laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. It carries a point load P at 2 m from A and a clockwise couple M at 5 m from A. Find the vertical reaction RB, taking upward as positive.
L = 8 mP = 70 kN at 2 mM = 50 kN·m (clockwise) at 5 m
RB = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.
L = 5 mP = 50 kN at 2.5 mw = 10 kN/m from 1 to 5 m
RA = kN
3.Truss: method of jointsMedium
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
B: 15 kN ↓C: 30 kN ↓F: 35 kN →G: 35 kN ↓
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member FC
13member HC
5.Shear force & bending momentMedium
Find the bending moment Mx at the section x = 3 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 4 mw = 4 kN/m from 0 to 4 mx = 3 m
Mx = kN·m
6.Shear force & bending momentHard
Find the bending moment Mx at the section x = 2 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 6 mP = 15 kN at 2 mw = 10 kN/m from 0 to 6 mx = 2 m
Mx = kN·m
7.Beam deflectionMedium
A cantilever of length L is fixed at A and carries a point load P at a distance a = 2 m from A. Find the deflection δP under the load.
P = 19 kNa = 2 mL = 3 mE = 11 GPa (timber)I = 120 × 10⁶ mm⁴
δP = mm
8.Beam deflectionHard
A propped cantilever is fixed at A and simply supported (propped) at B. It carries a uniformly distributed load w over its whole length. EI is constant. Find the size of the bending moment MA at the fixed end.
L = 4 mw = 5 kN/m
MA = kN·m
9.Column bucklingMedium
A column of length L made of aluminium is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 3 mE = 70 GPa (aluminium)b × h = 50 × 100 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of steel is pinned at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 4 mE = 200 GPa (steel)d = 25 mm
σcr = MPa
11.Centroid & second moment of areaMedium
Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.
bf = 100 mmtf = 20 mmtw = 16 mmhw = 100 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A welded I-section has a top flange 150 × 12 mm, a web 150 mm high and 12 mm thick, and a bottom flange 180 × 14 mm (width × thickness). Find its second moment of area Ix about the horizontal axis x through its centroid.
top flange: 150 × 12 mmweb: 12 × 150 mmbottom flange: 180 × 14 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
For the soil profile shown, find the vertical effective stress σ′ at point X.
A 6.5 m thick overconsolidated clay layer has Cc = 0.4, Cr = 0.02 and e₀ = 0.95. At its mid-depth the effective vertical stress is 100 kPa and the preconsolidation pressure is 170 kPa. A new building adds 30 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 9.5 m thick has a coefficient of consolidation cv = 2 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 80% average consolidation the time factor is Tv = 0.567. How many years t does the layer take to reach 80% consolidation?
A vertical rectangular gate 1.5 m wide sits in the wall of a tank of water, with its top edge 3 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 1 m wide sits in the wall of a tank of water, with its top edge 2 m below the surface. Find the depth ycp of the centre of pressure below the surface.
d = 2 mH = 1 mb = 1 mρ = 1000 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
Water (ρ = 1000 kg/m³) flows at 2 m/s through a horizontal pipe, 1000 m long, with an inside diameter of 75 mm. Use the Darcy friction factor f = 0.028 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.
Two open reservoirs are joined by a pipe 400 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.015. The water surface of the upper reservoir is 7 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each), a valve (K = 10) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.
A trapezoidal grass-lined earth channel has a bottom width of 5.5 m and side slopes of 1:1 (horizontal:vertical). Water flows uniformly 2.2 m deep. Manning n = 0.03 and the bed slope is S = 0.0015. Find the flow rate Q in m³/s.
b = 5.5 my = 2.2 mz = 1n = 0.03S = 0.0015
Q = m³/s
22.Open-channel flow (Manning)Hard
A concrete sewer with an inside diameter of 200 mm (Manning n = 0.013) must reach a self-cleansing velocity of 1.2 m/s when flowing just full. Find the minimum slope S (in m/m).
D = 200 mmn = 0.013V = 1.2 m/s
S = m/m
23.Pumps & pump powerMedium
A pump delivers 15 L/s of water (ρ = 1000 kg/m³) against a head of 76 m. The pump efficiency is 80% and the electric motor driving it has an efficiency of 94%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.
A pump moves 120 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 22 m higher. The pipe is 200 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.018; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². The pump efficiency is 72%. Find the shaft power Pshaft in kW.
