laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 5 mP1 = 50 kN at 1.5 mP2 = 60 kN at 2 m
RB = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 8 mP = 50 kN at 7 mw = 3 kN/m from 6 to 8 m
RB = kN
3.Truss: method of jointsMedium
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
B: 25 kN ↓F: 40 kN ↓G: 25 kN ↓
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member BG
13member DG
4.Truss: method of jointsHard
Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.
span = 8 mheight = 3 mB is 6 m from Avertical load = 55 kNhorizontal load = 5 kN ←
FAB = kN
5.Shear force & bending momentMedium
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
50 kN @ 4 m6 kN/m, 0–12 m
1A (x = 0 m)
2B (x = 2 m)
3C (x = 4 m)
4D (x = 6 m)
5E (x = 8 m)
6F (x = 10 m)
7G (x = 12 m)
6.Shear force & bending momentHard
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
20 kN @ 0 m35 kN @ 12 m60 kN @ 6 m
1A (x = 0 m)
2B (x = 2 m)
3C (x = 4 m)
4D (x = 6 m)
5E (x = 8 m)
6F (x = 10 m)
7G (x = 12 m)
7.Beam deflectionMedium
A cantilever carries a uniformly distributed load w over its whole length. Find the deflection δ at the free end.
w = 8 kN/mL = 3 mE = 11 GPa (timber)I = 120 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
A propped cantilever is fixed at A and simply supported (propped) at B. It carries a uniformly distributed load w over its whole length. EI is constant. Find the reaction RB at the prop.
L = 3 mw = 4 kN/m
RB = kN
9.Column bucklingMedium
A column of length L made of aluminium is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 2 mE = 70 GPa (aluminium)d = 60 mm
Pcr = kN
10.Column bucklingHard
A solid round column of length L made of steel is pinned at both ends. It must carry 125 kN with a factor of safety of 2 against buckling. Find the smallest diameter d.
P = 125 kNn = 2L = 1.5 mE = 200 GPa (steel)
d = mm
11.Centroid & second moment of areaMedium
A 150 mm × 150 mm plate has a circular hole of diameter 60 mm on its vertical centre line, with its centre 60 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 150 mmh = 150 mmd = 60 mmhole centre: y = 60 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
The T-section is used as a beam with the flange on top and carries a sagging bending moment of 50 kN·m. Find the size of the bending stress σtop at the top edge.
A 2.5 m thick overconsolidated clay layer has Cc = 0.4, Cr = 0.03 and e₀ = 0.9. At its mid-depth the effective vertical stress is 80 kPa and the overconsolidation ratio is OCR = 2. A new building adds 190 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 5.5 m thick has a coefficient of consolidation cv = 0.8 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 70% average consolidation the time factor is Tv = 0.403. How many years t does the layer take to reach 70% consolidation?
A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 3 m below the surface. Find the resultant hydrostatic force F on the gate.
d = 3 mH = 3 mb = 3 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
A vertical rectangular gate 1.5 m wide sits in the wall of a tank of seawater, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.
Water flows at a mean velocity of 1.9 m/s through a pipe 800 m long with an inside diameter of 75 mm. Use the Darcy friction factor f = 0.018 and g = 9.81 m/s². Find the friction head loss hf.
Two open reservoirs are joined by a pipe 300 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.018. The water surface of the upper reservoir is 8 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each), a valve (K = 10) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.
A trapezoidal brickwork channel has a bottom width of 2.5 m and side slopes of 1:1 (horizontal:vertical). Water flows uniformly 2.1 m deep. Manning n = 0.015 and the bed slope is S = 0.002. Find the flow rate Q in m³/s.
b = 2.5 my = 2.1 mz = 1n = 0.015S = 0.002
Q = m³/s
22.Open-channel flow (Manning)Hard
A rectangular grass-lined earth channel 2.5 m wide must carry 3.4 m³/s in uniform flow at a depth of 1.4 m. Manning n = 0.03. Find the required bed slope S (in m/m).
Q = 3.4 m³/sb = 2.5 my = 1.4 mn = 0.03
S = m/m
23.Pumps & pump powerMedium
A pump delivers 25 L/s of water (ρ = 1000 kg/m³) against a head of 22 m. The pump efficiency is 65% and the electric motor driving it has an efficiency of 90%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.
A pump moves 75 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 6 m higher. The pipe is 400 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.018; the minor-loss coefficients add up to ΣK = 4 (entrance and exit included). Use g = 9.81 m/s². The pump efficiency is 75%. Find the shaft power Pshaft in kW.
