FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 50 kNP2​ = 60 kNABCRB​ = ?5 m1 m4 m

The beam has a pin at A and a roller at B, 6 m from A, and overhangs B to the free end C. Find the vertical reaction RB, taking upward as positive.

AB = 6 mAC = 10 mP1 = 50 kN at 5 mP2 = 60 kN at 10 m
RB = kN
2.Beam support reactionsHard
w = 2 kN/mP = 75 kNABCRA​ = ?1.5 m3 m1.5 m

The beam has a pin at A and a roller at B, 4.5 m from A, and overhangs B to the free end C. It carries a point load P at 1.5 m from A and a uniformly distributed load w from 4.5 m to the free end at 6 m. Find the vertical reaction RA, taking upward as positive.

AB = 4.5 mAC = 6 mP = 75 kN at 1.5 mw = 2 kN/m from 4.5 to 6 m
RA = kN
3.Truss: method of jointsMedium
ABCDEFGH15 kN15 kN30 kN4 × 3 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 15 kN ↓F: 15 kN ↓G: 30 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
4.Truss: method of jointsHard
ABBCACACB25 kN30 kN6 m5 m3 m

Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.

span = 6 mheight = 3 mB is 5 m from Avertical load = 25 kNhorizontal load = 30 kN ←
FAB = kN
5.Shear force & bending momentMedium
w = 4 kN/mABsection4 m4 m

Find the bending moment Mx at the section x = 4 m from support A. Use sagging moments positive and upward shear on the left face positive.

L = 8 mw = 4 kN/m from 0 to 8 mx = 4 m
Mx = kN·m
6.Shear force & bending momentHard
12 kN/m35 kN10 kN25 kNABCDEFG1 m1 m1 m1 m1 m1 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

35 kN @ 0 m10 kN @ 6 m25 kN @ 2 m12 kN/m, 1–4 m
  1. 1A (x = 0 m)
  2. 2B (x = 1 m)
  3. 3C (x = 2 m)
  4. 4D (x = 3 m)
  5. 5E (x = 4 m)
  6. 6F (x = 5 m)
  7. 7G (x = 6 m)
7.Beam deflectionMedium
P = 17 kNABδ0.5 m1.5 m

A cantilever of length L is fixed at A and carries a point load P at a distance a = 0.5 m from A. Find the deflection δB at the free end B.

P = 17 kNa = 0.5 mL = 2 mE = 70 GPa (aluminium)I = 23 × 10⁶ mm⁴
δB = mm
8.Beam deflectionHard
w = 6 kN/mδL = 6 m

A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.

w = 6 kN/mL = 6 mE = 70 GPa (aluminium)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
PL = 1 m20 × 80 mmcross-section

A column of length L made of steel is pinned at both ends. Using Euler’s formula, find its critical buckling load Pcr.

L = 1 mE = 200 GPa (steel)b × h = 20 × 80 mm
Pcr = kN
10.Column bucklingHard
PL = 1 md = 25 mmcross-section

A column of length L made of steel is fixed at the base and pinned at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 1 mE = 200 GPa (steel)d = 25 mm
σcr = MPa
11.Centroid & second moment of areaMedium
150 mm300 mm120 mmØ30xIx​ = ?

A 150 mm × 300 mm plate has a circular hole of diameter 30 mm on its vertical centre line, with its centre 120 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 150 mmh = 300 mmd = 30 mmhole centre: y = 120 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
1603018014xM = 20 kN·mdimensions in mm

The T-section is used as a beam with the flange on top and carries a sagging bending moment of 20 kN·m. Find the bending stress σbottom at the bottom edge.

bf = 160 mmtf = 30 mmtw = 14 mmhw = 180 mmM = 20 kN·m
σbottom = MPa
13.Effective stress in soilMedium
sandγd​ = 16.5 kN/m³γsat​ = 20.5 kN/m³8 mwater tableXz = 5 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 5 mzw = 2 mγw = 9.81 kN/m³sand: γd = 16.5 kN/m³sand: γsat = 20.5 kN/m³
σ = kPa
14.Effective stress in soilHard
sandγd​ = 16.5 kN/m³γsat​ = 20 kN/m³5 mclayγsat​ = 18 kN/m³8 mwater tableXz = 9 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 9 mzw = 3 mγw = 9.81 kN/m³sand: γd = 16.5 kN/m³sand: γsat = 20 kN/m³clay: γsat = 18 kN/m³
σ = kPa
15.Consolidation settlementMedium
Δσ = 70 kPasandclayCc​ = 0.3, Cr​ = 0.04e0​ = 1.1σ′0​ = 85 kPaσ′p​ = 145 kPa2 mwater table

