laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 6 mP1 = 60 kN at 1 mP2 = 10 kN at 2 m
RB = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. A load P acts at 2.5 m from A, inclined at 30° to the horizontal, and a vertical load Q acts at 1 m from A. Find the magnitude of the total reaction force RA at the pin A.
L = 4 mP = 30 kN at 2.5 m, θ = 30°Q = 30 kN at 1 m
RA = kN
3.Truss: method of jointsMedium
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
C: 40 kN ↓D: 25 kN ↓G: 35 kN ↓H: 40 kN ↓
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member FC
13member HC
4.Truss: method of jointsHard
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
D: 15 kN ↓F: 25 kN ↓F: 15 kN →G: 35 kN ↓
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member FC
13member HC
5.Shear force & bending momentMedium
Find the shear force Vx at the section x = 1.5 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 4 mw = 10 kN/m from 0 to 4 mx = 1.5 m
Vx = kN
6.Shear force & bending momentHard
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
30 kN @ 0 m50 kN @ 6 m60 kN @ 2 m
1A (x = 0 m)
2B (x = 1 m)
3C (x = 2 m)
4D (x = 3 m)
5E (x = 4 m)
6F (x = 5 m)
7G (x = 6 m)
7.Beam deflectionMedium
A simply supported beam carries a point load P at a = 2 m from support A. Find the deflection δP under the load.
P = 25 kNa = 2 mL = 3 mE = 11 GPa (timber)I = 120 × 10⁶ mm⁴
δP = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.
w = 4 kN/mL = 4 mE = 11 GPa (timber)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
A column of length L made of steel is pinned at both ends. Using Euler’s formula, find its critical buckling load Pcr.
L = 2 mE = 200 GPa (steel)d = 80 mm
Pcr = kN
10.Column bucklingHard
A solid round column of length L made of steel is fixed at both ends. It must carry 100 kN with a factor of safety of 2.5 against buckling. Find the smallest diameter d.
P = 100 kNn = 2.5L = 2.5 mE = 200 GPa (steel)
d = mm
11.Centroid & second moment of areaMedium
A 120 mm × 150 mm plate has a circular hole of diameter 50 mm on its vertical centre line, with its centre 105 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 120 mmh = 150 mmd = 50 mmhole centre: y = 105 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A symmetric I-section has flanges 200 mm wide and 12 mm thick, an overall depth of 380 mm and a web 8 mm thick. It carries a bending moment of 150 kN·m about the axis x. Find the size of the maximum bending stress σmax in the section.
A 4.5 m thick overconsolidated clay layer has Cc = 0.25, Cr = 0.04 and e₀ = 0.85. At its mid-depth the effective vertical stress is 100 kPa and the preconsolidation pressure is 180 kPa. A new building adds 75 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
In a laboratory oedometer test, a clay specimen 25 mm thick, drained at the top and bottom, reaches 50% consolidation in 10 min. In the field the same clay forms a layer 9.5 m thick. It lies on impervious rock, with sand above it, so water drains out only at the top. How many days t does the field layer take to reach 50% consolidation?
A vertical rectangular gate 1 m wide sits in the wall of a tank of water, with its top edge 4 m below the surface. Find the resultant hydrostatic force F on the gate.
d = 4 mH = 1 mb = 1 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 2.5 m below the surface. Find the resultant hydrostatic force F on the gate.
Water (ρ = 1000 kg/m³) flows at 1.3 m/s through a horizontal pipe, 400 m long, with an inside diameter of 100 mm. Use the Darcy friction factor f = 0.02 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.
A pipe 100 m long with an inside diameter of 250 mm (Darcy friction factor f = 0.022) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each) and a valve (K = 10). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 60 L/s?
A concrete storm sewer with an inside diameter of 600 mm flows just full (as an open channel, not under pressure). Manning n = 0.013 and the slope is S = 0.0008. Find the flow rate Q in m³/s.
D = 600 mmn = 0.013S = 0.0008
Q = m³/s
22.Open-channel flow (Manning)Hard
A concrete sewer with an inside diameter of 250 mm (Manning n = 0.013) must reach a self-cleansing velocity of 0.9 m/s when flowing just full. Find the minimum slope S (in m/m).
D = 250 mmn = 0.013V = 0.9 m/s
S = m/m
23.Pumps & pump powerMedium
A pump delivers 150 L/s of water (ρ = 1000 kg/m³) against a head of 32 m. The pump efficiency is 80% and the electric motor driving it has an efficiency of 92%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.
A pump moves 15 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 8 m higher. The pipe is 200 m long with an inside diameter of 100 mm and a Darcy friction factor f = 0.025; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 150 kPa. Find the head H the pump must add.
You need €15 000 in 4 years. An account pays 3.6% per year, compounded quarterly. How much must you deposit today? Find the present value PV.
FV = €15 0003.6% / 4n = 4
PV = €
26.Time value of moneyHard
A loan of €200 000 is repaid with equal monthly payments over 20 years. The interest rate is 2.4% per year, compounded monthly. Find the monthly payment A.
