laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam (pin at A, roller at B) carries a linearly varying load that falls from 4 kN/m at A to zero at B. A point load P also acts at 6 m from A. Find the vertical support reaction RA.
L = 8 mw0 = 4 kN/mP = 35 kN at 6 m
RA = kN
2.Beam support reactionsHard
The beam has a pin at A and a roller at B, 8 m from A, and overhangs B to the free end C. It carries a point load P at 7 m from A and a uniformly distributed load w from 3 m to the free end at 10 m. Find the vertical reaction RA, taking upward as positive.
AB = 8 mAC = 10 mP = 80 kN at 7 mw = 10 kN/m from 3 to 10 m
RA = kN
3.Truss: method of jointsMedium
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
C: 30 kN ↓D: 35 kN ↓F: 40 kN ↓G: 40 kN ↓
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member FC
13member HC
4.Truss: method of jointsHard
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
B: 25 kN ↓F: 15 kN ↓G: 20 kN ↓H: 15 kN ←
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member FC
13member HC
5.Shear force & bending momentMedium
Find the bending moment Mx at the section x = 3 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 4 mw = 5 kN/m from 0 to 4 mx = 3 m
Mx = kN·m
6.Shear force & bending momentHard
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
35 kN @ 12 m30 kN @ 2 m
1A (x = 0 m)
2B (x = 2 m)
3C (x = 4 m)
4D (x = 6 m)
5E (x = 8 m)
6F (x = 10 m)
7G (x = 12 m)
7.Beam deflectionMedium
A simply supported beam carries a uniformly distributed load w over its whole span. Find the maximum deflection δmax, at midspan.
w = 8 kN/mL = 5 mE = 200 GPa (steel)I = 8.5 × 10⁶ mm⁴
δmax = mm
8.Beam deflectionHard
A propped cantilever is fixed at A and simply supported (propped) at B. It carries a point load P at midspan. EI is constant. Find the reaction RB at the prop.
L = 3 mP = 30 kN at 1.5 m
RB = kN
9.Column bucklingMedium
A column of length L made of aluminium is fixed at both ends. Using Euler’s formula, find its critical buckling load Pcr.
L = 6 mE = 70 GPa (aluminium)b × h = 20 × 60 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of aluminium is fixed at the base and pinned at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 3 mE = 70 GPa (aluminium)d = 40 mm
σcr = MPa
11.Centroid & second moment of areaMedium
Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.
bf = 240 mmtf = 20 mmtw = 12 mmhw = 180 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A cast-iron beam has the T-section shown, with the flange on top. The allowable stresses are 30 MPa in tension and 100 MPa in compression. Find the largest sagging bending moment Mallow the beam can carry.
A 4.5 m thick overconsolidated clay layer has Cc = 0.45, Cr = 0.05 and e₀ = 0.7. At its mid-depth the effective vertical stress is 45 kPa and the preconsolidation pressure is 115 kPa. A new building adds 120 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 7 m thick has a coefficient of consolidation cv = 1.5 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 70% average consolidation the time factor is Tv = 0.403. How many years t does the layer take to reach 70% consolidation?
A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 2 m below the surface. Find the resultant hydrostatic force F on the gate.
Water flows at a mean velocity of 1.6 m/s through a pipe 100 m long with an inside diameter of 300 mm. Use the Darcy friction factor f = 0.022 and g = 9.81 m/s². Find the friction head loss hf.
A pipe 100 m long with an inside diameter of 200 mm (Darcy friction factor f = 0.025) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each) and a valve (K = 10). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 40 L/s?
A trapezoidal unfinished concrete channel has a bottom width of 4.5 m and side slopes of 1:1 (horizontal:vertical). Water flows uniformly 2.2 m deep. Manning n = 0.014 and the bed slope is S = 0.003. Find the flow rate Q in m³/s.
b = 4.5 my = 2.2 mz = 1n = 0.014S = 0.003
Q = m³/s
22.Open-channel flow (Manning)Hard
A concrete sewer with an inside diameter of 250 mm (Manning n = 0.013) must reach a self-cleansing velocity of 0.75 m/s when flowing just full. Find the minimum slope S (in m/m).
D = 250 mmn = 0.013V = 0.75 m/s
S = m/m
23.Pumps & pump powerMedium
A pump delivers 25 L/s of water (ρ = 1000 kg/m³) against a head of 16 m. The pump efficiency is 80% and the electric motor driving it has an efficiency of 90%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.
A pump moves 80 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 11 m higher. The pipe is 100 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.02; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 100 kPa. Find the head H the pump must add.
A property is expected to earn net rent of €10 000 next year. The rent is expected to grow by 1.5% per year forever. The required return is 6.5% per year. Find the value PV of the property today.
