FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
w = 12 kN/mP = 80 kNABMA​ = ?3.5 m0.5 m

The cantilever beam is fixed to the wall at A. It carries a uniformly distributed load w along its whole length and a point load P at 3.5 m from the wall. Find the magnitude of the reaction moment MA at the wall.

L = 4 mP = 80 kN at 3.5 mw = 12 kN/m from 0 to 4 m
MA = kN·m
2.Beam support reactionsHard
w = 12 kN/mP = 25 kNQ = 70 kNADCMA​ = ?2 m2 m3 m1 m

A compound beam is fixed to the wall at A, has an internal hinge at C (4 m from A) and rests on a roller at D (8 m from A). It carries a point load P at 7 m from A, a uniformly distributed load w on the whole part CD and a point load Q at 2 m from A. Find the magnitude of the reaction moment MA at the wall.

AC = 4 mAD = 8 mP = 25 kN at 7 mw = 12 kN/m from 4 to 8 mQ = 70 kN at 2 m
MA = kN·m
3.Truss: method of jointsMedium
ABBCACACB15 kN8 m7 m3 m

Use the method of joints to find the force FBC in member BC. Give tension as positive and compression as negative.

span = 8 mheight = 3 mB is 7 m from Avertical load = 15 kN
FBC = kN
4.Truss: method of jointsHard
ABCDEFGH30 kN25 kN30 kN20 kN40 kN4 × 3 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 30 kN ↓C: 25 kN ↓D: 30 kN ↓F: 20 kN →H: 40 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
5.Shear force & bending momentMedium
8 kN/m55 kNABCDEFG1 m1 m1 m1 m1 m1 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

55 kN @ 2 m8 kN/m, 0–6 m
  1. 1A (x = 0 m)
  2. 2B (x = 1 m)
  3. 3C (x = 2 m)
  4. 4D (x = 3 m)
  5. 5E (x = 4 m)
  6. 6F (x = 5 m)
  7. 7G (x = 6 m)
6.Shear force & bending momentHard
w = 5 kN/mP = 40 kNABsection4.5 m1.5 m

Find the bending moment Mx at the section x = 4.5 m from support A. Use sagging moments positive and upward shear on the left face positive.

L = 6 mP = 40 kN at 4.5 mw = 5 kN/m from 0 to 6 mx = 4.5 m
Mx = kN·m
7.Beam deflectionMedium
w = 5 kN/mδL = 8 m

A simply supported beam carries a uniformly distributed load w over its whole span. Find the maximum deflection δmax, at midspan.

w = 5 kN/mL = 8 mE = 70 GPa (aluminium)I = 57 × 10⁶ mm⁴
δmax = mm
8.Beam deflectionHard
P = 40 kNAB1.5 m1.5 m

A propped cantilever is fixed at A and simply supported (propped) at B. It carries a point load P at midspan. EI is constant. Find the size of the bending moment MA at the fixed end.

L = 3 mP = 40 kN at 1.5 m
MA = kN·m
9.Column bucklingMedium
PL = 1.5 md = 20 mmcross-section

A column of length L made of steel is fixed at both ends. Using Euler’s formula, find its critical buckling load Pcr.

L = 1.5 mE = 200 GPa (steel)d = 20 mm
Pcr = kN
10.Column bucklingHard
PL = 5 md = 60 mmcross-section

A column of length L made of aluminium is pinned at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 5 mE = 70 GPa (aluminium)d = 60 mm
σcr = MPa
11.Centroid & second moment of areaMedium
xD = 290d = 258dimensions in mm

A circular tube has outside diameter D = 290 mm and inside diameter d = 258 mm. Find its radius of gyration r about the horizontal centroidal axis.

D = 290 mmd = 258 mm
r = mm
12.Centroid & second moment of areaHard
120 mm240 mm168 mm80 × 20xIx​ = ?

A 120 mm × 240 mm plate has a rectangular cut-out 80 mm wide and 20 mm high, centred on the vertical centre line with its centre 168 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 120 mmh = 240 mmcut-out: 80 × 20 mmhole centre: y = 168 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
sandγd​ = 16 kN/m³γsat​ = 18.5 kN/m³13 mwater tableXz = 9 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 9 mzw = 3 mγw = 9.81 kN/m³sand: γd = 16 kN/m³sand: γsat = 18.5 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 15 kN/m³γsat​ = 20.5 kN/m³4 mclayγsat​ = 17.5 kN/m³8 mwater tableXz = 8 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 8 mzw = 3 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 20.5 kN/m³clay: γsat = 17.5 kN/m³
σ′ = kPa
15.Consolidation settlementMedium
Δσ = 100 kPasandclayCc​ = 0.3, Cr​ = 0.02e0​ = 1σ′0​ = 95 kPaσ′p​ = 185 kPa7.5 mwater table