A property is expected to earn net rent of €10 000 next year. The rent is expected to grow by 2% per year forever. The required return is 7% per year. Find the value PV of the property today.
C1 = €10 000g = 2%r = 7%
PV = €
26.Time value of moneyHard
A mortgage of €200 000 is repaid with equal monthly payments over 25 years at 4.8% per year, compounded monthly. How much is still owed just after the payment at the end of year 4? Find the outstanding balance B.
P = €200 0004.8% / 12N = 300k = 48
B = €
27.NPV & IRRMedium
An investment of €60 000 gives these cash flows at the end of years 1 to 3: €13 000, €24 000, €20 000. The cost of capital is 8%. Find the net present value NPV.
A project costs €10 000 and returns €6 000, €5 000, €6 000 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
CF0 = −10 000CF1 = 6 000CF2 = 5 000CF3 = 6 000
IRR = %
29.Normal distributionMedium
The delivery times are normally distributed with mean 32 min and standard deviation 6 min. What fraction lies between 27.2 and 38.3 min? Give P as a decimal.
μ = 32σ = 6x1 = 27.2x2 = 38.3
P =
30.Normal distributionHard
The exam scores are normally distributed with mean 65 points and standard deviation 10 points. Find the value x below which 90% of them lie (the 90th percentile).
μ = 65σ = 10P = 90%
x = points
3Solutions
1.Beam support reactions
Answer: RB = 23.75 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Moments about A
Counter-clockwise positive.
ΣMA = 0: RB·8 − 70·2 − 50 = 0
RB = 190/8 = 23.75 kN
Vertical equilibrium
RA = 70 − 23.75 = 46.25 kN
Answer
RB = 23.75 kN
A negative reaction acts downward.
2.Beam support reactions
Answer: RA = 41 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
UDL resultant: W = w·ℓ = 10·4 = 40 kN, acting at x̄ = 3 m
ΣMA = 0: RB·5 = 50·2.5 + 10·4·3
RB = 245/5 = 49 kN
ΣFy = 0: RA = 90 − 49 = 41 kN
Answer
RA = 41 kN
3.Truss: method of joints
Answer: member DH
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint D
CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.
ΣF⊥ = 0 → FDH = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint D
CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.
ΣF⊥ = 0 → FDH = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 4·4 = 16 kN, acting at x̄ = 2 m
ΣMA = 0: RB·4 = 4·4·2
RB = 32/4 = 8 kN
ΣFy = 0: RA = 16 − 8 = 8 kN
Cut at x = 3 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 8·3 − 4·3·1.5 = 6 kN·m
Answer
Mx = 6 kN·m
6.Shear force & bending moment
Answer: Mx = 60 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 10·6 = 60 kN, acting at x̄ = 3 m
ΣMA = 0: RB·6 = 15·2 + 10·6·3
RB = 210/6 = 35 kN
ΣFy = 0: RA = 75 − 35 = 40 kN
Cut at x = 2 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 40·2 − 10·2·1 = 60 kN·m
Answer
Mx = 60 kN·m
7.Beam deflection
Answer: δP = 38.38 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 19000 N, a = 2000 mm, L = 3000 mm
EI = 1.32 × 10¹² N·mm²
Deflection under the load
δP = Pa³/(3EI) = 19000·2000³/(3·1.32 × 10¹²) = 38.38 mm
Answer
δP = 38.38 mm
8.Beam deflection
Answer: MA = 10 kN·m
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).
Remove the prop
Without the prop the beam is a cantilever. Its free end would deflect under the load.
δload = wL⁴/(8EI)
Compatibility at the prop
The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·25⁴/64 = 19175 mm⁴
Radius of gyration and slenderness
A = 490.9 mm²
r = √(I/A) = √(19175/490.9) = 6.25 mm
KL = 1·4000 = 4000 mm
KL/r = 4000/6.25 = 640
Critical stress
σcr = π²E/(KL/r)² = π²·200000/640² = 4.819 MPa
Answer
σcr = 4.819 MPa
11.Centroid & second moment of area
Answer: Ix = 4.6 × 10⁶ mm⁴
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 100·20 = 2000 mm², yf = 100 + 20/2 = 110 mm
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into three rectangles
Measure every y from the bottom edge.
