FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
w0​ = 4 kN/mP = 35 kNABRA​ = ?6 m2 m

The simply supported beam (pin at A, roller at B) carries a linearly varying load that falls from 4 kN/m at A to zero at B. A point load P also acts at 6 m from A. Find the vertical support reaction RA.

L = 8 mw0 = 4 kN/mP = 35 kN at 6 m
RA = kN
2.Beam support reactionsHard
w = 10 kN/mP = 80 kNABCRA​ = ?3 m4 m1 m2 m

The beam has a pin at A and a roller at B, 8 m from A, and overhangs B to the free end C. It carries a point load P at 7 m from A and a uniformly distributed load w from 3 m to the free end at 10 m. Find the vertical reaction RA, taking upward as positive.

AB = 8 mAC = 10 mP = 80 kN at 7 mw = 10 kN/m from 3 to 10 m
RA = kN
3.Truss: method of jointsMedium
ABCDEFGH30 kN35 kN40 kN40 kN4 × 4 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

C: 30 kN ↓D: 35 kN ↓F: 40 kN ↓G: 40 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
4.Truss: method of jointsHard
ABCDEFGH25 kN15 kN20 kN15 kN4 × 4 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 25 kN ↓F: 15 kN ↓G: 20 kN ↓H: 15 kN ←
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
5.Shear force & bending momentMedium
w = 5 kN/mABsection3 m1 m

Find the bending moment Mx at the section x = 3 m from support A. Use sagging moments positive and upward shear on the left face positive.

L = 4 mw = 5 kN/m from 0 to 4 mx = 3 m
Mx = kN·m
6.Shear force & bending momentHard
35 kN30 kNABCDEFG2 m2 m2 m2 m2 m2 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

35 kN @ 12 m30 kN @ 2 m
  1. 1A (x = 0 m)
  2. 2B (x = 2 m)
  3. 3C (x = 4 m)
  4. 4D (x = 6 m)
  5. 5E (x = 8 m)
  6. 6F (x = 10 m)
  7. 7G (x = 12 m)
7.Beam deflectionMedium
w = 8 kN/mδL = 5 m

A simply supported beam carries a uniformly distributed load w over its whole span. Find the maximum deflection δmax, at midspan.

w = 8 kN/mL = 5 mE = 200 GPa (steel)I = 8.5 × 10⁶ mm⁴
δmax = mm
8.Beam deflectionHard
P = 30 kNAB1.5 m1.5 m

A propped cantilever is fixed at A and simply supported (propped) at B. It carries a point load P at midspan. EI is constant. Find the reaction RB at the prop.

L = 3 mP = 30 kN at 1.5 m
RB = kN
9.Column bucklingMedium
PL = 6 m20 × 60 mmcross-section

A column of length L made of aluminium is fixed at both ends. Using Euler’s formula, find its critical buckling load Pcr.

L = 6 mE = 70 GPa (aluminium)b × h = 20 × 60 mm
Pcr = kN
10.Column bucklingHard
PL = 3 md = 40 mmcross-section

A column of length L made of aluminium is fixed at the base and pinned at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 3 mE = 70 GPa (aluminium)d = 40 mm
σcr = MPa
11.Centroid & second moment of areaMedium
2402018012xdimensions in mm

Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.

bf = 240 mmtf = 20 mmtw = 12 mmhw = 180 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
180152008xsagging Mdimensions in mm

A cast-iron beam has the T-section shown, with the flange on top. The allowable stresses are 30 MPa in tension and 100 MPa in compression. Find the largest sagging bending moment Mallow the beam can carry.

bf = 180 mmtf = 15 mmtw = 8 mmhw = 200 mmσt,allow = 30 MPaσc,allow = 100 MPa
Mallow = kN·m
13.Effective stress in soilMedium
sandγd​ = 15.5 kN/m³γsat​ = 18.5 kN/m³7 mwater tableXz = 4 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 4 mzw = 3 mγw = 9.81 kN/m³sand: γd = 15.5 kN/m³sand: γsat = 18.5 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 15.5 kN/m³γsat​ = 20 kN/m³4 mclayγsat​ = 17.5 kN/m³6 mwater tableXz = 7 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 7 mzw = 1 mγw = 9.81 kN/m³sand: γd = 15.5 kN/m³sand: γsat = 20 kN/m³clay: γsat = 17.5 kN/m³
σ′ = kPa
15.Consolidation settlementMedium
Δσ = 120 kPasandclayCc​ = 0.45, Cr​ = 0.05e0​ = 0.7σ′0​ = 45 kPaσ′p​ = 115 kPa4.5 mwater table