P = €200 0002.4% / 12N = 240
A = €
27.NPV & IRRMedium
An investment of €30 000 gives these cash flows at the end of years 1 to 3: €6 000, €12 000, €8 000. The cost of capital is 6%. Find the net present value NPV.
Project A costs €20 000 and returns €11 500, €8 000, €4 000 at the end of years 1 to 3. Project B costs €25 000 and returns €6 500, €10 500, €13 000. Find the crossover rate r* at which both projects have the same NPV, in percent.
Drag z so that the shaded area between −z and z under the standard normal curve is 0.8690. Find z to two decimals.
A = 0.8690
z =
30.Normal distributionHard
The IQ scores are normally distributed with mean 100 points and standard deviation 15 points. Drag the cut-off so the shaded top 5% is to the right of it. Find the cut-off x.
μ = 100 pointsσ = 15 points5%
x = points
3Solutions
1.Beam support reactions
Answer: RB = 13.33 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·6 = 60·1 + 10·2
RB = 80/6 = 13.33 kN
ΣFy = 0: RA = 70 − 13.33 = 56.67 kN
Answer
RB = 13.33 kN
2.Beam support reactions
Answer: RA = 38.29 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Components of P
Pv = 30·sin 30° = 15 kN
Ph = 30·cos 30° = 25.98 kN
Reactions
ΣMA = 0: RB·4 = 15·2.5 + 30·1 → RB = 16.88 kN
Ay = 15 + 30 − 16.88 = 28.13 kN
Ax = Ph = 25.98 kN
Resultant at A
RA = √(25.98² + 28.13²) = 38.29 kN
Answer
RA = 38.29 kN
3.Truss: method of joints
Answer: member BF
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint B
AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.
ΣF⊥ = 0 → FBF = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint B
AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.
ΣF⊥ = 0 → FBF = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 10·4 = 40 kN, acting at x̄ = 2 m
ΣMA = 0: RB·4 = 10·4·2
RB = 80/4 = 20 kN
ΣFy = 0: RA = 40 − 20 = 20 kN
Cut at x = 1.5 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
V = RA − (all downward loads left of the cut)
Vx = 20 − 10·1.5 = 5 kN
Answer
Vx = 5 kN
6.Shear force & bending moment
Answer: E (x = 4 m)
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 46.67 kN, R2 = 93.33 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = −30, MC = −13.33, MD = −56.67, ME = −100 kN·m, MF = −50, MG = 0
Answer
Mark E: ME = −100 kN·m
7.Beam deflection
Answer: δP = 8.418 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 25000 N, a = 2000 mm, b = 1000 mm, L = 3000 mm
EI = 1.32 × 10¹² N·mm²
Deflection under the load
δP = Pa²b²/(3EIL) = 25000·2000²·1000²/(3·1.32 × 10¹²·3000) = 8.418 mm
Answer
δP = 8.418 mm
8.Beam deflection
Answer: Ireq = 109.1 × 10⁶ mm⁴
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Deflection limit
δallow = L/360 = 4000/360 = 11.11 mm
Required second moment of area
I = 5wL⁴/(384·E·δallow) = 5·4·4000⁴/(384·11000·11.11) = 1.091 × 10⁸ mm⁴
Ireq = 109.1 × 10⁶ mm⁴
Answer
Ireq = 109.1 × 10⁶ mm⁴
9.Column buckling
Answer: Pcr = 992.2 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Required critical load
Pcr = n·P = 2.5·100000 = 250000 N
KL = 0.5·2500 = 1250 mm
Solve for the diameter
d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·250000·1250²/(π³·200000))^(1/4) = 44.81 mm
Answer
d = 44.81 mm
Check: the slenderness KL/r is 111.6, so the column is slender and Euler applies.
11.Centroid & second moment of area
Answer: Ix = 31.46 × 10⁶ mm⁴
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (18000·75 − 1963·105)/(18000 − 1963) = 71.33 mm
Full plate about ȳ
120·150³/12 + 18000·3.673² = 33.99 × 10⁶ mm⁴
Hole about ȳ
π·50⁴/64 + 1963·33.67² = 2.533 × 10⁶ mm⁴
Subtract
Ix = 31.46 × 10⁶ mm⁴
Answer
Ix = 31.46 × 10⁶ mm⁴
12.Centroid & second moment of area
Answer: σmax = 147.9 MPa
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Outer rectangle minus the two side cut-outs
Both cut-outs together are (B − tw) wide and hw = H − 2tf high, and share the axis x.
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·zw + γsat·(z − zw) = 16·3 + 20·5 = 148 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·5 = 49.05 kPa
Effective stress
σ′ = σ − u = 148 − 49.05 = 98.95 kPa
Answer
σ′ = 98.95 kPa
14.Effective stress in soil
Answer: u = 44.15 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·4.5 = 44.15 kPa
Answer
u = 44.15 kPa
15.Consolidation settlement
Answer: S = 23.65 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 100 + 75 = 175 kPa ≤ 180 kPa
Settlement
The clay stays on its recompression line.
