1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 60 kNP2​ = 55 kNABRA​RB​ = ?3 m2 m3 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.

L = 8 mP1 = 60 kN at 3 mP2 = 55 kN at 5 m
RB = kN
2.Beam support reactionsHard
w = 5 kN/mP = 45 kNABRA​ = ?RB​1 m2 m2 m1 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.

L = 6 mP = 45 kN at 3 mw = 5 kN/m from 1 to 5 m
RA = kN
3.Truss: method of jointsMedium
ABCDEFGH40 kN15 kN20 kN4 × 4 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 40 kN ↓D: 15 kN ↓H: 20 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
4.Truss: method of jointsHard
ABCDEFGH40 kN40 kN25 kN20 kN10 kN15 kN4 × 3 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 40 kN ↓C: 40 kN ↓F: 25 kN ↓F: 20 kN →G: 10 kN ↓H: 15 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
5.Shear force & bending momentMedium
60 kN30 kNABCDEFG2 m2 m2 m2 m2 m2 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

60 kN @ 2 m30 kN @ 4 m
  1. 1A (x = 0 m)
  2. 2B (x = 2 m)
  3. 3C (x = 4 m)
  4. 4D (x = 6 m)
  5. 5E (x = 8 m)
  6. 6F (x = 10 m)
  7. 7G (x = 12 m)
6.Shear force & bending momentHard
5 kN/m20 kN10 kNABCDEFG2 m2 m2 m2 m2 m2 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

20 kN @ 12 m10 kN @ 4 m5 kN/m, 0–8 m
  1. 1A (x = 0 m)
  2. 2B (x = 2 m)
  3. 3C (x = 4 m)
  4. 4D (x = 6 m)
  5. 5E (x = 8 m)
  6. 6F (x = 10 m)
  7. 7G (x = 12 m)
7.Beam deflectionMedium
P = 11 kNABδ3.5 m2.5 m

A simply supported beam carries a point load P at a = 3.5 m from support A. Find the deflection δP under the load.

P = 11 kNa = 3.5 mL = 6 mE = 200 GPa (steel)I = 120 × 10⁶ mm⁴
δP = mm
8.Beam deflectionHard
w = 4 kN/mP = 25 kNδL = 5 m

A simply supported beam carries a uniformly distributed load w and a point load P at midspan. Using superposition, find the midspan deflection δmax.

P = 25 kNw = 4 kN/mL = 5 mE = 200 GPa (steel)I = 160 × 10⁶ mm⁴
δmax = mm
9.Column bucklingMedium
PL = 2 md = 60 mmcross-section

A column of length L made of steel is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 2 mE = 200 GPa (steel)d = 60 mm
Pcr = kN
10.Column bucklingHard
PL = 2.5 md = 40 mmcross-section

A column of length L made of steel is fixed at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 2.5 mE = 200 GPa (steel)d = 40 mm
σcr = MPa
11.Centroid & second moment of areaMedium
100 mm240 mm84 mmØ40xIx​ = ?

A 100 mm × 240 mm plate has a circular hole of diameter 40 mm on its vertical centre line, with its centre 84 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 100 mmh = 240 mmd = 40 mmhole centre: y = 84 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
200 mm200 mm140 mm50 × 50xIx​ = ?

A 200 mm × 200 mm plate has a rectangular cut-out 50 mm wide and 50 mm high, centred on the vertical centre line with its centre 140 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 200 mmh = 200 mmcut-out: 50 × 50 mmhole centre: y = 140 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
sandγd​ = 16 kN/m³γsat​ = 20 kN/m³12 mwater tableXz = 7 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 7 mzw = 4 mγw = 9.81 kN/m³sand: γd = 16 kN/m³sand: γsat = 20 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 16 kN/m³γsat​ = 20.5 kN/m³3 mclayγsat​ = 17.5 kN/m³5 mwater tableXz = 5.5 m

For the soil profile shown, find the pore water pressure u at point X.