A 4.5 m thick overconsolidated clay layer has Cc = 0.45, Cr = 0.05 and e₀ = 0.7. At its mid-depth the effective vertical stress is 45 kPa and the preconsolidation pressure is 115 kPa. A new building adds 120 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 4.5 mCc = 0.45Cr = 0.05e0 = 0.7σ′0 = 45 kPaσ′p = 115 kPaΔσ = 120 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 7 mcv​ = 1.5 m²/year7 mimpervious rockwater table

A clay layer 7 m thick has a coefficient of consolidation cv = 1.5 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 70% average consolidation the time factor is Tv = 0.403. How many years t does the layer take to reach 70% consolidation?

H = 7 mcv = 1.5 m²/yearU = 70%Tv = 0.403single drainage
t = years
17.Hydrostatic forceMedium
gated = 1.5 mH = 3 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1.5 mH = 3 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 2 mH = 1.5 m

A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 2 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 2 mH = 1.5 mb = 3 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
V = 1.6 m/sD = 300 mmL = 100 mf = 0.022

Water flows at a mean velocity of 1.6 m/s through a pipe 100 m long with an inside diameter of 300 mm. Use the Darcy friction factor f = 0.022 and g = 9.81 m/s². Find the friction head loss hf.

V = 1.6 m/sL = 100 mD = 300 mmf = 0.022g = 9.81 m/s²
hf = m
20.Pipe friction & head lossHard
K = 10free outletH = ?L = 100 m, D = 200 mm, f = 0.0252× bend (K = 0.3)

A pipe 100 m long with an inside diameter of 200 mm (Darcy friction factor f = 0.025) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each) and a valve (K = 10). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 40 L/s?

Q = 40 L/sL = 100 mD = 200 mmf = 0.025Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 10
H = m
21.Open-channel flow (Manning)Medium
b = 4.5 my = 2.2 m1 : 1n = 0.014, S = 0.003

A trapezoidal unfinished concrete channel has a bottom width of 4.5 m and side slopes of 1:1 (horizontal:vertical). Water flows uniformly 2.2 m deep. Manning n = 0.014 and the bed slope is S = 0.003. Find the flow rate Q in m³/s.

b = 4.5 my = 2.2 mz = 1n = 0.014S = 0.003
Q = m³/s
22.Open-channel flow (Manning)Hard
D = 250 mmn = 0.013, V = 0.75 m/s

A concrete sewer with an inside diameter of 250 mm (Manning n = 0.013) must reach a self-cleansing velocity of 0.75 m/s when flowing just full. Find the minimum slope S (in m/m).

D = 250 mmn = 0.013V = 0.75 m/s
S = m/m
23.Pumps & pump powerMedium
PQ = 25 L/sH = 16 m

A pump delivers 25 L/s of water (ρ = 1000 kg/m³) against a head of 16 m. The pump efficiency is 80% and the electric motor driving it has an efficiency of 90%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.

Q = 25 L/sH = 16 mηpump = 80%ηmotor = 90%g = 9.81 m/s²
Pel = kW
24.Pumps & pump powerHard
100 kPa (gauge)PQ = 80 L/sΔz = 11 mL = 100 m, D = 250 mm, f = 0.02, ΣK = 6

A pump moves 80 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 11 m higher. The pipe is 100 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.02; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 100 kPa. Find the head H the pump must add.

Q = 80 L/sΔz = 11 mL = 100 mD = 250 mmf = 0.02ΣK = 6ptank = 100 kPa
H = m
25.Time value of moneyMedium
years0123…9PV = ?€10 000+1.5%+1.5%…r = 6.5%

A property is expected to earn net rent of €10 000 next year. The rent is expected to grow by 1.5% per year forever. The required return is 6.5% per year. Find the value PV of the property today.

C1 = €10 000g = 1.5%r = 6.5%
PV = €
26.Time value of moneyHard
months0123…180€200 000AAAA4.2% / 12, I = ?

A loan of €200 000 is repaid with equal monthly payments over 15 years at 4.2% per year, compounded monthly. How much interest I is paid in total over the life of the loan?

