laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.
L = 8 mP1 = 40 kN at 1 mP2 = 35 kN at 7 m
RA = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 6 mP = 10 kN at 2.5 mw = 8 kN/m from 3 to 4 m
RB = kN
3.Truss: method of jointsMedium
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
B: 25 kN ↓C: 15 kN ↓D: 40 kN ↓F: 40 kN ↓
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member FC
13member HC
4.Truss: method of jointsHard
Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.
span = 6 mheight = 2 mB is 1 m from Avertical load = 25 kNhorizontal load = 15 kN ←
FAC = kN
5.Shear force & bending momentMedium
The simply supported beam carries a clockwise couple M0 = 10 kN·m at x = 4 m from A, and no other load. Find the bending moment Mx just to the left of the couple. Use sagging moments positive and upward shear on the left face positive.
L = 8 mM0 = 10 kN·m clockwise, at 4 m
Mx = kN·m
6.Shear force & bending momentHard
Find the bending moment Mx at the section x = 1 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 4 mP = 40 kN at 2 mw = 8 kN/m from 0 to 4 mx = 1 m
Mx = kN·m
7.Beam deflectionMedium
A simply supported beam carries a uniformly distributed load w over its whole span. Find the maximum deflection δmax, at midspan.
w = 15 kN/mL = 3 mE = 70 GPa (aluminium)I = 84 × 10⁶ mm⁴
δmax = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w and a point load P at midspan. Using superposition, find the midspan deflection δmax.
P = 23 kNw = 2 kN/mL = 2.5 mE = 11 GPa (timber)I = 84 × 10⁶ mm⁴
δmax = mm
9.Column bucklingMedium
A column of length L made of aluminium is fixed at both ends. Using Euler’s formula, find its critical buckling load Pcr.
L = 3 mE = 70 GPa (aluminium)b × h = 20 × 40 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of aluminium is fixed at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 6 mE = 70 GPa (aluminium)d = 40 mm
σcr = MPa
11.Centroid & second moment of areaMedium
A 200 mm × 200 mm plate has a circular hole of diameter 30 mm on its vertical centre line, with its centre 130 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 200 mmh = 200 mmd = 30 mmhole centre: y = 130 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A cast-iron beam has the T-section shown, with the flange on top. The allowable stresses are 60 MPa in tension and 100 MPa in compression. Find the largest hogging bending moment Mallow the beam can carry (give its size).
A 5 m thick overconsolidated clay layer has Cc = 0.5, Cr = 0.03 and e₀ = 0.9. At its mid-depth the effective vertical stress is 115 kPa and the preconsolidation pressure is 185 kPa. A new building adds 180 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
In a laboratory oedometer test, a clay specimen 25 mm thick, drained at the top and bottom, reaches 50% consolidation in 15 min. In the field the same clay forms a layer 7 m thick. It lies on impervious rock, with sand above it, so water drains out only at the top. How many days t does the field layer take to reach 50% consolidation?
A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 2.5 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 3 m wide sits in the wall of a tank of glycerin, with its top edge 2 m below the surface. Find the resultant hydrostatic force F on the gate.
d = 2 mH = 3 mb = 3 mρ = 1260 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
Water flows at 4 L/s through a pipe 200 m long with an inside diameter of 50 mm. Use the Darcy friction factor f = 0.03 and g = 9.81 m/s². Find the friction head loss hf.
Q = 4 L/sL = 200 mD = 50 mmf = 0.03g = 9.81 m/s²
hf = m
20.Pipe friction & head lossHard
Two open reservoirs are joined by a pipe 400 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.018. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 75 L/s?
A trapezoidal clean earth channel has a bottom width of 5 m and side slopes of 3:1 (horizontal:vertical). Water flows uniformly 0.9 m deep. Manning n = 0.022 and the bed slope is S = 0.001. Find the flow rate Q in m³/s.
b = 5 my = 0.9 mz = 3n = 0.022S = 0.001
Q = m³/s
22.Open-channel flow (Manning)Hard
A rectangular gravel channel 1 m wide must carry 2 m³/s in uniform flow at a depth of 1.5 m. Manning n = 0.025. Find the required bed slope S (in m/m).