A 7.5 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.02 and e₀ = 1. At its mid-depth the effective vertical stress is 95 kPa and the preconsolidation pressure is 185 kPa. A new building adds 100 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 7.5 mCc = 0.3Cr = 0.02e0 = 1σ′0 = 95 kPaσ′p = 185 kPaΔσ = 100 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 7.5 mcv​ = 4 m²/year7.5 mimpervious rockwater table

A clay layer 7.5 m thick has a coefficient of consolidation cv = 4 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 50% average consolidation the time factor is Tv = 0.197. How many years t does the layer take to reach 50% consolidation?

H = 7.5 mcv = 4 m²/yearU = 50%Tv = 0.197single drainage
t = years
17.Hydrostatic forceMedium
gated = 1 mH = 2 m

A vertical rectangular gate 1 m wide sits in the wall of a tank of water, with its top edge 1 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1 mH = 2 mb = 1 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 0.5 mH = 2 m

A vertical rectangular gate 1.5 m wide sits in the wall of a tank of glycerin, with its top edge 0.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 0.5 mH = 2 mb = 1.5 mρ = 1260 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
V = 1.8 m/sD = 100 mmL = 100 mf = 0.02

Water (ρ = 1000 kg/m³) flows at 1.8 m/s through a horizontal pipe, 100 m long, with an inside diameter of 100 mm. Use the Darcy friction factor f = 0.02 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 1.8 m/sL = 100 mD = 100 mmf = 0.02ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 0.2Δz = ?L = 200 m, D = 150 mm, f = 0.0154× bend (K = 0.3)

Two open reservoirs are joined by a pipe 200 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.015. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each), a valve (K = 0.2) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 20 L/s?

Q = 20 L/sL = 200 mD = 150 mmf = 0.015Kentrance = 0.5Kbend = 0.3 (×4)Kvalve = 0.2Kexit = 1.0
Δz = m
21.Open-channel flow (Manning)Medium
D = 1200 mmn = 0.013, S = 0.004

A concrete storm sewer with an inside diameter of 1200 mm flows just full (as an open channel, not under pressure). Manning n = 0.013 and the slope is S = 0.004. Find the flow rate Q in m³/s.

D = 1200 mmn = 0.013S = 0.004
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 3 my = 1.1 m1 : 1n = 0.03, Q = 4.8 m³/s

A trapezoidal grass-lined earth channel with a bottom width of 3 m and side slopes of 1:1 (horizontal:vertical) must carry 4.8 m³/s in uniform flow at a depth of 1.1 m. Manning n = 0.03. Find the required bed slope S (in m/m).

Q = 4.8 m³/sb = 3 my = 1.1 mz = 1n = 0.03
S = m/m
23.Pumps & pump powerMedium
PQ = 80 L/sH = 14 m

A pump delivers 80 L/s of water (ρ = 1000 kg/m³) against a head of 14 m. The pump efficiency is 85% and the electric motor driving it has an efficiency of 94%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.

Q = 80 L/sH = 14 mηpump = 85%ηmotor = 94%g = 9.81 m/s²
Pel = kW
24.Pumps & pump powerHard
PQ = 75 L/sΔz = 21 mL = 400 m, D = 200 mm, f = 0.025, ΣK = 8

A pump moves 75 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 21 m higher. The pipe is 400 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.025; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.

Q = 75 L/sΔz = 21 mL = 400 mD = 200 mmf = 0.025ΣK = 8
H = m
25.Time value of moneyMedium
years0123…9PV = ?€5 000

You need €5 000 in 9 years. An account pays 4.8% per year, compounded monthly. How much must you deposit today? Find the present value PV.

FV = €5 0004.8% / 12n = 9
PV = €
26.Time value of moneyHard
months0123…48€12 000A?AAA

A loan of €12 000 is repaid with equal monthly payments over 4 years. The interest rate is 6% per year, compounded monthly. Find the monthly payment A.

P = €12 0006% / 12N = 48
A = €
27.NPV & IRRMedium
years0123−60 00020 00017 00029 000

An investment of €60 000 gives these cash flows at the end of years 1 to 3: €20 000, €17 000, €29 000. The cost of capital is 12%. Find the net present value NPV.

r = 12%CF0 = −60 000CF1 = 20 000CF2 = 17 000CF3 = 29 000
NPV = €
28.NPV & IRRHard
r (%)NPVABr* = ?0

Project A costs €20 000 and returns €11 500, €8 000, €4 500 at the end of years 1 to 3. Project B costs €30 000 and returns €8 500, €12 000, €16 500. Find the crossover rate r* at which both projects have the same NPV, in percent.