P = €200 0004.2% / 12N = 180
I = €
27.NPV & IRRMedium
years01234−75 00022 00027 00029 00021 000

An investment of €75 000 gives these cash flows at the end of years 1 to 4: €22 000, €27 000, €29 000, €21 000. The cost of capital is 9%. Find the net present value NPV.

r = 9%CF0 = −75 000CF1 = 22 000CF2 = 27 000CF3 = 29 000CF4 = 21 000
NPV = €
28.NPV & IRRHard
years012−25 00018 00010 500

A project costs €25 000 and returns €18 000, €10 500 at the end of years 1 to 2. Find its internal rate of return IRR in percent.

CF0 = −25 000CF1 = 18 000CF2 = 10 500
IRR = %
29.Normal distributionMedium
−3−2−10123zshaded area between −z and z = 0.6157

Drag z so that the shaded area between −z and z under the standard normal curve is 0.6157. Find z to two decimals.

A = 0.6157
z =
30.Normal distributionHard
0.04 mm0D − d?

Hole diameters D are normal with mean 25.04 mm and standard deviation 0.01 mm. Shaft diameters d are independent and normal with mean 25 mm and standard deviation 0.015 mm. A randomly chosen shaft fits when D − d > 0. Find the probability P that it fits. Round z to two decimals.

hole: μ = 25.04 mm, σ = 0.01 mmshaft: μ = 25 mm, σ = 0.015 mm
P =

3Solutions

1.Beam support reactions

Answer: RA = 19.42 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Resultant of the triangular load

W = ½·4·8 = 16 kN
x̄ = L/3 = 2.667 m

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·8 = 16·2.667 + 35·6
RB = 31.58 kN
RA = 51 − 31.58 = 19.42 kN

Answer

RA = 19.42 kN
2.Beam support reactions

Answer: RA = 23.13 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Resultant of the distributed load

W = 10·7 = 70 kN, x̄ = (3 + 10)/2 = 6.5 m

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·8 = 80·7 + 70·6.5
RB = 1015/8 = 126.9 kN
RA = 150 − 126.9 = 23.13 kN

Answer

RA = 23.13 kN
3.Truss: method of joints

Answer: member BF

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint B

AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.

ΣF⊥ = 0 → FBF = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 73.75 kN (T), BC: 73.75 kN (T), CD: 71.25 kN (T), DE: 71.25 kN (T), FG: 107.5 kN (C), GH: 107.5 kN (C), AF: 104.3 kN (C), HE: 100.8 kN (C), BF: 0, CG: 40 kN (C), DH: 35 kN (T), FC: 47.73 kN (T), HC: 51.27 kN (T)

Answer

Zero-force member: BF
4.Truss: method of joints

Answer: member DH

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint D

CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.

ΣF⊥ = 0 → FDH = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 42.08 kN (T), BC: 42.08 kN (T), CD: 22.92 kN (T), DE: 22.92 kN (T), FG: 60.83 kN (C), GH: 60.83 kN (C), AF: 71.35 kN (C), HE: 28.65 kN (C), BF: 25 kN (T), CG: 20 kN (C), DH: 0, FC: 4.688 kN (T), HC: 28.65 kN (T)

Answer

Zero-force member: DH
5.Shear force & bending moment

Answer: Mx = 7.5 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 5·4 = 20 kN, acting at x̄ = 2 m
ΣMA = 0: RB·4 = 5·4·2
RB = 40/4 = 10 kN
ΣFy = 0: RA = 20 − 10 = 10 kN
w = 5 kN/mABRA​ = 10RB​ = 10section3 m1 m

Cut at x = 3 m and keep the left part

Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.

M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 10·3 − 5·3·1.5 = 7.5 kN·m

Answer

Mx = 7.5 kN·m
6.Shear force & bending moment

Answer: E (x = 8 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 5 kN, R2 = 60 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 10, MC = −40, MD = −90, ME = −140 kN·m, MF = −70, MG = 0

Answer

Mark E: ME = −140 kN·m
7.Beam deflection

Answer: δmax = 38.3 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 8 N/mm, L = 5000 mm
EI = 1.7 × 10¹² N·mm²

Deflection

δmax = 5wL⁴/(384EI) = 5·8·5000⁴/(384·1.7 × 10¹²) = 38.3 mm

Answer

δmax = 38.3 mm
8.Beam deflection

Answer: RB = 9.375 kN

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).

Remove the prop

Without the prop the beam is a cantilever. Its free end would deflect under the load.