Q = 2 m³/sb = 1 my = 1.5 mn = 0.025
S = m/m
23.Pumps & pump powerMedium
A pump delivers 40 L/s of water (ρ = 1000 kg/m³) against a head of 40 m. The pump efficiency is 65% and the electric motor driving it has an efficiency of 94%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.
A pump moves 15 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 12 m higher. The pipe is 100 m long with an inside diameter of 100 mm and a Darcy friction factor f = 0.02; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 300 kPa. Find the head H the pump must add.
A credit card charges a nominal interest rate of 22% per year, compounded quarterly. Find the effective annual rate EAR in percent.
r = 22%m = 4
EAR = %
26.Time value of moneyHard
A loan of €15 000 is repaid with equal monthly payments over 3 years at 5.4% per year, compounded monthly. How much interest I is paid in total over the life of the loan?
P = €15 0005.4% / 12N = 36
I = €
27.NPV & IRRMedium
A machine costs €80 000 today, lasts 5 years and costs €4 000 per year to run (paid at the end of each year). The cost of capital is 5%. Find its equivalent annual cost EAC.
C0 = €80 000M = €4 000n = 5r = 5%
EAC = €
28.NPV & IRRHard
A project costs €50 000 and returns €25 500, €29 000 at the end of years 1 to 2. Find its internal rate of return IRR in percent.
CF0 = −50 000CF1 = 25 500CF2 = 29 000
IRR = %
29.Normal distributionMedium
Drag z so that the shaded area under the standard normal curve, to the right of z, is 0.2236. Find z to two decimals.
A = 0.2236
z =
30.Normal distributionHard
Hole diameters D are normal with mean 25.05 mm and standard deviation 0.02 mm. Shaft diameters d are independent and normal with mean 25 mm and standard deviation 0.015 mm. A randomly chosen shaft fits when D − d > 0. Find the probability P that it fits. Round z to two decimals.
hole: μ = 25.05 mm, σ = 0.02 mmshaft: μ = 25 mm, σ = 0.015 mm
P =
3Solutions
1.Beam support reactions
Answer: RA = 39.38 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·8 = 40·1 + 35·7
RB = 285/8 = 35.63 kN
ΣFy = 0: RA = 75 − 35.63 = 39.38 kN
Answer
RA = 39.38 kN
2.Beam support reactions
Answer: RB = 8.833 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
UDL resultant: W = w·ℓ = 8·1 = 8 kN, acting at x̄ = 3.5 m
ΣMA = 0: RB·6 = 10·2.5 + 8·1·3.5
RB = 53/6 = 8.833 kN
ΣFy = 0: RA = 18 − 8.833 = 9.167 kN
Answer
RB = 8.833 kN
3.Truss: method of joints
Answer: member CG
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint G
FG and GH lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.
ΣF⊥ = 0 → FCG = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·6 = 25·1 − 15·2 → Cy = −0.8333 kN
ΣFy = 0: Ay = 25 − −0.8333 = 25.83 kN
ΣFx = 0: Ax = 15 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
sin γ = 2/5.385 = 0.3714, cos γ = 5/5.385 = 0.9285
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. An applied couple makes the bending moment diagram jump by the size of the couple.
Support reactions
Moments about A, counter-clockwise positive: RB·L − M0 = 0. Vertical balance: RA + RB = 0.
RB = M0/L = 10/8 = 1.25 kN (upward)
RA = −RB = −1.25 kN (downward)
Cut just left of the couple
The left part contains only RA.