A 2 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.04 and e₀ = 1.1. At its mid-depth the effective vertical stress is 85 kPa and the preconsolidation pressure is 145 kPa. A new building adds 70 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 2 mCc = 0.3Cr = 0.04e0 = 1.1σ′0 = 85 kPaσ′p = 145 kPaΔσ = 70 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 3 m3 msandwater table

In a laboratory oedometer test, a clay specimen 20 mm thick, drained at the top and bottom, reaches 50% consolidation in 10 min. In the field the same clay forms a layer 3 m thick. It lies between two sand layers, so water drains out at the top and the bottom. How many days t does the field layer take to reach 50% consolidation?

hlab = 20 mmtlab = 10 minH = 3 mfield: double drainage
t = days
17.Hydrostatic forceMedium
gated = 3 mH = 1.5 m

A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 3 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 3 mH = 1.5 mb = 3 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 4 mH = 3 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 4 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 4 mH = 3 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
V = 1.5 m/sD = 300 mmL = 800 mf = 0.018

Water (ρ = 1000 kg/m³) flows at 1.5 m/s through a horizontal pipe, 800 m long, with an inside diameter of 300 mm. Use the Darcy friction factor f = 0.018 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 1.5 m/sL = 800 mD = 300 mmf = 0.018ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 10free outletH = ?L = 300 m, D = 200 mm, f = 0.0153× bend (K = 0.3)

A pipe 300 m long with an inside diameter of 200 mm (Darcy friction factor f = 0.015) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each) and a valve (K = 10). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 60 L/s?

Q = 60 L/sL = 300 mD = 200 mmf = 0.015Kentrance = 0.5Kbend = 0.3 (×3)Kvalve = 10
H = m
21.Open-channel flow (Manning)Medium
b = 4.5 my = 2.3 m1.5 : 1n = 0.015, S = 0.003

A trapezoidal brickwork channel has a bottom width of 4.5 m and side slopes of 1.5:1 (horizontal:vertical). Water flows uniformly 2.3 m deep. Manning n = 0.015 and the bed slope is S = 0.003. Find the flow rate Q in m³/s.

b = 4.5 my = 2.3 mz = 1.5n = 0.015S = 0.003
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 4 my = 1.6 mn = 0.015, Q = 15 m³/s

A rectangular brickwork channel 4 m wide must carry 15 m³/s in uniform flow at a depth of 1.6 m. Manning n = 0.015. Find the required bed slope S (in m/m).

Q = 15 m³/sb = 4 my = 1.6 mn = 0.015
S = m/m
23.Pumps & pump powerMedium
PQ = 15 L/sH = 16 m

A pump with an efficiency of 60% delivers 15 L/s of water (ρ = 1000 kg/m³) against a head of 16 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.

Q = 15 L/sH = 16 mη = 60%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
100 kPa (gauge)PQ = 20 L/sΔz = 14 mL = 300 m, D = 100 mm, f = 0.025, ΣK = 8

A pump moves 20 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 14 m higher. The pipe is 300 m long with an inside diameter of 100 mm and a Darcy friction factor f = 0.025; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 100 kPa. Find the head H the pump must add.

Q = 20 L/sΔz = 14 mL = 300 mD = 100 mmf = 0.025ΣK = 8ptank = 100 kPa
H = m
25.Time value of moneyMedium
years0123…8PV = ?€2 000€2 000€2 000€2 000

An annuity pays €2 000 at the end of each year for 8 years. The interest rate is 7% per year. Find the present value PV of the annuity.

A = €2 000i = 7%n = 8
PV = €
26.Time value of moneyHard
months0123…84€30 000AAAA3.6% / 12, I = ?

A loan of €30 000 is repaid with equal monthly payments over 7 years at 3.6% per year, compounded monthly. How much interest I is paid in total over the life of the loan?

P = €30 0003.6% / 12N = 84
I = €
27.NPV & IRRMedium
years01234−20 0005 00010 0007 0006 000

An investment of €20 000 gives these cash flows at the end of years 1 to 4: €5 000, €10 000, €7 000, €6 000. The cost of capital is 8%. Find the net present value NPV.

r = 8%CF0 = −20 000CF1 = 5 000CF2 = 10 000CF3 = 7 000CF4 = 6 000
NPV = €
28.NPV & IRRHard
years0123−50 00024 00020 50022 500

A project costs €50 000 and returns €24 000, €20 500, €22 500 at the end of years 1 to 3. Cash flows can be reinvested at the cost of capital of 12%. Find the modified internal rate of return MIRR in percent.

r = 12%CF0 = −50 000CF1 = 24 000CF2 = 20 500CF3 = 22 500
MIRR = %
29.Normal distributionMedium
440562P = ?