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.04·4.5/(1 + 0.85)·log₁₀(175/100) = 23.65 mm
Answer
S = 23.65 mm
16.Consolidation settlement
Answer: t = 4011 days
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage paths
Hdr,lab = 25/2 = 12.5 mm = 0.0125 m
Hdr,field = 9.5 m
Scale the time
t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.
tfield = 10·(9.5/0.0125)² = 5.776 × 10⁶ min
tfield = 5.776 × 10⁶/1440 = 4011 days
Answer
t = 4011 days
17.Hydrostatic force
Answer: F = 44.15 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 4 + 1/2 = 4.5 m
A = H·b = 1·1 = 1 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·4.5·1 = 44.15 kN
Answer
F = 44.15 kN
18.Hydrostatic force
Answer: F = 95.65 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 2.5 + 1.5/2 = 3.25 m
A = H·b = 1.5·2 = 3 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3.25·3 = 95.65 kN
Answer
F = 95.65 kN
19.Pipe friction & head loss
Answer: Δp = 67.6 kPa
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Head loss
hf = f·(L/D)·V²/(2g) = 0.02·(400/0.1)·1.3²/(2·9.81) = 6.891 m
Pressure drop
The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.06/0.04909 = 1.222 m/s
V²/(2g) = 0.07615 m
Loss coefficients
f·L/D = 0.022·100/0.25 = 8.8
ΣK = 0.5 + 4·0.3 + 10 = 11.7
Energy equation
The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.
H = (1 + 8.8 + 11.7)·0.07615 = 1.637 m
Answer
H = 1.637 m
21.Open-channel flow (Manning)
Answer: Q = 0.1737 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = 0.2827 m², R = D/4 = 0.15 m
Velocity
V = (1/0.013)·0.152/3·0.00081/2 = 0.6142 m/s
Flow rate
Q = A·V = 0.2827·0.6142 = 0.1737 m³/s
Answer
Q = 0.1737 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.005519 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Hydraulic radius
R = D/4 = 0.25/4 = 0.0625 m
Solve Manning for S
S = (n·V/R2/3)² = (0.013·0.9/0.1575)² = 0.005519
Answer
S = 0.005519
That is a fall of 5.519 m per kilometre.
23.Pumps & pump power
Answer: Pel = 63.98 kW
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.15·32 = 47.09 kW
Shaft power
Pshaft = 47.09/0.8 = 58.86 kW
Electrical power
Pel = 58.86/0.92 = 63.98 kW
Answer
Pel = 63.98 kW
24.Pumps & pump power
Answer: H = 34.07 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are practically at rest, so there is no velocity head term.
H = Δz + p/(ρ·g) + hL = 8 + 15.29 + 10.78 = 34.07 m
Answer
H = 34.07 m
25.Time value of money
Answer: PV = 12997 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rate and number of periods
i = 0.036000000000000004/4 = 0.009
N = 4·4 = 16
Present value
PV = FV/(1 + i)N = 15 000/1.154 = €12 996.69
Answer
PV = €12 996.69
26.Time value of money
Answer: A = 1050 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Monthly rate and number of payments
i = 0.024/12 = 0.002
N = 12·20 = 240
Payment
The present value of N equal payments A is A·(1 − (1 + i)⁻ᴺ)/i. Set it equal to the loan and solve for A.
(1 + i)−N = 0.6191
A = 200 000·0.002/(1 − 0.6191) = €1 050.09
Answer
A = €1 050.09
27.NPV & IRR
Answer: NPV = −6943 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −30 000
CF1/(1 + 0.06)1 = 6 000/1.06 = 5 660.38
CF2/(1 + 0.06)2 = 12 000/1.124 = 10 679.96
CF3/(1 + 0.06)3 = 8 000/1.191 = 6 716.95
Add them up
NPV = €−6 942.71
Answer
NPV = €−6 942.71
NPV is negative, so the project earns less than the required return.
28.NPV & IRR
Answer: r* = 6.307 %
Crossover rate: the discount rate at which two projects have the same NPV. It is the IRR of the difference in their cash flows (B − A). Below it the project with the later, larger cash flows has the higher NPV; above it the other one wins.
Difference in cash flows
ΔCF0 = −25 000 − (−20 000) = −5 000
ΔCF1 = 6 500 − 11 500 = −5 000
ΔCF2 = 10 500 − 8 000 = 2 500
ΔCF3 = 13 000 − 4 000 = 9 000
IRR of the difference
NPVΔ(6%) = 64.58
NPVΔ(7%) = −142.62
r* = 6.307%
Answer
r* = 6.307%
Check: at 6.307% both NPVs are €1 225.95.
29.Normal distribution
Answer: z = 1.51
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left of z
Φ(z) = (1 + 0.8690)/2 = 0.9345
Read the z-table backwards
Find 0.9345 inside the table and read off z.
z = 1.51
Answer
z = 1.51
30.Normal distribution
Answer: x = 124.6 points
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left
Φ(z) = 0.95
z from the table
z ≈ 1.64
Back to the original units
x = 100 + 1.64·15 = 124.6 points
Answer
x = 124.6 points
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.