z = 5.5 mzw = 2 mγw = 9.81 kN/m³sand: γd = 16 kN/m³sand: γsat = 20.5 kN/m³clay: γsat = 17.5 kN/m³
u = kPa
15.Consolidation settlementMedium
Δσ = 160 kPasandclayCc​ = 0.3, Cr​ = 0.04e0​ = 0.95σ′0​ = 85 kPaOCR = 32 mwater table

A 2 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.04 and e₀ = 0.95. At its mid-depth the effective vertical stress is 85 kPa and the overconsolidation ratio is OCR = 3. A new building adds 160 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 2 mCc = 0.3Cr = 0.04e0 = 0.95σ′0 = 85 kPaOCR = 3Δσ = 160 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 8.5 mcv​ = 2 m²/year8.5 msandwater table

A clay layer 8.5 m thick has a coefficient of consolidation cv = 2 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 70% average consolidation the time factor is Tv = 0.403. How many years t does the layer take to reach 70% consolidation?

H = 8.5 mcv = 2 m²/yearU = 70%Tv = 0.403double drainage
t = years
17.Hydrostatic forceMedium
gated = 4 mH = 3 m

A vertical rectangular gate 1.5 m wide sits in the wall of a tank of water, with its top edge 4 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 4 mH = 3 mb = 1.5 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 1.5 mH = 2 m

A vertical rectangular gate 1 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1.5 mH = 2 mb = 1 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
V = 2.7 m/sD = 300 mmL = 300 mf = 0.03

Water (ρ = 1000 kg/m³) flows at 2.7 m/s through a horizontal pipe, 300 m long, with an inside diameter of 300 mm. Use the Darcy friction factor f = 0.03 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 2.7 m/sL = 300 mD = 300 mmf = 0.03ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 10Δz = ?L = 150 m, D = 200 mm, f = 0.0252× bend (K = 0.3)

Two open reservoirs are joined by a pipe 150 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.025. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 10) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 60 L/s?

Q = 60 L/sL = 150 mD = 200 mmf = 0.025Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 10Kexit = 1.0
Δz = m
21.Open-channel flow (Manning)Medium
D = 900 mmn = 0.013, S = 0.004

A concrete storm sewer with an inside diameter of 900 mm flows just full (as an open channel, not under pressure). Manning n = 0.013 and the slope is S = 0.004. Find the flow rate Q in m³/s.

D = 900 mmn = 0.013S = 0.004
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 5 my = 1.5 m1.5 : 1n = 0.03, Q = 14 m³/s

A trapezoidal grass-lined earth channel with a bottom width of 5 m and side slopes of 1.5:1 (horizontal:vertical) must carry 14 m³/s in uniform flow at a depth of 1.5 m. Manning n = 0.03. Find the required bed slope S (in m/m).

Q = 14 m³/sb = 5 my = 1.5 mz = 1.5n = 0.03
S = m/m
23.Pumps & pump powerMedium
PQ = 30 L/sH = 76 m

A pump with an efficiency of 65% delivers 30 L/s of water (ρ = 1000 kg/m³) against a head of 76 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.

Q = 30 L/sH = 76 mη = 65%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
PQ = 80 L/sΔz = 18 mL = 150 m, D = 200 mm, f = 0.018, ΣK = 6

A pump moves 80 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 18 m higher. The pipe is 150 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.018; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². The pump efficiency is 70%. Find the shaft power Pshaft in kW.

Q = 80 L/sΔz = 18 mL = 150 mD = 200 mmf = 0.018ΣK = 6η = 70%
Pshaft = kW
25.Time value of moneyMedium
years0123€3 000FV = ?

You invest €3 000 at a nominal rate of 6% per year, compounded quarterly. Find the value FV of the investment after 3 years.

PV = €3 0006% / 4n = 3
FV = €
26.Time value of moneyHard
months0123…180A?AA€75 000

You want €75 000 in 15 years. You save the same amount at the end of every month in an account paying 4.2% per year, compounded monthly. Find the monthly deposit A.