The battery lifetimes are normally distributed with mean 500 h and standard deviation 40 h. What fraction lies between 440 and 562 h? Give P as a decimal.

μ = 500σ = 40x1 = 440x2 = 562
P =
30.Normal distributionHard
0.03 mm0D − d?

Hole diameters D are normal with mean 25.03 mm and standard deviation 0.02 mm. Shaft diameters d are independent and normal with mean 25 mm and standard deviation 0.02 mm. A randomly chosen shaft fits when D − d > 0. Find the probability P that it fits. Round z to two decimals.

hole: μ = 25.03 mm, σ = 0.02 mmshaft: μ = 25 mm, σ = 0.02 mm
P =

3Solutions

1.Beam support reactions

Answer: RB = 141.7 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Moments about A

Counter-clockwise positive.

ΣMA = 0: RB·6 = 50·5 + 60·10
RB = 850/6 = 141.7 kN

Vertical equilibrium

RA = 50 + 60 − 141.7 = −31.67 kN

Answer

RB = 141.7 kN

RA is negative: the pin at A has to hold the beam down.

2.Beam support reactions

Answer: RA = 49.5 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Resultant of the distributed load

W = 2·1.5 = 3 kN, x̄ = (4.5 + 6)/2 = 5.25 m

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·4.5 = 75·1.5 + 3·5.25
RB = 128.3/4.5 = 28.5 kN
RA = 78 − 28.5 = 49.5 kN

Answer

RA = 49.5 kN
3.Truss: method of joints

Answer: member DH

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint D

CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.

ΣF⊥ = 0 → FDH = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 28.13 kN (T), BC: 28.13 kN (T), CD: 16.87 kN (T), DE: 16.87 kN (T), FG: 33.75 kN (C), GH: 33.75 kN (C), AF: 46.88 kN (C), HE: 28.12 kN (C), BF: 15 kN (T), CG: 30 kN (C), DH: 0, FC: 9.375 kN (T), HC: 28.13 kN (T)

Answer

Zero-force member: DH
4.Truss: method of joints

Answer: FAB = −37.25 kN

Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.

ABBCACACB25 kN30 kNAy​Cy​Ax​

Support reactions

Equilibrium of the whole truss. Moments about A, counter-clockwise positive.

ΣMA = 0: Cy·6 = 25·5 − 30·3 → Cy = 5.833 kN
ΣFy = 0: Ay = 25 − 5.833 = 19.17 kN
ΣFx = 0: Ax = 30 kN

Joint A

Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.

sin α = 3/5.831 = 0.5145
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −19.17/0.5145 = −37.25 kN

Answer

FAB = −37.25 kN (compression)
5.Shear force & bending moment

Answer: Mx = 32 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 4·8 = 32 kN, acting at x̄ = 4 m
ΣMA = 0: RB·8 = 4·8·4
RB = 128/8 = 16 kN
ΣFy = 0: RA = 32 − 16 = 16 kN
w = 4 kN/mABRA​ = 16RB​ = 16section4 m4 m

Cut at x = 4 m and keep the left part

Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.

M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 16·4 − 4·4·2 = 32 kN·m

Answer

Mx = 32 kN·m
6.Shear force & bending moment

Answer: B (x = 1 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 74.67 kN, R2 = 31.33 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = −35 kN·m, MC = −1.333, MD = −4.667, ME = −20, MF = −10, MG = 0

Answer

Mark B: MB = −35 kN·m
7.Beam deflection

Answer: δB = 2.42 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 17000 N, a = 500 mm, L = 2000 mm
EI = 1.61 × 10¹² N·mm²

Deflection at the free end

Deflection at the load plus the slope at the load times the remaining length.