You invest €5 000 at 8% per year with continuous compounding. Find the value FV after 16 years.
PV = €5 000r = 8%t = 16
FV = €
26.Time value of moneyHard
You save €500 at the end of every month for 5 years. The account pays 3% per year, compounded monthly. How much have you saved at the end? Find FV.
A = €5003% / 12N = 60
FV = €
27.NPV & IRRMedium
A machine costs €80 000 today. It generates €20 000 at the end of each year for 4 years and can then be sold for €16 000. The cost of capital is 8%. Find the net present value NPV.
C0 = €80 000CF = €20 000S = €16 000n = 4r = 8%
NPV = €
28.NPV & IRRHard
A project costs €20 000 and returns €12 500, €10 000 at the end of years 1 to 2. Find its internal rate of return IRR in percent.
CF0 = −20 000CF1 = 12 500CF2 = 10 000
IRR = %
29.Normal distributionMedium
X is normal with mean 12 min and standard deviation 1.5 min; Y is independent and normal with mean 20 min and standard deviation 2 min. Find the probability P that X + Y is more than 29.5 min. Round z to two decimals.
μX = 12, σX = 1.5μY = 20, σY = 2X + Y > 29.5 min
P =
30.Normal distributionHard
The battery lifetimes are normally distributed with mean 500 h and standard deviation 40 h. Drag the cut-off so the shaded top 70% is to the right of it. Find the cut-off x.
μ = 500 hσ = 40 h70%
x = h
3Solutions
1.Beam support reactions
Answer: RB = 39 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·5 = 50·1.5 + 60·2
RB = 195/5 = 39 kN
ΣFy = 0: RA = 110 − 39 = 71 kN
Answer
RB = 39 kN
2.Beam support reactions
Answer: RB = 49 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
UDL resultant: W = w·ℓ = 3·2 = 6 kN, acting at x̄ = 7 m
ΣMA = 0: RB·8 = 50·7 + 3·2·7
RB = 392/8 = 49 kN
ΣFy = 0: RA = 56 − 49 = 7 kN
Answer
RB = 49 kN
3.Truss: method of joints
Answer: member CG
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint C
BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.
ΣF⊥ = 0 → FCG = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·8 = 55·6 − 5·3 → Cy = 39.38 kN
ΣFy = 0: Ay = 55 − 39.38 = 15.63 kN
ΣFx = 0: Ax = 5 kN
Joint A
Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.
sin α = 3/6.708 = 0.4472
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −15.63/0.4472 = −34.94 kN
Answer
FAB = −34.94 kN (compression)
5.Shear force & bending moment
Answer: C (x = 4 m)
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 69.33 kN, R2 = 52.67 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = 126.7, MC = 229.3 kN·m, MD = 208, ME = 162.7, MF = 93.33, MG = 0
Answer
Mark C: MC = 229.3 kN·m
6.Shear force & bending moment
Answer: E (x = 8 m)
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 23.33 kN, R2 = 91.67 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = −40, MC = −33.33, MD = −26.67, ME = −140 kN·m, MF = −70, MG = 0
Answer
Mark E: ME = −140 kN·m
7.Beam deflection
Answer: δ = 61.36 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
w = 8 N/mm, L = 3000 mm
EI = 1.32 × 10¹² N·mm²
Deflection
δ = wL⁴/(8EI) = 8·3000⁴/(8·1.32 × 10¹²) = 61.36 mm
Answer
δ = 61.36 mm
8.Beam deflection
Answer: RB = 4.5 kN
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).
Remove the prop
Without the prop the beam is a cantilever. Its free end would deflect under the load.
δload = wL⁴/(8EI)
Compatibility at the prop
The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Required critical load
Pcr = n·P = 2·125000 = 250000 N
KL = 1·1500 = 1500 mm
Solve for the diameter
d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·250000·1500²/(π³·200000))^(1/4) = 49.09 mm
Answer
d = 49.09 mm
Check: the slenderness KL/r is 122.2, so the column is slender and Euler applies.