δload = P(L/2)²(3L − L/2)/(6EI) = 5PL³/(48EI)

Compatibility at the prop

The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.

RB·L³/(3EI) = 5PL³/(48EI) → RB = 5P/16 = 5·30/16 = 9.375 kN

Answer

RB = 9.375 kN
9.Column buckling

Answer: Pcr = 3.071 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A rectangle buckles about its weak axis, using the smaller dimension cubed.

Imin = h·b³/12 = 60·20³/12 = 40000 mm⁴

Effective length

KL = 0.5·6000 = 3000 mm

Critical load

Pcr = π²EI/(KL)² = π²·70000·40000/3000² = 3071 N = 3.071 kN

Answer

Pcr = 3.071 kN
10.Column buckling

Answer: σcr = 15.67 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·40⁴/64 = 125664 mm⁴

Radius of gyration and slenderness

A = 1257 mm²
r = √(I/A) = √(125664/1257) = 10 mm
KL = 0.7·3000 = 2100 mm
KL/r = 2100/10 = 210

Critical stress

σcr = π²E/(KL/r)² = π²·70000/210² = 15.67 MPa

Answer

σcr = 15.67 MPa
11.Centroid & second moment of area

Answer: Ix = 20.89 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 240·20 = 4800 mm², yf = 180 + 20/2 = 190 mm
web: Aw = 12·180 = 2160 mm², yw = 180/2 = 90 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (4800·190 + 2160·90)/6960 = 159 mm

Parallel-axis theorem

flange: 240·20³/12 + 4800·(190 − 159)² = 4.783 × 10⁶ mm⁴
web: 12·180³/12 + 2160·(90 − 159)² = 1.611 × 10⁷ mm⁴
Ix = 4.783 × 10⁶ + 1.611 × 10⁷ = 2.089 × 10⁷ mm⁴ = 20.89 × 10⁶ mm⁴

Answer

Ix = 20.89 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: Mallow = 3.044 kN·m

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Centroid

ȳ = (2700·207.5 + 1600·100)/4300 = 167.5 mm
top edge: c = 215 − 167.5 = 47.5 mm

Second moment of area

I = 180·15³/12 + 2700·40² + 8·200³/12 + 1600·67.5² = 1.699 × 10⁷ mm⁴

Moment allowed by each edge

Sagging: the top is in compression, the bottom in tension.

top edge: M = 100·1.699 × 10⁷/47.5 = 35.78 kN·m
bottom edge: M = 30·1.699 × 10⁷/167.5 = 3.044 kN·m

Governing value

Mallow = min = 3.044 kN·m (bottom edge)

Answer

Mallow = 3.044 kN·m
13.Effective stress in soil

Answer: σ′ = 55.19 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 15.5·3 + 18.5·1 = 65 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·1 = 9.81 kPa

Effective stress

σ′ = σ − u = 65 − 9.81 = 55.19 kPa

Answer

σ′ = 55.19 kPa
14.Effective stress in soil

Answer: σ′ = 69.14 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·1 + γsat,sand·3 + γsat,clay·3
σ = 15.5·1 + 20·3 + 17.5·3 = 128 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·6 = 58.86 kPa

Effective stress

σ′ = σ − u = 128 − 58.86 = 69.14 kPa

Answer

σ′ = 69.14 kPa
15.Consolidation settlement

Answer: S = 240.7 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 45 + 120 = 165 kPa > 115 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.05·4.5/(1 + 0.7)·log₁₀(115/45) + 0.45·4.5/(1 + 0.7)·log₁₀(165/115)
S = 53.93 + 186.8 = 240.7 mm

Answer

S = 240.7 mm
16.Consolidation settlement

Answer: t = 13.16 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H = 7 m

Time

t = Tv·Hdr²/cv = 0.403·7²/1.5 = 13.16 years

Answer

t = 13.16 years
17.Hydrostatic force

Answer: F = 176.6 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1.5 + 3/2 = 3 m
A = H·b = 3·2 = 6 m²
gated = 1.5 mH = 3 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·3·6 = 176.6 kN

Answer

F = 176.6 kN
18.Hydrostatic force

Answer: F = 121.4 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 2 + 1.5/2 = 2.75 m
A = H·b = 1.5·3 = 4.5 m²
gated = 2 mH = 1.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2.75·4.5 = 121.4 kN