δP = Pa³/(3EI) = 0.44 mm
θP = Pa²/(2EI) = 0.00132 rad
δB = δP + θP·(L − a) = Pa²(3L − a)/(6EI) = 2.42 mm

Answer

δB = 2.42 mm
8.Beam deflection

Answer: Ireq = 86.79 × 10⁶ mm⁴

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Deflection limit

δallow = L/360 = 6000/360 = 16.67 mm

Required second moment of area

I = 5wL⁴/(384·E·δallow) = 5·6·6000⁴/(384·70000·16.67) = 8.679 × 10⁷ mm⁴
Ireq = 86.79 × 10⁶ mm⁴

Answer

Ireq = 86.79 × 10⁶ mm⁴
9.Column buckling

Answer: Pcr = 105.3 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A rectangle buckles about its weak axis, using the smaller dimension cubed.

Imin = h·b³/12 = 80·20³/12 = 53333 mm⁴

Effective length

KL = 1·1000 = 1000 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·53333/1000² = 105276 N = 105.3 kN

Answer

Pcr = 105.3 kN
10.Column buckling

Answer: σcr = 157.4 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·25⁴/64 = 19175 mm⁴

Radius of gyration and slenderness

A = 490.9 mm²
r = √(I/A) = √(19175/490.9) = 6.25 mm
KL = 0.7·1000 = 700 mm
KL/r = 700/6.25 = 112

Critical stress

σcr = π²E/(KL/r)² = π²·200000/112² = 157.4 MPa

Answer

σcr = 157.4 MPa
11.Centroid & second moment of area

Answer: Ix = 336.8 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (45000·150 − 706.9·120)/(45000 − 706.9) = 150.5 mm

Full plate about ȳ

150·300³/12 + 45000·−0.4788² = 337.5 × 10⁶ mm⁴

Hole about ȳ

π·30⁴/64 + 706.9·−30.48² = 0.6964 × 10⁶ mm⁴

Subtract

Ix = 336.8 × 10⁶ mm⁴

Answer

Ix = 336.8 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: σbottom = 125.2 MPa

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 160·30 = 4800 mm², yf = 180 + 30/2 = 195 mm
web: Aw = 14·180 = 2520 mm², yw = 180/2 = 90 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (4800·195 + 2520·90)/7320 = 158.9 mm

Parallel-axis theorem

flange: 160·30³/12 + 4800·(195 − 158.9)² = 6.632 × 10⁶ mm⁴
web: 14·180³/12 + 2520·(90 − 158.9)² = 1.875 × 10⁷ mm⁴
Ix = 6.632 × 10⁶ + 1.875 × 10⁷ = 2.538 × 10⁷ mm⁴

Bending stress

The bottom edge is ȳ from the axis.

y = 158.9 mm
σ = M·y/I = 2 × 10⁷·158.9/2.538 × 10⁷ = 125.2 MPa

Answer

σbottom = 125.2 MPa
13.Effective stress in soil

Answer: σ = 94.5 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 16.5·2 + 20.5·3 = 94.5 kPa

Answer

σ = 94.5 kPa
14.Effective stress in soil

Answer: σ = 161.5 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·3 + γsat,sand·2 + γsat,clay·4
σ = 16.5·3 + 20·2 + 18·4 = 161.5 kPa

Answer

σ = 161.5 kPa
15.Consolidation settlement

Answer: S = 17.11 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 85 + 70 = 155 kPa > 145 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.04·2/(1 + 1.1)·log₁₀(145/85) + 0.3·2/(1 + 1.1)·log₁₀(155/145)
S = 8.836 + 8.275 = 17.11 mm

Answer

S = 17.11 mm
16.Consolidation settlement

Answer: t = 156.3 days

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage paths

Hdr,lab = 20/2 = 10 mm = 0.01 m
Hdr,field = 3/2 = 1.5 m

Scale the time

t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.

tfield = 10·(1.5/0.01)² = 225000 min
tfield = 225000/1440 = 156.3 days

Answer

t = 156.3 days
17.Hydrostatic force

Answer: F = 165.5 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 3 + 1.5/2 = 3.75 m
A = H·b = 1.5·3 = 4.5 m²
gated = 3 mH = 1.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·3.75·4.5 = 165.5 kN

Answer

F = 165.5 kN
18.Hydrostatic force

Answer: ycp = 5.636 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 4 + 3/2 = 5.5 m
A = H·b = 3·2 = 6 m²
gated = 4 mH = 3 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·5.5·6 = 323.7 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 2·3³/12 = 4.5 m⁴
ycp = yc + Ic/(yc·A) = 5.5 + 4.5/(5.5·6) = 5.636 m

Answer

ycp = 5.636 m
19.Pipe friction & head loss

Answer: Δp = 54 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.018·(800/0.3)·1.5²/(2·9.81) = 5.505 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·5.505 = 54000 Pa = 54 kPa

Answer

Δp = 54 kPa
20.Pipe friction & head loss

Answer: H = 6.488 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.06/0.03142 = 1.91 m/s
V²/(2g) = 0.1859 m

Loss coefficients

f·L/D = 0.015·300/0.2 = 22.5
ΣK = 0.5 + 3·0.3 + 10 = 11.4

Energy equation

The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.