Mx = RA·a = −1.25·4 = −5 kN·m
Answer
Mx = −5 kN·m
6.Shear force & bending moment
Answer: Mx = 32 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 8·4 = 32 kN, acting at x̄ = 2 m
ΣMA = 0: RB·4 = 40·2 + 8·4·2
RB = 144/4 = 36 kN
ΣFy = 0: RA = 72 − 36 = 36 kN
Cut at x = 1 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 36·1 − 8·1·0.5 = 32 kN·m
Answer
Mx = 32 kN·m
7.Beam deflection
Answer: δmax = 2.691 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
w = 15 N/mm, L = 3000 mm
EI = 5.88 × 10¹² N·mm²
Deflection
δmax = 5wL⁴/(384EI) = 5·15·3000⁴/(384·5.88 × 10¹²) = 2.691 mm
Answer
δmax = 2.691 mm
8.Beam deflection
Answer: δmax = 9.204 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 23000 N, w = 2 N/mm, L = 2500 mm, EI = 9.24 × 10¹¹ N·mm²
Each load on its own
δP = PL³/(48EI) = 23000·2500³/(48·9.24 × 10¹¹) = 8.103 mm
δw = 5wL⁴/(384EI) = 5·2·2500⁴/(384·9.24 × 10¹¹) = 1.101 mm
Add them
δmax = 8.103 + 1.101 = 9.204 mm
Answer
δmax = 9.204 mm
9.Column buckling
Answer: Pcr = 8.188 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·40⁴/64 = 125664 mm⁴
Radius of gyration and slenderness
A = 1257 mm²
r = √(I/A) = √(125664/1257) = 10 mm
KL = 0.5·6000 = 3000 mm
KL/r = 3000/10 = 300
Critical stress
σcr = π²E/(KL/r)² = π²·70000/300² = 7.676 MPa
Answer
σcr = 7.676 MPa
11.Centroid & second moment of area
Answer: Ix = 132.6 × 10⁶ mm⁴
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (40000·100 − 706.9·130)/(40000 − 706.9) = 99.46 mm
Full plate about ȳ
200·200³/12 + 40000·0.5397² = 133.3 × 10⁶ mm⁴
Hole about ȳ
π·30⁴/64 + 706.9·30.54² = 0.699 × 10⁶ mm⁴
Subtract
Ix = 132.6 × 10⁶ mm⁴
Answer
Ix = 132.6 × 10⁶ mm⁴
12.Centroid & second moment of area
Answer: Mallow = 4.928 kN·m
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Hogging: the top is in tension, the bottom in compression.
top edge: M = 60·5.728 × 10⁶/33.77 = 10.18 kN·m
bottom edge: M = 100·5.728 × 10⁶/116.2 = 4.928 kN·m
Governing value
Mallow = min = 4.928 kN·m (bottom edge)
Answer
Mallow = 4.928 kN·m
13.Effective stress in soil
Answer: σ = 115.5 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·6.5 = 63.77 kPa
Answer
u = 63.77 kPa
15.Consolidation settlement
Answer: S = 282.9 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 115 + 180 = 295 kPa > 185 kPa
Settlement
Recompression up to σ′p, virgin compression beyond it.
S = 0.03·5/(1 + 0.9)·log₁₀(185/115) + 0.5·5/(1 + 0.9)·log₁₀(295/185)
S = 16.3 + 266.6 = 282.9 mm
Answer
S = 282.9 mm
16.Consolidation settlement
Answer: t = 3267 days
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage paths
Hdr,lab = 25/2 = 12.5 mm = 0.0125 m
Hdr,field = 7 m
Scale the time
t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.