FV = €75 0004.2% / 12N = 180
A = €
27.NPV & IRRMedium
years0123…9−100 0005 000+4%+4%…r = 8%, NPV = ?

A project costs €100 000 today. It generates €5 000 at the end of the first year, and the cash flow then grows by 4% per year forever. The cost of capital is 8%. Find the net present value NPV.

C0 = €100 000CF1 = €5 000g = 4%r = 8%
NPV = €
28.NPV & IRRHard
years0123−50 00018 50018 50018 500

An investment of €50 000 returns €18 500 at the end of each year for 3 years. Find its internal rate of return IRR in percent.

C0 = €50 000CF = €18 500n = 3
IRR = %
29.Normal distributionMedium
400 g394.3 gT = X₁ + … + X₁₀?

The masses of bolts are independent and normal with mean 40 g and standard deviation 1.2 g. Find the probability P that the total mass of 10 of them is below 394.3 g. Round z to two decimals.

μ = 40 gσ = 1.2 gn = 10< 394.3 g
P =
30.Normal distributionHard
157164171178185192199cmbottom 20%

The heights of adult men are normally distributed with mean 178 cm and standard deviation 7 cm. Drag the cut-off so the shaded bottom 20% is to the left of it. Find the cut-off x.

μ = 178 cmσ = 7 cm20%
x = cm

3Solutions

1.Beam support reactions

Answer: RB = 56.88 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

P1​ = 60 kNP2​ = 55 kNABRA​RB​3 m2 m3 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·8 = 60·3 + 55·5
RB = 455/8 = 56.88 kN
ΣFy = 0: RA = 115 − 56.88 = 58.13 kN

Answer

RB = 56.88 kN
2.Beam support reactions

Answer: RA = 32.5 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

w = 5 kN/mP = 45 kNABRA​RB​1 m2 m2 m1 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

UDL resultant: W = w·ℓ = 5·4 = 20 kN, acting at x̄ = 3 m
ΣMA = 0: RB·6 = 45·3 + 5·4·3
RB = 195/6 = 32.5 kN
ΣFy = 0: RA = 65 − 32.5 = 32.5 kN

Answer

RA = 32.5 kN
3.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 38.75 kN (T), BC: 37.5 kN (T), CD: 37.5 kN (T), DE: 36.25 kN (T), FG: 38.75 kN (C), GH: 36.25 kN (C), AF: 54.8 kN (C), HE: 51.27 kN (C), BF: 38.75 kN (T), CG: 0, DH: 16.25 kN (T), BG: 1.768 kN (T), DG: 1.768 kN (C)

Answer

Zero-force member: CG
4.Truss: method of joints

Answer: member DH

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint D

CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.

ΣF⊥ = 0 → FDH = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 92.5 kN (T), BC: 92.5 kN (T), CD: 57.5 kN (T), DE: 57.5 kN (T), FG: 100 kN (C), GH: 100 kN (C), AF: 102.5 kN (C), HE: 81.32 kN (C), BF: 40 kN (T), CG: 10 kN (C), DH: 0, FC: 10.61 kN (T), HC: 60.1 kN (T)

Answer

Zero-force member: DH
5.Shear force & bending moment

Answer: C (x = 4 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 70 kN, R2 = 20 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 140, MC = 160 kN·m, MD = 120, ME = 80, MF = 40, MG = 0

Answer

Mark C: MC = 160 kN·m
6.Shear force & bending moment

Answer: E (x = 8 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 15 kN, R2 = 55 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 20, MC = 20, MD = −20, ME = −80 kN·m, MF = −40, MG = 0

Answer

Mark E: ME = −80 kN·m
7.Beam deflection

Answer: δP = 1.95 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 11000 N, a = 3500 mm, b = 2500 mm, L = 6000 mm
EI = 2.4 × 10¹³ N·mm²