C1 = €10 000g = 1.5%r = 6.5%
PV = €
26.Time value of moneyHard
A loan of €200 000 is repaid with equal monthly payments over 15 years at 4.2% per year, compounded monthly. How much interest I is paid in total over the life of the loan?
P = €200 0004.2% / 12N = 180
I = €
27.NPV & IRRMedium
An investment of €75 000 gives these cash flows at the end of years 1 to 4: €22 000, €27 000, €29 000, €21 000. The cost of capital is 9%. Find the net present value NPV.
A project costs €25 000 and returns €18 000, €10 500 at the end of years 1 to 2. Find its internal rate of return IRR in percent.
CF0 = −25 000CF1 = 18 000CF2 = 10 500
IRR = %
29.Normal distributionMedium
Drag z so that the shaded area between −z and z under the standard normal curve is 0.6157. Find z to two decimals.
A = 0.6157
z =
30.Normal distributionHard
Hole diameters D are normal with mean 25.04 mm and standard deviation 0.01 mm. Shaft diameters d are independent and normal with mean 25 mm and standard deviation 0.015 mm. A randomly chosen shaft fits when D − d > 0. Find the probability P that it fits. Round z to two decimals.
hole: μ = 25.04 mm, σ = 0.01 mmshaft: μ = 25 mm, σ = 0.015 mm
P =
3Solutions
1.Beam support reactions
Answer: RA = 19.42 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Resultant of the triangular load
W = ½·4·8 = 16 kN
x̄ = L/3 = 2.667 m
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·8 = 16·2.667 + 35·6
RB = 31.58 kN
RA = 51 − 31.58 = 19.42 kN
Answer
RA = 19.42 kN
2.Beam support reactions
Answer: RA = 23.13 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Resultant of the distributed load
W = 10·7 = 70 kN, x̄ = (3 + 10)/2 = 6.5 m
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·8 = 80·7 + 70·6.5
RB = 1015/8 = 126.9 kN
RA = 150 − 126.9 = 23.13 kN
Answer
RA = 23.13 kN
3.Truss: method of joints
Answer: member BF
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint B
AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.
ΣF⊥ = 0 → FBF = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint D
CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.
ΣF⊥ = 0 → FDH = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 5·4 = 20 kN, acting at x̄ = 2 m
ΣMA = 0: RB·4 = 5·4·2
RB = 40/4 = 10 kN
ΣFy = 0: RA = 20 − 10 = 10 kN
Cut at x = 3 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 10·3 − 5·3·1.5 = 7.5 kN·m
Answer
Mx = 7.5 kN·m
6.Shear force & bending moment
Answer: E (x = 8 m)
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 5 kN, R2 = 60 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = 10, MC = −40, MD = −90, ME = −140 kN·m, MF = −70, MG = 0
Answer
Mark E: ME = −140 kN·m
7.Beam deflection
Answer: δmax = 38.3 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
w = 8 N/mm, L = 5000 mm
EI = 1.7 × 10¹² N·mm²
Deflection
δmax = 5wL⁴/(384EI) = 5·8·5000⁴/(384·1.7 × 10¹²) = 38.3 mm
Answer
δmax = 38.3 mm
8.Beam deflection
Answer: RB = 9.375 kN
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).
Remove the prop
Without the prop the beam is a cantilever. Its free end would deflect under the load.
δload = P(L/2)²(3L − L/2)/(6EI) = 5PL³/(48EI)
Compatibility at the prop
The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·40⁴/64 = 125664 mm⁴
Radius of gyration and slenderness
A = 1257 mm²
r = √(I/A) = √(125664/1257) = 10 mm
KL = 0.7·3000 = 2100 mm
KL/r = 2100/10 = 210
Critical stress
σcr = π²E/(KL/r)² = π²·70000/210² = 15.67 MPa
Answer
σcr = 15.67 MPa
11.Centroid & second moment of area
Answer: Ix = 20.89 × 10⁶ mm⁴
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 240·20 = 4800 mm², yf = 180 + 20/2 = 190 mm
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Sagging: the top is in compression, the bottom in tension.
top edge: M = 100·1.699 × 10⁷/47.5 = 35.78 kN·m
bottom edge: M = 30·1.699 × 10⁷/167.5 = 3.044 kN·m
Governing value
Mallow = min = 3.044 kN·m (bottom edge)
Answer
Mallow = 3.044 kN·m
13.Effective stress in soil
Answer: σ′ = 55.19 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·1 = 9.81 kPa
Effective stress
σ′ = σ − u = 65 − 9.81 = 55.19 kPa
Answer
σ′ = 55.19 kPa
14.Effective stress in soil
Answer: σ′ = 69.14 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·1 + γsat,sand·3 + γsat,clay·3
σ = 15.5·1 + 20·3 + 17.5·3 = 128 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·6 = 58.86 kPa
Effective stress
σ′ = σ − u = 128 − 58.86 = 69.14 kPa
Answer
σ′ = 69.14 kPa
15.Consolidation settlement
Answer: S = 240.7 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 45 + 120 = 165 kPa > 115 kPa
Settlement
Recompression up to σ′p, virgin compression beyond it.