tfield = 15·(7/0.0125)² = 4.704 × 10⁶ min
tfield = 4.704 × 10⁶/1440 = 3267 days
Answer
t = 3267 days
17.Hydrostatic force
Answer: F = 183.9 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 2.5 + 2.5/2 = 3.75 m
A = H·b = 2.5·2 = 5 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3.75·5 = 183.9 kN
Answer
F = 183.9 kN
18.Hydrostatic force
Answer: F = 389.4 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 2 + 3/2 = 3.5 m
A = H·b = 3·3 = 9 m²
Resultant force
F = ρ·g·yc·A = 1260·9.81·3.5·9 = 389.4 kN
Answer
F = 389.4 kN
19.Pipe friction & head loss
Answer: hf = 25.38 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Mean velocity
A = π·0.05²/4 = 0.001963 m²
V = Q/A = 0.004/0.001963 = 2.037 m/s
Velocity head
V²/(2g) = 2.037²/(2·9.81) = 0.2115 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.03·(200/0.05)·2.037²/(2·9.81) = 25.38 m
Answer
hf = 25.38 m
20.Pipe friction & head loss
Answer: Δz = 1.785 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.075/0.07069 = 1.061 m/s
V²/(2g) = 0.05738 m
Loss coefficients
f·L/D = 0.018·400/0.3 = 24
ΣK = 0.5 + 2·0.3 + 5 + 1.0 = 7.1
Total head loss
hf = 24·0.05738 = 1.377 m
hm = 7.1·0.05738 = 0.4074 m
Δz = hf + hm = 1.785 m
Answer
Δz = 1.785 m
21.Open-channel flow (Manning)
Answer: Q = 7.46 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (5 + 3·0.9)·0.9 = 6.93 m²
P = b + 2y·√(1 + z²) = 5 + 2·0.9·√(1 + 3²) = 10.69 m
R = A/P = 0.6481 m
Velocity
V = (1/0.022)·0.64812/3·0.0011/2 = 1.077 m/s
Flow rate
Q = A·V = 6.93·1.077 = 7.46 m³/s
Answer
Q = 7.46 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.004109 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = b·y = 1·1.5 = 1.5 m²
P = b + 2y = 1 + 2·1.5 = 4 m
R = A/P = 0.375 m
Solve Manning for S
S1/2 = n·Q/(A·R2/3) = 0.025·2/(1.5·0.52) = 0.0641
S = 0.0641² = 0.004109
Answer
S = 0.004109
That is a fall of 4.109 m per kilometre.
23.Pumps & pump power
Answer: Pel = 25.69 kW
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.04·40 = 15.7 kW
Shaft power
Pshaft = 15.7/0.65 = 24.15 kW
Electrical power
Pel = 24.15/0.94 = 25.69 kW
Answer
Pel = 25.69 kW
24.Pumps & pump power
Answer: H = 47.41 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are practically at rest, so there is no velocity head term.
H = Δz + p/(ρ·g) + hL = 12 + 30.58 + 4.834 = 47.41 m
Answer
H = 47.41 m
25.Time value of money
Answer: EAR = 23.88 %
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rate per period
r/m = 0.22/4 = 0.055
Compound over one year
EAR = (1 + 0.055)4 − 1 = 1.239 − 1 = 23.88%
Answer
EAR = 23.88%
The EAR is always above the nominal rate when interest compounds more than once a year.
26.Time value of money
Answer: I = 1281 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Monthly payment
i = 0.0045, N = 36
A = 15 000·0.0045/(1 − (1 + 0.0045)−36) = €452.26
Total interest
I = N·A − P = 36·452.3 − 15 000 = €1 281.44
Answer
I = €1 281.44
27.NPV & IRR
Answer: EAC = 22478 €
Equivalent annual cost: spread the present value of all costs over the life as an equal yearly amount (an annuity): EAC = PV·r/(1 − (1 + r)⁻ⁿ). It lets you compare machines with different lives.
Annuity factor
(1 − 1.05−5)/0.05 = 4.329
Annualised purchase price
80 000/4.329 = 18 477.98
EAC
EAC = 18 477.98 + 4 000 = €22 477.98
Answer
EAC = €22 477.98
28.NPV & IRR
Answer: IRR = 5.813 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(5%) = 589.57
NPV(10%) = −2 851.24
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left of z
Φ(z) = 1 − 0.2236 = 0.7764
Read the z-table backwards
Find 0.7764 inside the table and read off z.
z = 0.76
Answer
z = 0.76
30.Normal distribution
Answer: P = 0.9772
Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).
Distribution of the difference
μ = 25.05 − 25 = 0.05 mm, σ = 0.025 mm
Standardise
z = (0 − 0.05)/0.025 = −2
Probability
P = 1 − Φ(−2) = 0.9772
Answer
P = 0.9772
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.