Deflection under the load

δP = Pa²b²/(3EIL) = 11000·3500²·2500²/(3·2.4 × 10¹³·6000) = 1.95 mm

Answer

δP = 1.95 mm
8.Beam deflection

Answer: δmax = 3.052 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 25000 N, w = 4 N/mm, L = 5000 mm, EI = 3.2 × 10¹³ N·mm²

Each load on its own

δP = PL³/(48EI) = 25000·5000³/(48·3.2 × 10¹³) = 2.035 mm
δw = 5wL⁴/(384EI) = 5·4·5000⁴/(384·3.2 × 10¹³) = 1.017 mm

Add them

δmax = 2.035 + 1.017 = 3.052 mm

Answer

δmax = 3.052 mm
9.Column buckling

Answer: Pcr = 640.7 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·60⁴/64 = 636173 mm⁴

Effective length

KL = 0.7·2000 = 1400 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·636173/1400² = 640691 N = 640.7 kN

Answer

Pcr = 640.7 kN
10.Column buckling

Answer: σcr = 126.3 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·40⁴/64 = 125664 mm⁴

Radius of gyration and slenderness

A = 1257 mm²
r = √(I/A) = √(125664/1257) = 10 mm
KL = 0.5·2500 = 1250 mm
KL/r = 1250/10 = 125

Critical stress

σcr = π²E/(KL/r)² = π²·200000/125² = 126.3 MPa

Answer

σcr = 126.3 MPa
11.Centroid & second moment of area

Answer: Ix = 113.4 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (24000·120 − 1257·84)/(24000 − 1257) = 122 mm

Full plate about ȳ

100·240³/12 + 24000·−1.989² = 115.3 × 10⁶ mm⁴

Hole about ȳ

π·40⁴/64 + 1257·−37.99² = 1.939 × 10⁶ mm⁴

Subtract

Ix = 113.4 × 10⁶ mm⁴

Answer

Ix = 113.4 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: Ix = 128.5 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (40000·100 − 2500·140)/(40000 − 2500) = 97.33 mm

Full plate about ȳ

200·200³/12 + 40000·2.667² = 133.6 × 10⁶ mm⁴

Hole about ȳ

50·50³/12 + 2500·42.67² = 5.072 × 10⁶ mm⁴

Subtract

Ix = 128.5 × 10⁶ mm⁴

Answer

Ix = 128.5 × 10⁶ mm⁴
13.Effective stress in soil

Answer: σ′ = 94.57 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 16·4 + 20·3 = 124 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·3 = 29.43 kPa

Effective stress

σ′ = σ − u = 124 − 29.43 = 94.57 kPa

Answer

σ′ = 94.57 kPa
14.Effective stress in soil

Answer: u = 34.34 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·3.5 = 34.34 kPa

Answer

u = 34.34 kPa
15.Consolidation settlement

Answer: S = 18.86 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Preconsolidation pressure

σ′p = OCR·σ′0 = 3·85 = 255 kPa

Compare with the preconsolidation pressure

σ′f = 85 + 160 = 245 kPa ≤ 255 kPa

Settlement

The clay stays on its recompression line.

S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.04·2/(1 + 0.95)·log₁₀(245/85) = 18.86 mm

Answer

S = 18.86 mm
16.Consolidation settlement

Answer: t = 3.64 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H/2 = 8.5/2 = 4.25 m

Time

t = Tv·Hdr²/cv = 0.403·4.25²/2 = 3.64 years

Answer

t = 3.64 years
17.Hydrostatic force

Answer: F = 242.8 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 4 + 3/2 = 5.5 m
A = H·b = 3·1.5 = 4.5 m²
gated = 4 mH = 3 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·5.5·4.5 = 242.8 kN

Answer

F = 242.8 kN
18.Hydrostatic force

Answer: F = 49.05 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1.5 + 2/2 = 2.5 m
A = H·b = 2·1 = 2 m²
gated = 1.5 mH = 2 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2.5·2 = 49.05 kN

