laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam (pin at A, roller at B) carries a linearly varying load that rises from zero at A to 8 kN/m at B. A point load P also acts at 1 m from A. Find the vertical support reaction RA.
L = 8 mw0 = 8 kN/mP = 30 kN at 1 m
RA = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 5 mP = 25 kN at 4 mw = 8 kN/m from 1 to 3 m
RB = kN
3.Truss: method of jointsMedium
Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.
span = 4 mheight = 2 mB is 1 m from Avertical load = 20 kN
FAB = kN
4.Truss: method of jointsHard
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
The beam rests on a pin at A and a roller at B and overhangs B by 1 m to the free end C. It carries a point load P1 between the supports and a point load P2 at C. Find the shear force Vx just to the left of support B. Use sagging moments positive and upward shear on the left face positive.
L = 9 mP1 = 35 kN at 1 mP2 = 35 kN at 9 msupports at x = 0 and x = 8 m
Vx = kN
6.Shear force & bending momentHard
Find the bending moment Mx at the section x = 3 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 4 mP = 20 kN at 3 mw = 3 kN/m from 0 to 4 mx = 3 m
Mx = kN·m
7.Beam deflectionMedium
A simply supported beam carries a uniformly distributed load w over its whole span. Find the maximum deflection δmax, at midspan.
w = 5 kN/mL = 5 mE = 200 GPa (steel)I = 12 × 10⁶ mm⁴
δmax = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.
w = 6 kN/mL = 4 mE = 200 GPa (steel)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
A column of length L made of steel is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 1 mE = 200 GPa (steel)d = 20 mm
Pcr = kN
10.Column bucklingHard
A solid round column of length L made of steel is pinned at both ends. It must carry 150 kN with a factor of safety of 3 against buckling. Find the smallest diameter d.
P = 150 kNn = 3L = 2 mE = 200 GPa (steel)
d = mm
11.Centroid & second moment of areaMedium
Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.
bf = 280 mmtf = 20 mmtw = 20 mmhw = 220 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A cast-iron beam has the T-section shown, with the flange on top. The allowable stresses are 40 MPa in tension and 100 MPa in compression. Find the largest sagging bending moment Mallow the beam can carry.
A 5.5 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.05 and e₀ = 0.6. At its mid-depth the effective vertical stress is 85 kPa and the preconsolidation pressure is 205 kPa. A new building adds 85 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 8.5 m thick has a coefficient of consolidation cv = 2.5 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?
A vertical rectangular gate 1 m wide sits in the wall of a tank of water, with its top edge 3 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 1.5 m wide sits in the wall of a tank of water, with its top edge 2.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.
Water flows at 150 L/s through a pipe 200 m long with an inside diameter of 250 mm. Use the Darcy friction factor f = 0.03 and g = 9.81 m/s². Find the friction head loss hf.
Two open reservoirs are joined by a pipe 300 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.02. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each), a valve (K = 0.2) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 100 L/s?
A concrete storm sewer with an inside diameter of 300 mm flows just full (as an open channel, not under pressure). Manning n = 0.013 and the slope is S = 0.002. Find the flow rate Q in m³/s.
D = 300 mmn = 0.013S = 0.002
Q = m³/s
22.Open-channel flow (Manning)Hard
A trapezoidal brickwork channel with a bottom width of 2 m and side slopes of 3:1 (horizontal:vertical) must carry 6.6 m³/s in uniform flow at a depth of 0.8 m. Manning n = 0.015. Find the required bed slope S (in m/m).
Q = 6.6 m³/sb = 2 my = 0.8 mz = 3n = 0.015
S = m/m
23.Pumps & pump powerMedium
A pump delivers 20 L/s of water (ρ = 1000 kg/m³) against a head of 28 m. The pump efficiency is 70% and the electric motor driving it has an efficiency of 92%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.
A pump moves 40 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 19 m higher. The pipe is 100 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.025; the minor-loss coefficients add up to ΣK = 5 (entrance and exit included). Use g = 9.81 m/s². The pump efficiency is 65%. Find the shaft power Pshaft in kW.
You need €15 000 in 9 years. An account pays 4.8% per year, compounded quarterly. How much must you deposit today? Find the present value PV.
FV = €15 0004.8% / 4n = 9
PV = €
26.Time value of moneyHard
You save €200 at the end of every month for 20 years. The account pays 4.8% per year, compounded monthly. How much have you saved at the end? Find FV.
A = €2004.8% / 12N = 240
FV = €
27.NPV & IRRMedium
An investment of €60 000 gives these cash flows at the end of years 1 to 3: €22 000, €22 000, €17 000. The cost of capital is 15%. Find the net present value NPV.
A project costs €50 000 today. Its cash flow is €8 500 at the end of year 1 and grows by 3% per year until the last cash flow at the end of year 6. The cost of capital is 12%. Find the net present value NPV.