A: −20 000, 11 500, 8 000, 4 500B: −30 000, 8 500, 12 000, 16 500
r* = %
29.Normal distributionMedium
250.25259P = ?

The bag weights are normally distributed with mean 250 g and standard deviation 5 g. What fraction lies between 250.25 and 259 g? Give P as a decimal.

μ = 250σ = 5x1 = 250.25x2 = 259
P =
30.Normal distributionHard
μ = 65x = ?25%

The exam scores are normally distributed with mean 65 points and standard deviation 10 points. Find the value x below which 25% of them lie (the 25th percentile).

μ = 65σ = 10P = 25%
x = points

3Solutions

1.Beam support reactions

Answer: MA = 376 kN·m

Cantilever equilibrium: a fixed support can push up and also resist rotation, so it gives a vertical reaction RA and a reaction moment MA. ΣFy = 0 gives RA, and moments about the wall give MA = Σ(load × distance from the wall). A distributed load acts as its resultant at the centroid of the load diagram.

Resultant of the distributed load

W = 12·4 = 48 kN, x̄ = 2 m

Moment about the wall

MA = P·a + W·x̄ = 80·3.5 + 48·2 = 376 kN·m

Answer

MA = 376 kN·m
2.Beam support reactions

Answer: MA = 261 kN·m

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation. An internal hinge cannot carry a bending moment, which gives one extra equation: the moment about the hinge of the forces on either side is zero.

Part CD

The hinge has no moment, so moments about C on CD alone must balance.

W = 12·4 = 48 kN at 2 m from C
ΣMC = 0: RD·4 = 25·3 + 48·2
RD = 42.75 kN
VC = 73 − 42.75 = 30.25 kN

Part AC

The hinge force VC acts downward on AC (equal and opposite to its action on CD).

RA = 70 + 30.25 = 100.3 kN
MA = 70·2 + 30.25·4 = 261 kN·m

Answer

MA = 261 kN·m
3.Truss: method of joints

Answer: FBC = −13.83 kN

Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.

ABBCACACB15 kNAy​Cy​

Support reactions

Equilibrium of the whole truss. Moments about A, counter-clockwise positive.

ΣMA = 0: Cy·8 = 15·7 → Cy = 13.13 kN
ΣFy = 0: Ay = 15 − 13.13 = 1.875 kN

Joint C

The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.

sin γ = 3/3.162 = 0.9487, cos γ = 1/3.162 = 0.3162
ΣFy = 0: Cy + FBC·sin γ = 0 → FBC = −13.13/0.9487 = −13.83 kN

Answer

FBC = −13.83 kN (compression)
4.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint G

FG and GH lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 54.37 kN (T), BC: 54.37 kN (T), CD: 59.37 kN (T), DE: 59.37 kN (T), FG: 66.25 kN (C), GH: 66.25 kN (C), AF: 57.29 kN (C), HE: 98.96 kN (C), BF: 30 kN (T), CG: 0, DH: 30 kN (T), FC: 19.79 kN (T), HC: 11.46 kN (T)

Answer

Zero-force member: CG
5.Shear force & bending moment

Answer: C (x = 2 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 60.67 kN, R2 = 42.33 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 56.67, MC = 105.3 kN·m, MD = 91, ME = 68.67, MF = 38.33, MG = 0

Answer

Mark C: MC = 105.3 kN·m
6.Shear force & bending moment

Answer: Mx = 61.88 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 5·6 = 30 kN, acting at x̄ = 3 m
ΣMA = 0: RB·6 = 40·4.5 + 5·6·3
RB = 270/6 = 45 kN
ΣFy = 0: RA = 70 − 45 = 25 kN
w = 5 kN/mP = 40 kNABRA​ = 25RB​ = 45section4.5 m1.5 m

Cut at x = 4.5 m and keep the left part

Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.

M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 25·4.5 − 5·4.5·2.25 = 61.88 kN·m

Answer

Mx = 61.88 kN·m
7.Beam deflection

Answer: δmax = 66.83 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 5 N/mm, L = 8000 mm
EI = 3.99 × 10¹² N·mm²

Deflection

δmax = 5wL⁴/(384EI) = 5·5·8000⁴/(384·3.99 × 10¹²) = 66.83 mm

Answer

δmax = 66.83 mm
8.Beam deflection

Answer: MA = 22.5 kN·m

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).

