·20³/12 + 4400·(290 − 231.7)² = 1.512 × 10⁷ mm⁴
web: 10·280³/12 + 2800·(140 − 231.7)² = 4.182 × 10⁷ mm⁴
Ix = 1.512 × 10⁷ + 4.182 × 10⁷ = 5.694 × 10⁷ mm⁴

Bending stress

The bottom edge is ȳ from the axis.

y = 231.7 mm
σ = M·y/I = 2.5 × 10⁷·231.7/5.694 × 10⁷ = 101.7 MPa

Answer

σbottom = 101.7 MPa
13.Effective stress in soil

Answer: σ = 101 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 16·4 + 18.5·2 = 101 kPa

Answer

σ = 101 kPa
14.Effective stress in soil

Answer: u = 39.24 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·4 = 39.24 kPa

Answer

u = 39.24 kPa
15.Consolidation settlement

Answer: S = 33.16 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 95 + 80 = 175 kPa ≤ 205 kPa

Settlement

The clay stays on its recompression line.

S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.04·5/(1 + 0.6)·log₁₀(175/95) = 33.16 mm

Answer

S = 33.16 mm
16.Consolidation settlement

Answer: t = 240.5 days

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage paths

Hdr,lab = 19/2 = 9.5 mm = 0.0095 m
Hdr,field = 5/2 = 2.5 m

Scale the time

t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.

tfield = 5·(2.5/0.0095)² = 346260 min
tfield = 346260/1440 = 240.5 days

Answer

t = 240.5 days
17.Hydrostatic force

Answer: F = 73.58 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1 + 3/2 = 2.5 m
A = H·b = 3·1 = 3 m²
gated = 1 mH = 3 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2.5·3 = 73.58 kN

Answer

F = 73.58 kN
18.Hydrostatic force

Answer: F = 44.15 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1 + 1/2 = 1.5 m
A = H·b = 1·3 = 3 m²
gated = 1 mH = 1 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·1.5·3 = 44.15 kN

Answer

F = 44.15 kN
19.Pipe friction & head loss

Answer: Δp = 97.47 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.018·(300/0.1)·1.9²/(2·9.81) = 9.936 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·9.936 = 97470 Pa = 97.47 kPa

Answer

Δp = 97.47 kPa
20.Pipe friction & head loss

Answer: Δz = 1.443 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.08/0.07069 = 1.132 m/s
V²/(2g) = 0.06529 m

Loss coefficients

f·L/D = 0.018·300/0.3 = 18
ΣK = 0.5 + 2·0.3 + 2 + 1.0 = 4.1

Total head loss

hf = 18·0.06529 = 1.175 m
hm = 4.1·0.06529 = 0.2677 m
Δz = hf + hm = 1.443 m

Answer

Δz = 1.443 m
21.Open-channel flow (Manning)

Answer: Q = 0.352 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = 0.2209 m², R = D/4 = 0.1875 m

Velocity

V = (1/0.013)·0.18752/3·0.0041/2 = 1.594 m/s

Flow rate

Q = A·V = 0.2209·1.594 = 0.352 m³/s

Answer

Q = 0.352 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.005226 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 2.5·1.5 = 3.75 m²
P = b + 2y = 2.5 + 2·1.5 = 5.5 m
R = A/P = 0.6818 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.014·15/(3.75·0.7747) = 0.07229
S = 0.07229² = 0.005226

Answer

S = 0.005226

That is a fall of 5.226 m per kilometre.

23.Pumps & pump power

Answer: Pshaft = 31.34 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.05·46 = 22.56 kW

Shaft power

Pshaft = Ph/η = 22.56/0.72 = 31.34 kW

Answer

Pshaft = 31.34 kW
24.Pumps & pump power

Answer: Pshaft = 16.37 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.06/0.03142 = 1.91 m/s
V²/(2g) = 0.1859 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (60 + 8)·0.1859 = 12.64 m

Pump head

H = Δz + hL = 11 + 12.64 = 23.64 m

Shaft power

Pshaft = ρ·g·Q·H/η = 1000·9.81·0.06·23.64/0.85 = 16.37 kW

Answer

Pshaft = 16.37 kW
25.Time value of money

Answer: FV = 2014 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Exponent

r·t = 0.07·10 = 0.7
e0.7 = 2.014

Future value

FV = 1 000·2.014 = €2 013.75

Answer

FV = €2 013.75
26.Time value of money

Answer: N = 70 payments

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rearrange the annuity formula

i = 0.0035
(1 + i)−N = 1 − 20 000·0.0035/325 = 0.7846

Solve with logarithms

N = −ln(0.7846)/ln(1.004) = 69.42

Round up to whole payments

69 full payments leave a small balance, which the last, smaller payment clears.

N = 70

Answer

N = 70 payments
27.NPV & IRR

Answer: NPV = 22376 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of the yearly cash flows

39 500·2.673 = 105 583.97

Present value of the salvage value

20 000/1.191 = 16 792.39

NPV

NPV = −100 000 + 105 583.97 + 16 792.39 = €22 376.36

Answer

NPV = €22 376.36
28.NPV & IRR

Answer: r* = 4.386 %

Crossover rate: the discount rate at which two projects have the same NPV. It is the IRR of the difference in their cash flows (B − A). Below it the project with the later, larger cash flows has the higher NPV; above it the other one wins.

Difference in cash flows

ΔCF0 = −12 000 − (−10 000) = −2 000
ΔCF1 = 3 000 − 6 000 = −3 000
ΔCF2 = 4 500 − 3 500 = 1 000
ΔCF3 = 6 500 − 2 000 = 4 500

IRR of the difference

NPVΔ(4%) = 40.42
NPVΔ(5%) = −62.84
r* = 4.386%

Answer

r* = 4.386%

Check: at 4.386% both NPVs are €718.22.

29.Normal distribution

Answer: P = 0.6945

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z-scores

z₁ = (85 − 100)/15 = −1
z₂ = (115.75 − 100)/15 = 1.05

Area between

P = Φ(1.05) − Φ(−1) = 0.8531 − 0.1587 = 0.6945

Answer

P = 0.6945
30.Normal distribution

Answer: P = 0.9633

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the difference

μ = 25.04 − 25 = 0.04 mm, σ = 0.02236 mm

Standardise

z = (0 − 0.04)/0.02236 = −1.79

Probability

P = 1 − Φ(−1.79) = 0.9633

Answer

P = 0.9633

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.

ExamProblems · examproblems.com/courses/fe-exam-civil