C0 = €50 000CF1 = €8 500g = 3%n = 6r = 12%
NPV = €
29.Normal distributionMedium
The masses of boxes are independent and normal with mean 12 kg and standard deviation 0.8 kg. Find the probability P that the total mass of 10 of them exceeds 125.1 kg. Round z to two decimals.
μ = 12 kgσ = 0.8 kgn = 10> 125.1 kg
P =
30.Normal distributionHard
The mass X of a product from line 1 and Y from line 2 are independent and normal: X has mean 500 g and standard deviation 8 g, Y has mean 490 g and standard deviation 6 g. Find the probability P that X is greater than Y. Round z to two decimals.
μX = 500 g, σX = 8 gμY = 490 g, σY = 6 g
P =
3Solutions
1.Beam support reactions
Answer: RA = 36.92 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Resultant of the triangular load
W = ½·8·8 = 32 kN
x̄ = 2L/3 = 5.333 m
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·8 = 32·5.333 + 30·1
RB = 25.08 kN
RA = 62 − 25.08 = 36.92 kN
Answer
RA = 36.92 kN
2.Beam support reactions
Answer: RB = 26.4 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
UDL resultant: W = w·ℓ = 8·2 = 16 kN, acting at x̄ = 2 m
ΣMA = 0: RB·5 = 25·4 + 8·2·2
RB = 132/5 = 26.4 kN
ΣFy = 0: RA = 41 − 26.4 = 14.6 kN
Answer
RB = 26.4 kN
3.Truss: method of joints
Answer: FAB = −16.77 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·4 = 20·1 → Cy = 5 kN
ΣFy = 0: Ay = 20 − 5 = 15 kN
Joint A
Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.
sin α = 2/2.236 = 0.8944
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −15/0.8944 = −16.77 kN
Answer
FAB = −16.77 kN (compression)
4.Truss: method of joints
Answer: member CG
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint C
BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.
ΣF⊥ = 0 → FCG = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam. The overhang load also acts about A.
ΣMA = 0: RB·8 = 35·1 + 35·9
RB = 350/8 = 43.75 kN
ΣFy = 0: RA = 70 − 43.75 = 26.25 kN
Cut just left of B and keep the left part
Vx = RA − P1 = 26.25 − 35 = −8.75 kN
Answer
Vx = −8.75 kN
6.Shear force & bending moment
Answer: Mx = 19.5 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 3·4 = 12 kN, acting at x̄ = 2 m
ΣMA = 0: RB·4 = 20·3 + 3·4·2
RB = 84/4 = 21 kN
ΣFy = 0: RA = 32 − 21 = 11 kN
Cut at x = 3 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 11·3 − 3·3·1.5 = 19.5 kN·m
Answer
Mx = 19.5 kN·m
7.Beam deflection
Answer: δmax = 16.95 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
w = 5 N/mm, L = 5000 mm
EI = 2.4 × 10¹² N·mm²
Deflection
δmax = 5wL⁴/(384EI) = 5·5·5000⁴/(384·2.4 × 10¹²) = 16.95 mm
Answer
δmax = 16.95 mm
8.Beam deflection
Answer: Ireq = 9 × 10⁶ mm⁴
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Deflection limit
δallow = L/360 = 4000/360 = 11.11 mm
Required second moment of area
I = 5wL⁴/(384·E·δallow) = 5·6·4000⁴/(384·200000·11.11) = 9 × 10⁶ mm⁴
Ireq = 9 × 10⁶ mm⁴
Answer
Ireq = 9 × 10⁶ mm⁴
9.Column buckling
Answer: Pcr = 31.64 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Required critical load
Pcr = n·P = 3·150000 = 450000 N
KL = 1·2000 = 2000 mm
Solve for the diameter
d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·450000·2000²/(π³·200000))^(1/4) = 65.65 mm
Answer
d = 65.65 mm
Check: the slenderness KL/r is 121.9, so the column is slender and Euler applies.
11.Centroid & second moment of area
Answer: Ix = 53.41 × 10⁶ mm⁴
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 280·20 = 5600 mm², yf = 220 + 20/2 = 230 mm
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Sagging: the top is in compression, the bottom in tension.
top edge: M = 100·4.051 × 10⁷/78.19 = 51.81 kN·m
bottom edge: M = 40·4.051 × 10⁷/176.8 = 9.166 kN·m
Governing value
Mallow = min = 9.166 kN·m (bottom edge)
Answer
Mallow = 9.166 kN·m
13.Effective stress in soil
Answer: σ′ = 63.45 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·5 = 49.05 kPa
Effective stress
σ′ = σ − u = 112.5 − 49.05 = 63.45 kPa
Answer
σ′ = 63.45 kPa
14.Effective stress in soil
Answer: σ = 111.5 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·1 + γsat,sand·2 + γsat,clay·3
σ = 17·1 + 19.5·2 + 18.5·3 = 111.5 kPa
Answer
σ = 111.5 kPa
15.Consolidation settlement
Answer: S = 51.74 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 85 + 85 = 170 kPa ≤ 205 kPa
Settlement
The clay stays on its recompression line.