top flange: A = 1800 mm², y = 170 mm
web: A = 1800 mm², y = 89 mm
bottom flange: A = 2520 mm², y = 7 mm
Centroid
ȳ = (1800·170 + 1800·89 + 2520·7)/6120 = 79.06 mm
Parallel-axis theorem
top flange: 150·12³/12 + 1800·90.94² = 1.491 × 10⁷ mm⁴
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·zw + γsat·(z − zw) = 17·2 + 19·4 = 110 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·4 = 39.24 kPa
Effective stress
σ′ = σ − u = 110 − 39.24 = 70.76 kPa
Answer
σ′ = 70.76 kPa
14.Effective stress in soil
Answer: σ = 155.8 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·1 + γsat,sand·4 + γsat,clay·3.5
σ = 15·1 + 19·4 + 18.5·3.5 = 155.8 kPa
Answer
σ = 155.8 kPa
15.Consolidation settlement
Answer: S = 7.596 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 100 + 30 = 130 kPa ≤ 170 kPa
Settlement
The clay stays on its recompression line.
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.02·6.5/(1 + 0.95)·log₁₀(130/100) = 7.596 mm
Answer
S = 7.596 mm
16.Consolidation settlement
Answer: t = 25.59 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H = 9.5 m
Time
t = Tv·Hdr²/cv = 0.567·9.5²/2 = 25.59 years
Answer
t = 25.59 years
17.Hydrostatic force
Answer: F = 117.7 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 3 + 2/2 = 4 m
A = H·b = 2·1.5 = 3 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·4·3 = 117.7 kN
Answer
F = 117.7 kN
18.Hydrostatic force
Answer: ycp = 2.533 m
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 2 + 1/2 = 2.5 m
A = H·b = 1·1 = 1 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·2.5·1 = 24.52 kN
Centre of pressure
Pressure grows with depth, so the resultant acts below the centroid.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Head loss
hf = f·(L/D)·V²/(2g) = 0.028·(1000/0.075)·2²/(2·9.81) = 76.11 m
Pressure drop
The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Loss coefficients
f·L/D = 0.015·400/0.25 = 24
ΣK = 0.5 + 4·0.3 + 10 + 1.0 = 12.7
Energy equation
Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (5.5 + 1·2.2)·2.2 = 16.94 m²
P = b + 2y·√(1 + z²) = 5.5 + 2·2.2·√(1 + 1²) = 11.72 m
R = A/P = 1.445 m
Velocity
V = (1/0.03)·1.4452/3·0.00151/2 = 1.65 m/s
Flow rate
Q = A·V = 16.94·1.65 = 27.95 m³/s
Answer
Q = 27.95 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.01321 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Hydraulic radius
R = D/4 = 0.2/4 = 0.05 m
Solve Manning for S
S = (n·V/R2/3)² = (0.013·1.2/0.1357)² = 0.01321
Answer
S = 0.01321
That is a fall of 13.21 m per kilometre.
23.Pumps & pump power
Answer: Pel = 14.87 kW
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.015·76 = 11.18 kW
Shaft power
Pshaft = 11.18/0.8 = 13.98 kW
Electrical power
Pel = 13.98/0.94 = 14.87 kW
Answer
Pel = 14.87 kW
24.Pumps & pump power
Answer: Pshaft = 46.13 kW
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Whatever is still owed must be exactly paid off by the remaining payments.
N − k = 300 − 48 = 252
B = 1146·(1 − (1 + 0.004)−252)/0.004 = €181 730.95
Answer
B = €181 730.95
27.NPV & IRR
Answer: NPV = −11510 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −60 000
CF1/(1 + 0.08)1 = 13 000/1.08 = 12 037.04
CF2/(1 + 0.08)2 = 24 000/1.166 = 20 576.13
CF3/(1 + 0.08)3 = 20 000/1.26 = 15 876.64
Add them up
NPV = €−11 510.19
Answer
NPV = €−11 510.19
NPV is negative, so the project earns less than the required return.
28.NPV & IRR
Answer: IRR = 32.17 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(30%) = 304.96
NPV(35%) = −373.42
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
IRR ≈ 30 + 5·304.96/(304.96 − (−373.42)) = 32.25%
exact: NPV(32.17%) = 0 → IRR = 32.17%
Answer
IRR = 32.17%
29.Normal distribution
Answer: P = 0.6413
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z-scores
z₁ = (27.2 − 32)/6 = −0.8
z₂ = (38.3 − 32)/6 = 1.05
Area between
P = Φ(1.05) − Φ(−0.8) = 0.8531 − 0.2119 = 0.6413
Answer
P = 0.6413
30.Normal distribution
Answer: x = 77.82 points
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.