Answer

F = 49.05 kN
19.Pipe friction & head loss

Answer: Δp = 109.4 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.03·(300/0.3)·2.7²/(2·9.81) = 11.15 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·11.15 = 109350 Pa = 109.4 kPa

Answer

Δp = 109.4 kPa
20.Pipe friction & head loss

Answer: Δz = 5.735 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.06/0.03142 = 1.91 m/s
V²/(2g) = 0.1859 m

Loss coefficients

f·L/D = 0.025·150/0.2 = 18.75
ΣK = 0.5 + 2·0.3 + 10 + 1.0 = 12.1

Total head loss

hf = 18.75·0.1859 = 3.486 m
hm = 12.1·0.1859 = 2.25 m
Δz = hf + hm = 5.735 m

Answer

Δz = 5.735 m
21.Open-channel flow (Manning)

Answer: Q = 1.145 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = 0.6362 m², R = D/4 = 0.225 m

Velocity

V = (1/0.013)·0.2252/3·0.0041/2 = 1.8 m/s

Flow rate

Q = A·V = 0.6362·1.8 = 1.145 m³/s

Answer

Q = 1.145 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.001407 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (5 + 1.5·1.5)·1.5 = 10.88 m²
P = b + 2y·√(1 + z²) = 5 + 2·1.5·√(1 + 1.5²) = 10.41 m
R = A/P = 1.045 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.03·14/(10.88·1.03) = 0.03751
S = 0.03751² = 0.001407

Answer

S = 0.001407

That is a fall of 1.407 m per kilometre.

23.Pumps & pump power

Answer: Pshaft = 34.41 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.03·76 = 22.37 kW

Shaft power

Pshaft = Ph/η = 22.37/0.65 = 34.41 kW

Answer

Pshaft = 34.41 kW
24.Pumps & pump power

Answer: Pshaft = 27.41 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.08/0.03142 = 2.546 m/s
V²/(2g) = 0.3305 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (13.5 + 6)·0.3305 = 6.445 m

Pump head

H = Δz + hL = 18 + 6.445 = 24.44 m

Shaft power

Pshaft = ρ·g·Q·H/η = 1000·9.81·0.08·24.44/0.7 = 27.41 kW

Answer

Pshaft = 27.41 kW
25.Time value of money

Answer: FV = 3587 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate and number of periods

i = r/m = 0.06/4 = 0.015
N = m·n = 4·3 = 12

Future value

FV = 3 000·(1 + 0.015)12 = 3 000·1.196 = €3 586.85

Answer

FV = €3 586.85
26.Time value of money

Answer: A = 299.8 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly rate and number of deposits

i = 0.042/12 = 0.0035
N = 12·15 = 180

Deposit

A = FV·i/((1 + i)N − 1) = 75 000·0.0035/(1.876 − 1) = €299.81

Answer

A = €299.81
27.NPV & IRR

Answer: NPV = 25000 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Value of the cash flows

PV = 5 000/(0.08 − 0.04) = 125 000.00

NPV

NPV = 125 000.00 − 100 000 = €25 000.00

Answer

NPV = €25 000.00

NPV is positive, so the project earns more than the required return.

28.NPV & IRR

Answer: IRR = 5.405 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Required annuity factor

(1 − (1 + i)−3)/i = 50 000/18 500 = 2.703

Solve for the rate

The annuity factor falls as the rate rises; bracket the rate and narrow down.

i = 5%: 2.723
i = 6%: 2.673
IRR = 5.405%

Answer

IRR = 5.405%
29.Normal distribution

Answer: P = 0.06681

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the total

μT = 400 g, σT = 1.2·√10 = 3.795 g

Standardise

z = (394.3 − 400)/3.795 = −1.5

Probability

P = Φ(−1.5) = 0.06681

Answer

P = 0.06681
30.Normal distribution

Answer: x = 172.1 cm

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left

Φ(z) = 0.2

z from the table

z ≈ −0.84

Back to the original units

x = 178 − 0.84·7 = 172.1 cm

Answer

x = 172.1 cm