11.Centroid & second moment of area
Answer: Ix = 40.82 × 10⁶ mm⁴
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (22500·75 − 2827·60)/(22500 − 2827) = 77.16 mm
Full plate about ȳ
150·150³/12 + 22500·−2.156² = 42.29 × 10⁶ mm⁴
Hole about ȳ
π·60⁴/64 + 2827·−17.16² = 1.468 × 10⁶ mm⁴
Subtract
Ix = 40.82 × 10⁶ mm⁴
Answer
Ix = 40.82 × 10⁶ mm⁴
12.Centroid & second moment of area
Answer: σtop = 143.4 MPa
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 200·10 = 2000 mm², yf = 220 + 10/2 = 225 mm
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·2 = 19.62 kPa
Effective stress
σ′ = σ − u = 105 − 19.62 = 85.38 kPa
Answer
σ′ = 85.38 kPa
14.Effective stress in soil
Answer: u = 49.05 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·5 = 49.05 kPa
Answer
u = 49.05 kPa
15.Consolidation settlement
Answer: S = 131.5 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Preconsolidation pressure
σ′p = OCR·σ′0 = 2·80 = 160 kPa
Compare with the preconsolidation pressure
σ′f = 80 + 190 = 270 kPa > 160 kPa
Settlement
Recompression up to σ′p, virgin compression beyond it.
S = 0.03·2.5/(1 + 0.9)·log₁₀(160/80) + 0.4·2.5/(1 + 0.9)·log₁₀(270/160)
S = 11.88 + 119.6 = 131.5 mm
Answer
S = 131.5 mm
16.Consolidation settlement
Answer: t = 3.81 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H/2 = 5.5/2 = 2.75 m
Time
t = Tv·Hdr²/cv = 0.403·2.75²/0.8 = 3.81 years
Answer
t = 3.81 years
17.Hydrostatic force
Answer: F = 397.3 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 3 + 3/2 = 4.5 m
A = H·b = 3·3 = 9 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·4.5·9 = 397.3 kN
Answer
F = 397.3 kN
18.Hydrostatic force
Answer: F = 75.41 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1.5 + 2/2 = 2.5 m
A = H·b = 2·1.5 = 3 m²
Resultant force
F = ρ·g·yc·A = 1025·9.81·2.5·3 = 75.41 kN
Answer
F = 75.41 kN
19.Pipe friction & head loss
Answer: hf = 35.33 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity head
V²/(2g) = 1.9²/(2·9.81) = 0.184 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.018·(800/0.075)·1.9²/(2·9.81) = 35.33 m
Answer
hf = 35.33 m
20.Pipe friction & head loss
Answer: Q = 159.8 L/s
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Loss coefficients
f·L/D = 0.018·300/0.3 = 18
ΣK = 0.5 + 4·0.3 + 10 + 1.0 = 12.7
Energy equation
Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (2.5 + 1·2.1)·2.1 = 9.66 m²
P = b + 2y·√(1 + z²) = 2.5 + 2·2.1·√(1 + 1²) = 8.44 m
R = A/P = 1.145 m
Velocity
V = (1/0.015)·1.1452/3·0.0021/2 = 3.262 m/s
Flow rate
Q = A·V = 9.66·3.262 = 31.51 m³/s
Answer
Q = 31.51 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.001477 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.025·22 = 5.396 kW
Shaft power
Pshaft = 5.396/0.65 = 8.301 kW
Electrical power
Pel = 8.301/0.9 = 9.223 kW
Answer
Pel = 9.223 kW
24.Pumps & pump power
Answer: Pshaft = 17.28 kW
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Exponent
r·t = 0.08·16 = 1.28
e1.28 = 3.597
Future value
FV = 5 000·3.597 = €17 983.20
Answer
FV = €17 983.20
26.Time value of money
Answer: FV = 32323 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
You paid in €30 000 yourself; the rest is interest.
27.NPV & IRR
Answer: NPV = −1997 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(5%) = 975.06
NPV(10%) = −371.90
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
IRR ≈ 5 + 5·975.06/(975.06 − (−371.90)) = 8.619%
exact: NPV(8.558%) = 0 → IRR = 8.558%
Answer
IRR = 8.558%
29.Normal distribution
Answer: P = 0.8413
Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).
Distribution of the sum
μ = 32 min, σ = √(1.5² + 2²) = 2.5 min
Standardise
z = (29.5 − 32)/2.5 = −1
Upper tail
P = 1 − Φ(−1) = 1 − 0.1587 = 0.8413
Answer
P = 0.8413
30.Normal distribution
Answer: x = 479 h
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left
Φ(z) = 0.3
z from the table
z ≈ −0.52
Back to the original units
x = 500 − 0.52·40 = 479 h
Answer
x = 479 h
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.