laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The beam has a pin at A and a roller at B, 4.5 m from A, and overhangs B to the free end C. Find the vertical reaction RA, taking upward as positive.
AB = 4.5 mAC = 6 mP1 = 45 kN at 4 mP2 = 60 kN at 6 m
RA = kN
2.Beam support reactionsHard
A compound beam is fixed to the wall at A, has an internal hinge at C (4 m from A) and rests on a roller at D (8 m from A). It carries a point load P at 5 m from A, a uniformly distributed load w on the whole part CD. Find the reaction RD at the roller.
AC = 4 mAD = 8 mP = 75 kN at 5 mw = 6 kN/m from 4 to 8 m
RD = kN
3.Truss: method of jointsMedium
Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.
span = 8 mheight = 2 mB is 1 m from Avertical load = 20 kN
FAC = kN
4.Truss: method of jointsHard
Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.
span = 8 mheight = 3 mB is 2 m from Avertical load = 55 kNhorizontal load = 10 kN ←
FAB = kN
5.Shear force & bending momentMedium
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
55 kN @ 6 m12 kN/m, 0–12 m
1A (x = 0 m)
2B (x = 2 m)
3C (x = 4 m)
4D (x = 6 m)
5E (x = 8 m)
6F (x = 10 m)
7G (x = 12 m)
6.Shear force & bending momentHard
Find the bending moment Mx at the section x = 0.5 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 6 mP = 35 kN at 5 mw = 2 kN/m from 0 to 6 mx = 0.5 m
Mx = kN·m
7.Beam deflectionMedium
A cantilever carries a uniformly distributed load w over its whole length. Find the deflection δ at the free end.
w = 6 kN/mL = 5 mE = 200 GPa (steel)I = 36 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.
w = 8 kN/mL = 3 mE = 70 GPa (aluminium)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
A column of length L made of aluminium is fixed at the base and free at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 1 mE = 70 GPa (aluminium)b × h = 30 × 40 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of aluminium is fixed at the base and free at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 2 mE = 70 GPa (aluminium)d = 40 mm
σcr = MPa
11.Centroid & second moment of areaMedium
A symmetric I-section has flanges 140 mm wide and 18 mm thick, an overall depth of 320 mm and a web 8 mm thick. Find its second moment of area Ix about the horizontal centroidal axis x.
B = 140 mmH = 320 mmtf = 18 mmtw = 8 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A 100 mm × 300 mm plate has a rectangular cut-out 60 mm wide and 40 mm high, centred on the vertical centre line with its centre 120 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 100 mmh = 300 mmcut-out: 60 × 40 mmhole centre: y = 120 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
For the soil profile shown, find the vertical effective stress σ′ at point X.
A 4.5 m thick overconsolidated clay layer has Cc = 0.2, Cr = 0.06 and e₀ = 1. At its mid-depth the effective vertical stress is 85 kPa and the preconsolidation pressure is 115 kPa. A new building adds 25 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 3.5 m thick has a coefficient of consolidation cv = 0.8 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 50% average consolidation the time factor is Tv = 0.197. How many years t does the layer take to reach 50% consolidation?
A vertical rectangular gate 1 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 2 m wide sits in the wall of a tank of glycerin, with its top edge 1 m below the surface. Find the depth ycp of the centre of pressure below the surface.
Water flows at 25 L/s through a pipe 1000 m long with an inside diameter of 100 mm. Use the Darcy friction factor f = 0.02 and g = 9.81 m/s². Find the friction head loss hf.
A pipe 150 m long with an inside diameter of 150 mm (Darcy friction factor f = 0.015) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each) and a valve (K = 0.2). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 50 L/s?
A concrete storm sewer with an inside diameter of 750 mm flows half full. Manning n = 0.013 and the slope is S = 0.003. Find the flow rate Q in m³/s.
D = 750 mmn = 0.013S = 0.003
Q = m³/s
22.Open-channel flow (Manning)Hard
A trapezoidal clean earth channel with a bottom width of 1.5 m and side slopes of 1:1 (horizontal:vertical) must carry 16 m³/s in uniform flow at a depth of 2.1 m. Manning n = 0.022. Find the required bed slope S (in m/m).
Q = 16 m³/sb = 1.5 my = 2.1 mz = 1n = 0.022
S = m/m
23.Pumps & pump powerMedium
In a test, a pump delivers 50 L/s of water (ρ = 1000 kg/m³) against a head of 44 m while its shaft takes 36 kW. Use g = 9.81 m/s². Find the pump efficiency η in percent.
Q = 50 L/sH = 44 mPshaft = 36 kWg = 9.81 m/s²
η = %
24.Pumps & pump powerHard
A pump moves 20 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 15 m higher. The pipe is 150 m long with an inside diameter of 100 mm and a Darcy friction factor f = 0.018; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.
A credit card charges a nominal interest rate of 25% per year, compounded monthly. Find the effective annual rate EAR in percent.
r = 25%m = 12
EAR = %
26.Time value of moneyHard
A loan of €20 000 is repaid with equal monthly payments over 4 years. The interest rate is 7.2% per year, compounded monthly. Find the monthly payment A.