H = (1 + 22.5 + 11.4)·0.1859 = 6.488 m

Answer

H = 6.488 m
21.Open-channel flow (Manning)

Answer: Q = 84.72 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (4.5 + 1.5·2.3)·2.3 = 18.28 m²
P = b + 2y·√(1 + z²) = 4.5 + 2·2.3·√(1 + 1.5²) = 12.79 m
R = A/P = 1.429 m

Velocity

V = (1/0.015)·1.4292/3·0.0031/2 = 4.633 m/s

Flow rate

Q = A·V = 18.28·4.633 = 84.72 m³/s

Answer

Q = 84.72 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.001446 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 4·1.6 = 6.4 m²
P = b + 2y = 4 + 2·1.6 = 7.2 m
R = A/P = 0.8889 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.015·15/(6.4·0.9245) = 0.03803
S = 0.03803² = 0.001446

Answer

S = 0.001446

That is a fall of 1.446 m per kilometre.

23.Pumps & pump power

Answer: Pshaft = 3.924 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.015·16 = 2.354 kW

Shaft power

Pshaft = Ph/η = 2.354/0.6 = 3.924 kW

Answer

Pshaft = 3.924 kW
24.Pumps & pump power

Answer: H = 51.63 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.02/0.007854 = 2.546 m/s
V²/(2g) = 0.3305 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (75 + 8)·0.3305 = 27.43 m

Pressure head

p/(ρ·g) = 100000/(1000·9.81) = 10.19 m

Pump head

Both surfaces are practically at rest, so there is no velocity head term.

H = Δz + p/(ρ·g) + hL = 14 + 10.19 + 27.43 = 51.63 m

Answer

H = 51.63 m
25.Time value of money

Answer: PV = 11943 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Annuity factor

(1 − (1 + i)−n)/i = (1 − 0.582)/0.07 = 5.971

Present value

PV = 2 000·5.971 = €11 942.60

Answer

PV = €11 942.60
26.Time value of money

Answer: I = 3983 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly payment

i = 0.003, N = 84
A = 30 000·0.003/(1 − (1 + 0.003)−84) = €404.56

Total interest

I = N·A − P = 84·404.6 − 30 000 = €3 983.33

Answer

I = €3 983.33
27.NPV & IRR

Answer: NPV = 3170 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of each cash flow

CF0 = −20 000
CF1/(1 + 0.08)1 = 5 000/1.08 = 4 629.63
CF2/(1 + 0.08)2 = 10 000/1.166 = 8 573.39
CF3/(1 + 0.08)3 = 7 000/1.26 = 5 556.83
CF4/(1 + 0.08)4 = 6 000/1.36 = 4 410.18

Add them up

NPV = €3 170.02

Answer

NPV = €3 170.02

NPV is positive, so the project earns more than the required return.

28.NPV & IRR

Answer: MIRR = 14.76 %

Modified IRR: compound every inflow forward to the end of the project at the reinvestment rate (usually the cost of capital) to get the terminal value TV. MIRR is the rate that turns the initial investment into TV: MIRR = (TV/C₀)^(1/n) − 1.

Terminal value of the inflows

24 000·1.122 = 30 105.60
20 500·1.121 = 22 960.00
22 500·1.120 = 22 500.00
TV = 75 565.60

MIRR

MIRR = (75 565.60/50 000)1/3 − 1 = 14.76%

Answer

MIRR = 14.76%
29.Normal distribution

Answer: P = 0.8726

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z-scores

z₁ = (440 − 500)/40 = −1.5
z₂ = (562 − 500)/40 = 1.55

Area between

P = Φ(1.55) − Φ(−1.5) = 0.9394 − 0.06681 = 0.8726

Answer

P = 0.8726
30.Normal distribution

Answer: P = 0.8554

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the difference

μ = 25.03 − 25 = 0.03 mm, σ = 0.02828 mm

Standardise

z = (0 − 0.03)/0.02828 = −1.06

Probability

P = 1 − Φ(−1.06) = 0.8554

Answer

P = 0.8554

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.

ExamProblems · examproblems.com/courses/fe-exam-civil