Answer

F = 121.4 kN
19.Pipe friction & head loss

Answer: hf = 0.9568 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity head

V²/(2g) = 1.6²/(2·9.81) = 0.1305 m

Darcy–Weisbach

hf = f·(L/D)·V²/(2g) = 0.022·(100/0.3)·1.6²/(2·9.81) = 0.9568 m

Answer

hf = 0.9568 m
20.Pipe friction & head loss

Answer: H = 2.033 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.04/0.03142 = 1.273 m/s
V²/(2g) = 0.08263 m

Loss coefficients

f·L/D = 0.025·100/0.2 = 12.5
ΣK = 0.5 + 2·0.3 + 10 = 11.1

Energy equation

The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.

H = (1 + 12.5 + 11.1)·0.08263 = 2.033 m

Answer

H = 2.033 m
21.Open-channel flow (Manning)

Answer: Q = 71.3 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (4.5 + 1·2.2)·2.2 = 14.74 m²
P = b + 2y·√(1 + z²) = 4.5 + 2·2.2·√(1 + 1²) = 10.72 m
R = A/P = 1.375 m

Velocity

V = (1/0.014)·1.3752/3·0.0031/2 = 4.837 m/s

Flow rate

Q = A·V = 14.74·4.837 = 71.3 m³/s

Answer

Q = 71.3 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.003833 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Hydraulic radius

R = D/4 = 0.25/4 = 0.0625 m

Solve Manning for S

S = (n·V/R2/3)² = (0.013·0.75/0.1575)² = 0.003833

Answer

S = 0.003833

That is a fall of 3.833 m per kilometre.

23.Pumps & pump power

Answer: Pel = 5.45 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.025·16 = 3.924 kW

Shaft power

Pshaft = 3.924/0.8 = 4.905 kW

Electrical power

Pel = 4.905/0.9 = 5.45 kW

Answer

Pel = 5.45 kW
24.Pumps & pump power

Answer: H = 23.09 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.08/0.04909 = 1.63 m/s
V²/(2g) = 0.1354 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (8 + 6)·0.1354 = 1.895 m

Pressure head

p/(ρ·g) = 100000/(1000·9.81) = 10.19 m

Pump head

Both surfaces are practically at rest, so there is no velocity head term.

H = Δz + p/(ρ·g) + hL = 11 + 10.19 + 1.895 = 23.09 m

Answer

H = 23.09 m
25.Time value of money

Answer: PV = 200000 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Growing perpetuity

PV = C1/(r − g) = 10 000/(0.065 − 0.015) = 10 000/0.05 = €200 000.00

Answer

PV = €200 000.00
26.Time value of money

Answer: I = 69910 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly payment

i = 0.0035, N = 180
A = 200 000·0.0035/(1 − (1 + 0.0035)−180) = €1 499.50

Total interest

I = N·A − P = 180·1500 − 200 000 = €69 910.12

Answer

I = €69 910.12
27.NPV & IRR

Answer: NPV = 5179 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of each cash flow

CF0 = −75 000
CF1/(1 + 0.09)1 = 22 000/1.09 = 20 183.49
CF2/(1 + 0.09)2 = 27 000/1.188 = 22 725.36
CF3/(1 + 0.09)3 = 29 000/1.295 = 22 393.32
CF4/(1 + 0.09)4 = 21 000/1.412 = 14 876.93

Add them up

NPV = €5 179.10

Answer

NPV = €5 179.10

NPV is positive, so the project earns more than the required return.

28.NPV & IRR

Answer: IRR = 10.14 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(10%) = 41.32
NPV(15%) = −1 408.32

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 10 + 5·41.32/(41.32 − (−1 408.32)) = 10.14%
exact: NPV(10.14%) = 0 → IRR = 10.14%

Answer

IRR = 10.14%
29.Normal distribution

Answer: z = 0.87

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left of z

Φ(z) = (1 + 0.6157)/2 = 0.8078

Read the z-table backwards

Find 0.8078 inside the table and read off z.

z = 0.87

Answer

z = 0.87
30.Normal distribution

Answer: P = 0.9868

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the difference

μ = 25.04 − 25 = 0.04 mm, σ = 0.01803 mm

Standardise

z = (0 − 0.04)/0.01803 = −2.22

Probability

P = 1 − Φ(−2.22) = 0.9868

Answer

P = 0.9868

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.

ExamProblems · examproblems.com/courses/fe-exam-civil