P = €20 0007.2% / 12N = 48
A = €
27.NPV & IRRMedium
An investment of €75 000 gives these cash flows at the end of years 1 to 3: €34 000, €35 000, €22 000. The cost of capital is 10%. Find the net present value NPV.
A project costs €40 000 and returns €25 500, €16 000, €22 000 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
CF0 = −40 000CF1 = 25 500CF2 = 16 000CF3 = 22 000
IRR = %
29.Normal distributionMedium
Drag z so that the shaded area under the standard normal curve, to the right of z, is 0.7910. Find z to two decimals.
A = 0.7910
z =
30.Normal distributionHard
The IQ scores are normally distributed with mean 100 points and standard deviation 15 points. Find the value x below which 97.5% of them lie (the 97.5th percentile).
μ = 100σ = 15P = 97.5%
x = points
3Solutions
1.Beam support reactions
Answer: RA = −15 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Moments about A
Counter-clockwise positive.
ΣMA = 0: RB·4.5 = 45·4 + 60·6
RB = 540/4.5 = 120 kN
Vertical equilibrium
RA = 45 + 60 − 120 = −15 kN
Answer
RA = −15 kN
RA is negative: the pin at A has to hold the beam down.
2.Beam support reactions
Answer: RD = 30.75 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation. An internal hinge cannot carry a bending moment, which gives one extra equation: the moment about the hinge of the forces on either side is zero.
Part CD
The hinge has no moment, so moments about C on CD alone must balance.
W = 6·4 = 24 kN at 2 m from C
ΣMC = 0: RD·4 = 75·1 + 24·2
RD = 30.75 kN
VC = 99 − 30.75 = 68.25 kN
Answer
RD = 30.75 kN
3.Truss: method of joints
Answer: FAC = 8.75 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·8 = 20·1 → Cy = 2.5 kN
ΣFy = 0: Ay = 20 − 2.5 = 17.5 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·8 = 55·2 − 10·3 → Cy = 10 kN
ΣFy = 0: Ay = 55 − 10 = 45 kN
ΣFx = 0: Ax = 10 kN
Joint A
Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.
sin α = 3/3.606 = 0.8321
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −45/0.8321 = −54.08 kN
Answer
FAB = −54.08 kN (compression)
5.Shear force & bending moment
Answer: D (x = 6 m)
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 99.5 kN, R2 = 99.5 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = 175, MC = 302, MD = 381 kN·m, ME = 302, MF = 175, MG = 0
Answer
Mark D: MD = 381 kN·m
6.Shear force & bending moment
Answer: Mx = 5.667 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 2·6 = 12 kN, acting at x̄ = 3 m
ΣMA = 0: RB·6 = 35·5 + 2·6·3
RB = 211/6 = 35.17 kN
ΣFy = 0: RA = 47 − 35.17 = 11.83 kN
Cut at x = 0.5 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 11.83·0.5 − 2·0.5·0.25 = 5.667 kN·m
Answer
Mx = 5.667 kN·m
7.Beam deflection
Answer: δ = 65.1 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
w = 6 N/mm, L = 5000 mm
EI = 7.2 × 10¹² N·mm²
Deflection
δ = wL⁴/(8EI) = 6·5000⁴/(8·7.2 × 10¹²) = 65.1 mm
Answer
δ = 65.1 mm
8.Beam deflection
Answer: Ireq = 14.46 × 10⁶ mm⁴
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Deflection limit
δallow = L/360 = 3000/360 = 8.333 mm
Required second moment of area
I = 5wL⁴/(384·E·δallow) = 5·8·3000⁴/(384·70000·8.333) = 1.446 × 10⁷ mm⁴
Ireq = 14.46 × 10⁶ mm⁴
Answer
Ireq = 14.46 × 10⁶ mm⁴
9.Column buckling
Answer: Pcr = 15.54 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·40⁴/64 = 125664 mm⁴
Radius of gyration and slenderness
A = 1257 mm²
r = √(I/A) = √(125664/1257) = 10 mm
KL = 2·2000 = 4000 mm
KL/r = 4000/10 = 400
Critical stress
σcr = π²E/(KL/r)² = π²·70000/400² = 4.318 MPa
Answer
σcr = 4.318 MPa
11.Centroid & second moment of area
Answer: Ix = 130.3 × 10⁶ mm⁴
Second moment of area: for a rectangle about its own centroidal axis I = bh³/12, and about its base bh³/3 (parallel-axis theorem I = Ic + A·d²). A hole is handled by subtracting its I, as long as both parts share the same axis. The elastic section modulus is S = I/c, where c is the distance to the extreme fibre.
Outer rectangle minus the two side cut-outs
Both cut-outs together are (B − tw) wide and hw = H − 2tf high, and share the axis x.