Remove the prop

Without the prop the beam is a cantilever. Its free end would deflect under the load.

δload = P(L/2)²(3L − L/2)/(6EI) = 5PL³/(48EI)

Compatibility at the prop

The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.

RB·L³/(3EI) = 5PL³/(48EI) → RB = 5P/16 = 5·40/16 = 12.5 kN

Moment at the fixed end

Moments about A of the loads and the prop force.

MA = P·L/2 − RB·L = 60 − 37.5 = 22.5 kN·m

Answer

MA = 22.5 kN·m
9.Column buckling

Answer: Pcr = 27.56 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·20⁴/64 = 7854 mm⁴

Effective length

KL = 0.5·1500 = 750 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·7854/750² = 27561 N = 27.56 kN

Answer

Pcr = 27.56 kN
10.Column buckling

Answer: σcr = 6.218 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·60⁴/64 = 636173 mm⁴

Radius of gyration and slenderness

A = 2827 mm²
r = √(I/A) = √(636173/2827) = 15 mm
KL = 1·5000 = 5000 mm
KL/r = 5000/15 = 333.3

Critical stress

σcr = π²E/(KL/r)² = π²·70000/333.3² = 6.218 MPa

Answer

σcr = 6.218 MPa
11.Centroid & second moment of area

Answer: r = 97.04 mm

Second moment of area: for a rectangle about its own centroidal axis I = bh³/12, and about its base bh³/3 (parallel-axis theorem I = Ic + A·d²). A hole is handled by subtracting its I, as long as both parts share the same axis. The elastic section modulus is S = I/c, where c is the distance to the extreme fibre. The radius of gyration r = √(I/A) is the distance at which the whole area would give the same I; it is used in column buckling.

Net area and second moment of area

A = π(D² − d²)/4 = 13773 mm²
I = π(D⁴ − d⁴)/64 = 1.297 × 10⁸ mm⁴

Radius of gyration

r = √(I/A) = √(1.297 × 10⁸/13773) = 97.04 mm

Answer

r = 97.04 mm
12.Centroid & second moment of area

Answer: Ix = 134.3 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (28800·120 − 1600·168)/(28800 − 1600) = 117.2 mm

Full plate about ȳ

120·240³/12 + 28800·2.824² = 138.5 × 10⁶ mm⁴

Hole about ȳ

80·20³/12 + 1600·50.82² = 4.186 × 10⁶ mm⁴

Subtract

Ix = 134.3 × 10⁶ mm⁴

Answer

Ix = 134.3 × 10⁶ mm⁴
13.Effective stress in soil

Answer: σ′ = 100.1 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 16·3 + 18.5·6 = 159 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·6 = 58.86 kPa

Effective stress

σ′ = σ − u = 159 − 58.86 = 100.1 kPa

Answer

σ′ = 100.1 kPa
14.Effective stress in soil

Answer: σ′ = 86.45 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·3 + γsat,sand·1 + γsat,clay·4
σ = 15·3 + 20.5·1 + 17.5·4 = 135.5 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·5 = 49.05 kPa

Effective stress

σ′ = σ − u = 135.5 − 49.05 = 86.45 kPa

Answer

σ′ = 86.45 kPa
15.Consolidation settlement

Answer: S = 47.43 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 95 + 100 = 195 kPa > 185 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.02·7.5/(1 + 1)·log₁₀(185/95) + 0.3·7.5/(1 + 1)·log₁₀(195/185)
S = 21.71 + 25.72 = 47.43 mm

Answer

S = 47.43 mm
16.Consolidation settlement

Answer: t = 2.77 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H = 7.5 m

Time

t = Tv·Hdr²/cv = 0.197·7.5²/4 = 2.77 years

Answer

t = 2.77 years
17.Hydrostatic force

Answer: F = 39.24 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1 + 2/2 = 2 m
A = H·b = 2·1 = 2 m²
gated = 1 mH = 2 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2·2 = 39.24 kN

Answer

F = 39.24 kN
18.Hydrostatic force

Answer: F = 55.62 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 0.5 + 2/2 = 1.5 m
A = H·b = 2·1.5 = 3 m²
gated = 0.5 mH = 2 mF

Resultant force

F = ρ·g·yc·A = 1260·9.81·1.5·3 = 55.62 kN

Answer

F = 55.62 kN
19.Pipe friction & head loss

Answer: Δp = 32.4 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.02·(100/0.1)·1.8²/(2·9.81) = 3.303 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·3.303 = 32400 Pa = 32.4 kPa