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.05·5.5/(1 + 0.6)·log₁₀(170/85) = 51.74 mm
Answer
S = 51.74 mm
16.Consolidation settlement
Answer: t = 8.294 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H = 8.5 m
Time
t = Tv·Hdr²/cv = 0.287·8.5²/2.5 = 8.294 years
Answer
t = 8.294 years
17.Hydrostatic force
Answer: F = 104.2 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 3 + 2.5/2 = 4.25 m
A = H·b = 2.5·1 = 2.5 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·4.25·2.5 = 104.2 kN
Answer
F = 104.2 kN
18.Hydrostatic force
Answer: ycp = 3.028 m
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 2.5 + 1/2 = 3 m
A = H·b = 1·1.5 = 1.5 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3·1.5 = 44.15 kN
Centre of pressure
Pressure grows with depth, so the resultant acts below the centroid.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Mean velocity
A = π·0.25²/4 = 0.04909 m²
V = Q/A = 0.15/0.04909 = 3.056 m/s
Velocity head
V²/(2g) = 3.056²/(2·9.81) = 0.4759 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.03·(200/0.25)·3.056²/(2·9.81) = 11.42 m
Answer
hf = 11.42 m
20.Pipe friction & head loss
Answer: Δz = 2.305 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.1/0.07069 = 1.415 m/s
V²/(2g) = 0.102 m
Loss coefficients
f·L/D = 0.02·300/0.3 = 20
ΣK = 0.5 + 3·0.3 + 0.2 + 1.0 = 2.6
Total head loss
hf = 20·0.102 = 2.04 m
hm = 2.6·0.102 = 0.2652 m
Δz = hf + hm = 2.305 m
Answer
Δz = 2.305 m
21.Open-channel flow (Manning)
Answer: Q = 0.04325 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = 0.07069 m², R = D/4 = 0.075 m
Velocity
V = (1/0.013)·0.0752/3·0.0021/2 = 0.6118 m/s
Flow rate
Q = A·V = 0.07069·0.6118 = 0.04325 m³/s
Answer
Q = 0.04325 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.002001 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (2 + 3·0.8)·0.8 = 3.52 m²
P = b + 2y·√(1 + z²) = 2 + 2·0.8·√(1 + 3²) = 7.06 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.02·28 = 5.494 kW
Shaft power
Pshaft = 5.494/0.7 = 7.848 kW
Electrical power
Pel = 7.848/0.92 = 8.53 kW
Answer
Pel = 8.53 kW
24.Pumps & pump power
Answer: Pshaft = 14.89 kW
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rate and number of periods
i = 0.048/4 = 0.012
N = 4·9 = 36
Present value
PV = FV/(1 + i)N = 15 000/1.536 = €9 763.21
Answer
PV = €9 763.21
26.Time value of money
Answer: FV = 80335 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
You paid in €48 000 yourself; the rest is interest.
27.NPV & IRR
Answer: NPV = −13057 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −60 000
CF1/(1 + 0.15)1 = 22 000/1.15 = 19 130.43
CF2/(1 + 0.15)2 = 22 000/1.322 = 16 635.16
CF3/(1 + 0.15)3 = 17 000/1.521 = 11 177.78
Add them up
NPV = €−13 056.63
Answer
NPV = €−13 056.63
NPV is negative, so the project earns less than the required return.
28.NPV & IRR
Answer: NPV = −12689 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of the growing annuity
((1.03)/(1.12))6 = 0.6049
PV = 8 500/(0.12 − 0.03)·(1 − 0.6049) = 37 310.84
NPV
NPV = 37 310.84 − 50 000 = −€12 689.16
Answer
NPV = −€12 689.16
NPV is negative, so the project earns less than the required return.
29.Normal distribution
Answer: P = 0.02169
Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).
Distribution of the total
μT = 120 kg, σT = 0.8·√10 = 2.53 kg
Standardise
z = (125.1 − 120)/2.53 = 2.02
Probability
P = 1 − Φ(2.02) = 0.02169
Answer
P = 0.02169
30.Normal distribution
Answer: P = 0.8413
Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).
Distribution of the difference
μ = 500 − 490 = 10 g, σ = 10 g
Standardise
z = (0 − 10)/10 = −1
Probability
P = 1 − Φ(−1) = 0.8413
Answer
P = 0.8413
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.