S = 0.05·4.5/(1 + 0.7)·log₁₀(115/45) + 0.45·4.5/(1 + 0.7)·log₁₀(165/115)
S = 53.93 + 186.8 = 240.7 mm
Answer
S = 240.7 mm
16.Consolidation settlement
Answer: t = 13.16 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H = 7 m
Time
t = Tv·Hdr²/cv = 0.403·7²/1.5 = 13.16 years
Answer
t = 13.16 years
17.Hydrostatic force
Answer: F = 176.6 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1.5 + 3/2 = 3 m
A = H·b = 3·2 = 6 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3·6 = 176.6 kN
Answer
F = 176.6 kN
18.Hydrostatic force
Answer: F = 121.4 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 2 + 1.5/2 = 2.75 m
A = H·b = 1.5·3 = 4.5 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·2.75·4.5 = 121.4 kN
Answer
F = 121.4 kN
19.Pipe friction & head loss
Answer: hf = 0.9568 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity head
V²/(2g) = 1.6²/(2·9.81) = 0.1305 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.022·(100/0.3)·1.6²/(2·9.81) = 0.9568 m
Answer
hf = 0.9568 m
20.Pipe friction & head loss
Answer: H = 2.033 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.04/0.03142 = 1.273 m/s
V²/(2g) = 0.08263 m
Loss coefficients
f·L/D = 0.025·100/0.2 = 12.5
ΣK = 0.5 + 2·0.3 + 10 = 11.1
Energy equation
The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.
H = (1 + 12.5 + 11.1)·0.08263 = 2.033 m
Answer
H = 2.033 m
21.Open-channel flow (Manning)
Answer: Q = 71.3 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (4.5 + 1·2.2)·2.2 = 14.74 m²
P = b + 2y·√(1 + z²) = 4.5 + 2·2.2·√(1 + 1²) = 10.72 m
R = A/P = 1.375 m
Velocity
V = (1/0.014)·1.3752/3·0.0031/2 = 4.837 m/s
Flow rate
Q = A·V = 14.74·4.837 = 71.3 m³/s
Answer
Q = 71.3 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.003833 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Hydraulic radius
R = D/4 = 0.25/4 = 0.0625 m
Solve Manning for S
S = (n·V/R2/3)² = (0.013·0.75/0.1575)² = 0.003833
Answer
S = 0.003833
That is a fall of 3.833 m per kilometre.
23.Pumps & pump power
Answer: Pel = 5.45 kW
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.025·16 = 3.924 kW
Shaft power
Pshaft = 3.924/0.8 = 4.905 kW
Electrical power
Pel = 4.905/0.9 = 5.45 kW
Answer
Pel = 5.45 kW
24.Pumps & pump power
Answer: H = 23.09 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are practically at rest, so there is no velocity head term.
H = Δz + p/(ρ·g) + hL = 11 + 10.19 + 1.895 = 23.09 m
Answer
H = 23.09 m
25.Time value of money
Answer: PV = 200000 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −75 000
CF1/(1 + 0.09)1 = 22 000/1.09 = 20 183.49
CF2/(1 + 0.09)2 = 27 000/1.188 = 22 725.36
CF3/(1 + 0.09)3 = 29 000/1.295 = 22 393.32
CF4/(1 + 0.09)4 = 21 000/1.412 = 14 876.93
Add them up
NPV = €5 179.10
Answer
NPV = €5 179.10
NPV is positive, so the project earns more than the required return.
28.NPV & IRR
Answer: IRR = 10.14 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(10%) = 41.32
NPV(15%) = −1 408.32
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
IRR ≈ 10 + 5·41.32/(41.32 − (−1 408.32)) = 10.14%
exact: NPV(10.14%) = 0 → IRR = 10.14%
Answer
IRR = 10.14%
29.Normal distribution
Answer: z = 0.87
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left of z
Φ(z) = (1 + 0.6157)/2 = 0.8078
Read the z-table backwards
Find 0.8078 inside the table and read off z.
z = 0.87
Answer
z = 0.87
30.Normal distribution
Answer: P = 0.9868
Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).
Distribution of the difference
μ = 25.04 − 25 = 0.04 mm, σ = 0.01803 mm
Standardise
z = (0 − 0.04)/0.01803 = −2.22
Probability
P = 1 − Φ(−2.22) = 0.9868
Answer
P = 0.9868
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.