Answer

Δp = 32.4 kPa
20.Pipe friction & head loss

Answer: Δz = 1.495 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.02/0.01767 = 1.132 m/s
V²/(2g) = 0.06529 m

Loss coefficients

f·L/D = 0.015·200/0.15 = 20
ΣK = 0.5 + 4·0.3 + 0.2 + 1.0 = 2.9

Total head loss

hf = 20·0.06529 = 1.306 m
hm = 2.9·0.06529 = 0.1893 m
Δz = hf + hm = 1.495 m

Answer

Δz = 1.495 m
21.Open-channel flow (Manning)

Answer: Q = 2.466 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = 1.131 m², R = D/4 = 0.3 m

Velocity

V = (1/0.013)·0.32/3·0.0041/2 = 2.18 m/s

Flow rate

Q = A·V = 1.131·2.18 = 2.466 m³/s

Answer

Q = 2.466 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.001529 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (3 + 1·1.1)·1.1 = 4.51 m²
P = b + 2y·√(1 + z²) = 3 + 2·1.1·√(1 + 1²) = 6.111 m
R = A/P = 0.738 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.03·4.8/(4.51·0.8166) = 0.0391
S = 0.0391² = 0.001529

Answer

S = 0.001529

That is a fall of 1.529 m per kilometre.

23.Pumps & pump power

Answer: Pel = 13.75 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.08·14 = 10.99 kW

Shaft power

Pshaft = 10.99/0.85 = 12.93 kW

Electrical power

Pel = 12.93/0.94 = 13.75 kW

Answer

Pel = 13.75 kW
24.Pumps & pump power

Answer: H = 37.85 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.075/0.03142 = 2.387 m/s
V²/(2g) = 0.2905 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (50 + 8)·0.2905 = 16.85 m

Pump head

Both surfaces are open and practically at rest, so pressure and velocity terms drop out.

H = Δz + hL = 21 + 16.85 = 37.85 m

Answer

H = 37.85 m
25.Time value of money

Answer: PV = 3249 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate and number of periods

i = 0.048/12 = 0.004
N = 12·9 = 108

Present value

PV = FV/(1 + i)N = 5 000/1.539 = €3 248.85

Answer

PV = €3 248.85
26.Time value of money

Answer: A = 281.8 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly rate and number of payments

i = 0.06/12 = 0.005
N = 12·4 = 48

Payment

The present value of N equal payments A is A·(1 − (1 + i)⁻ᴺ)/i. Set it equal to the loan and solve for A.

(1 + i)−N = 0.7871
A = 12 000·0.005/(1 − 0.7871) = €281.82

Answer

A = €281.82
27.NPV & IRR

Answer: NPV = −7949 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of each cash flow

CF0 = −60 000
CF1/(1 + 0.12)1 = 20 000/1.12 = 17 857.14
CF2/(1 + 0.12)2 = 17 000/1.254 = 13 552.30
CF3/(1 + 0.12)3 = 29 000/1.405 = 20 641.63

Add them up

NPV = €−7 948.93

Answer

NPV = €−7 948.93

NPV is negative, so the project earns less than the required return.

28.NPV & IRR

Answer: r* = 8.594 %

Crossover rate: the discount rate at which two projects have the same NPV. It is the IRR of the difference in their cash flows (B − A). Below it the project with the later, larger cash flows has the higher NPV; above it the other one wins.

Difference in cash flows

ΔCF0 = −30 000 − (−20 000) = −10 000
ΔCF1 = 8 500 − 11 500 = −3 000
ΔCF2 = 12 000 − 8 000 = 4 000
ΔCF3 = 16 500 − 4 500 = 12 000

IRR of the difference

NPVΔ(8%) = 177.56
NPVΔ(9%) = −119.37
r* = 8.594%

Answer

r* = 8.594%

Check: at 8.594% both NPVs are €887.86.

29.Normal distribution

Answer: P = 0.4441

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z-scores

z₁ = (250.25 − 250)/5 = 0.05
z₂ = (259 − 250)/5 = 1.8

Area between

P = Φ(1.8) − Φ(0.05) = 0.9641 − 0.5199 = 0.4441

Answer

P = 0.4441
30.Normal distribution

Answer: x = 58.26 points

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z for the percentile

Φ(z) = 0.25 → z = −0.6745

Back to x

x = 65 + −0.6745·10 = 58.26 points

Answer

x = 58.26 points