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (30000·150 − 2400·120)/(30000 − 2400) = 152.6 mm
Full plate about ȳ
100·300³/12 + 30000·−2.609² = 225.2 × 10⁶ mm⁴
Hole about ȳ
60·40³/12 + 2400·−32.61² = 2.872 × 10⁶ mm⁴
Subtract
Ix = 222.3 × 10⁶ mm⁴
Answer
Ix = 222.3 × 10⁶ mm⁴
13.Effective stress in soil
Answer: σ′ = 142.2 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·9 = 88.29 kPa
Effective stress
σ′ = σ − u = 230.5 − 88.29 = 142.2 kPa
Answer
σ′ = 142.2 kPa
14.Effective stress in soil
Answer: σ′ = 72.14 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·1 + γsat,sand·2 + γsat,clay·4
σ = 16·1 + 20.5·2 + 18.5·4 = 131 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·6 = 58.86 kPa
Effective stress
σ′ = σ − u = 131 − 58.86 = 72.14 kPa
Answer
σ′ = 72.14 kPa
15.Consolidation settlement
Answer: S = 15.12 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 85 + 25 = 110 kPa ≤ 115 kPa
Settlement
The clay stays on its recompression line.
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.06·4.5/(1 + 1)·log₁₀(110/85) = 15.12 mm
Answer
S = 15.12 mm
16.Consolidation settlement
Answer: t = 0.7541 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H/2 = 3.5/2 = 1.75 m
Time
t = Tv·Hdr²/cv = 0.197·1.75²/0.8 = 0.7541 years
Answer
t = 0.7541 years
17.Hydrostatic force
Answer: F = 88.29 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1.5 + 3/2 = 3 m
A = H·b = 3·1 = 3 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3·3 = 88.29 kN
Answer
F = 88.29 kN
18.Hydrostatic force
Answer: ycp = 1.857 m
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1 + 1.5/2 = 1.75 m
A = H·b = 1.5·2 = 3 m²
Resultant force
F = ρ·g·yc·A = 1260·9.81·1.75·3 = 64.89 kN
Centre of pressure
Pressure grows with depth, so the resultant acts below the centroid.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Mean velocity
A = π·0.1²/4 = 0.007854 m²
V = Q/A = 0.025/0.007854 = 3.183 m/s
Velocity head
V²/(2g) = 3.183²/(2·9.81) = 0.5164 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.02·(1000/0.1)·3.183²/(2·9.81) = 103.3 m
Answer
hf = 103.3 m
20.Pipe friction & head loss
Answer: H = 7.304 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.05/0.01767 = 2.829 m/s
V²/(2g) = 0.408 m
Loss coefficients
f·L/D = 0.015·150/0.15 = 15
ΣK = 0.5 + 4·0.3 + 0.2 = 1.9
Energy equation
The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.
H = (1 + 15 + 1.9)·0.408 = 7.304 m
Answer
H = 7.304 m
21.Open-channel flow (Manning)
Answer: Q = 0.3049 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = 0.2209 m², R = D/4 = 0.1875 m
Velocity
V = (1/0.013)·0.18752/3·0.0031/2 = 1.38 m/s
Flow rate
Q = A·V = 0.2209·1.38 = 0.3049 m³/s
Answer
Q = 0.3049 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.002122 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (1.5 + 1·2.1)·2.1 = 7.56 m²
P = b + 2y·√(1 + z²) = 1.5 + 2·2.1·√(1 + 1²) = 7.44 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.05·44 = 21.58 kW
Efficiency
η = Ph/Pshaft = 21.58/36 = 59.95%
Answer
η = 59.95%
24.Pumps & pump power
Answer: H = 25.91 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are open and practically at rest, so pressure and velocity terms drop out.
H = Δz + hL = 15 + 10.91 = 25.91 m
Answer
H = 25.91 m
25.Time value of money
Answer: EAR = 28.07 %
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rate per period
r/m = 0.25/12 = 0.02083
Compound over one year
EAR = (1 + 0.02083)12 − 1 = 1.281 − 1 = 28.07%
Answer
EAR = 28.07%
The EAR is always above the nominal rate when interest compounds more than once a year.
26.Time value of money
Answer: A = 480.8 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Monthly rate and number of payments
i = 0.07200000000000001/12 = 0.006
N = 12·4 = 48
Payment
The present value of N equal payments A is A·(1 − (1 + i)⁻ᴺ)/i. Set it equal to the loan and solve for A.
(1 + i)−N = 0.7504
A = 20 000·0.006/(1 − 0.7504) = €480.78
Answer
A = €480.78
27.NPV & IRR
Answer: NPV = 1364 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −75 000
CF1/(1 + 0.1)1 = 34 000/1.1 = 30 909.09
CF2/(1 + 0.1)2 = 35 000/1.21 = 28 925.62
CF3/(1 + 0.1)3 = 22 000/1.331 = 16 528.93
Add them up
NPV = €1 363.64
Answer
NPV = €1 363.64
NPV is positive, so the project earns more than the required return.
28.NPV & IRR
Answer: IRR = 28.32 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(25%) = 1 904.00
NPV(30%) = −903.50
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left of z
Φ(z) = 1 − 0.7910 = 0.2090
Read the z-table backwards
Find 0.2090 inside the table and read off z.
z = −0.81
Answer
z = −0.81
30.Normal distribution
Answer: x = 129.4 points
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z for the percentile
Φ(z) = 0.975 → z = 1.96
Back to x
x = 100 + 1.96·15 = 129.4 points
Answer
x = 129.4 points
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.