laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 10 mP1 = 15 kN at 1 mP2 = 60 kN at 7 m
RB = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. A load P acts at 2 m from A, inclined at 30° to the horizontal, and a vertical load Q acts at 6 m from A. Find the angle α between the total reaction force at the pin A and the horizontal.
L = 8 mP = 55 kN at 2 m, θ = 30°Q = 50 kN at 6 m
α = °
3.Truss: method of jointsMedium
Use the method of joints to find the force FBC in member BC. Give tension as positive and compression as negative.
span = 6 mheight = 3 mB is 4 m from Avertical load = 40 kN
FBC = kN
4.Truss: method of jointsHard
Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.
span = 8 mheight = 4 mB is 1 m from Avertical load = 40 kNhorizontal load = 15 kN →
FAC = kN
5.Shear force & bending momentMedium
Find the bending moment Mx at the section x = 2.5 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 5 mw = 3 kN/m from 0 to 5 mx = 2.5 m
Mx = kN·m
6.Shear force & bending momentHard
Find the bending moment Mx at the section x = 1.5 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 4 mP = 35 kN at 1.5 mw = 10 kN/m from 0 to 4 mx = 1.5 m
Mx = kN·m
7.Beam deflectionMedium
A simply supported beam carries a point load P at a = 2 m from support A. Find the deflection δP under the load.
P = 26 kNa = 2 mL = 3 mE = 200 GPa (steel)I = 57 × 10⁶ mm⁴
δP = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.
w = 10 kN/mL = 2 mE = 200 GPa (steel)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
A column of length L made of steel is fixed at the base and free at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 4 mE = 200 GPa (steel)d = 80 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of aluminium is pinned at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 6 mE = 70 GPa (aluminium)d = 40 mm
σcr = MPa
11.Centroid & second moment of areaMedium
Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.
bf = 120 mmtf = 30 mmtw = 10 mmhw = 160 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
The T-section is used as a beam with the flange on top and carries a sagging bending moment of 40 kN·m. Find the size of the bending stress σtop at the top edge.
A 3.5 m thick overconsolidated clay layer has Cc = 0.25, Cr = 0.05 and e₀ = 0.65. At its mid-depth the effective vertical stress is 75 kPa and the overconsolidation ratio is OCR = 2.5. A new building adds 150 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
In a laboratory oedometer test, a clay specimen 19 mm thick, drained at the top and bottom, reaches 50% consolidation in 8 min. In the field the same clay forms a layer 4 m thick. It lies between two sand layers, so water drains out at the top and the bottom. How many days t does the field layer take to reach 50% consolidation?
A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 2 m below the surface. Find the resultant hydrostatic force F on the gate.
d = 2 mH = 3 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
A vertical rectangular gate 1.5 m wide sits in the wall of a tank of glycerin, with its top edge 1 m below the surface. Find the depth ycp of the centre of pressure below the surface.
Water flows at a mean velocity of 1.4 m/s through a pipe 400 m long with an inside diameter of 75 mm. Use the Darcy friction factor f = 0.015 and g = 9.81 m/s². Find the friction head loss hf.
Two open reservoirs are joined by a pipe 100 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.022. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 100 L/s?
A rectangular grass-lined earth channel is 3 m wide. Water flows uniformly 1.5 m deep. Manning n = 0.03 and the bed slope is S = 0.001. Find the flow rate Q in m³/s.
b = 3 my = 1.5 mn = 0.03S = 0.001
Q = m³/s
22.Open-channel flow (Manning)Hard
A trapezoidal unfinished concrete channel with a bottom width of 4.5 m and side slopes of 1:1 (horizontal:vertical) must carry 43 m³/s in uniform flow at a depth of 2.4 m. Manning n = 0.014. Find the required bed slope S (in m/m).
Q = 43 m³/sb = 4.5 my = 2.4 mz = 1n = 0.014
S = m/m
23.Pumps & pump powerMedium
A pump delivers 10 L/s of water (ρ = 1000 kg/m³) against a head of 16 m. The pump efficiency is 82% and the electric motor driving it has an efficiency of 90%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.
A pump moves 75 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 21 m higher. The pipe is 300 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.015; the minor-loss coefficients add up to ΣK = 5 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.
You need €50 000 in 6 years. An account pays 2% per year, compounded quarterly. How much must you deposit today? Find the present value PV.
FV = €50 0002% / 4n = 6
PV = €
26.Time value of moneyHard
You want €100 000 in 16 years. You save the same amount at the end of every month in an account paying 5.4% per year, compounded monthly. Find the monthly deposit A.
FV = €100 0005.4% / 12N = 192
A = €
27.NPV & IRRMedium
A machine costs €20 000 today, lasts 9 years and costs €2 000 per year to run (paid at the end of each year). The cost of capital is 10%. Find its equivalent annual cost EAC.
C0 = €20 000M = €2 000n = 9r = 10%
EAC = €
28.NPV & IRRHard
A project costs €50 000 and returns €31 000, €20 500, €31 000 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
CF0 = −50 000CF1 = 31 000CF2 = 20 500CF3 = 31 000
IRR = %
29.Normal distributionMedium
The exam scores are normally distributed with mean 65 points and standard deviation 10 points. What fraction lies between 49.5 and 77 points? Give P as a decimal.
μ = 65σ = 10x1 = 49.5x2 = 77
P =
30.Normal distributionHard
The heights of adult men are normally distributed with mean 178 cm and standard deviation 7 cm. Drag the cut-off so the shaded top 95% is to the right of it. Find the cut-off x.
μ = 178 cmσ = 7 cm95%
x = cm
3Solutions
1.Beam support reactions
Answer: RB = 43.5 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·10 = 15·1 + 60·7
RB = 435/10 = 43.5 kN
ΣFy = 0: RA = 75 − 43.5 = 31.5 kN
Answer
RB = 43.5 kN
2.Beam support reactions
Answer: α = 34.82 °
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Components of P
Pv = 55·sin 30° = 27.5 kN
Ph = 55·cos 30° = 47.63 kN
Reactions
ΣMA = 0: RB·8 = 27.5·2 + 50·6 → RB = 44.38 kN
Ay = 27.5 + 50 − 44.38 = 33.13 kN
Ax = Ph = 47.63 kN
Direction at A
α = atan(Ay/Ax) = atan(33.13/47.63) = 34.82°
Answer
α = 34.82°
3.Truss: method of joints
Answer: FBC = −32.05 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·6 = 40·4 → Cy = 26.67 kN
ΣFy = 0: Ay = 40 − 26.67 = 13.33 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
sin γ = 3/3.606 = 0.8321, cos γ = 2/3.606 = 0.5547
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·8 = 40·1 + 15·4 → Cy = 12.5 kN
ΣFy = 0: Ay = 40 − 12.5 = 27.5 kN
ΣFx = 0: Ax = −15 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
sin γ = 4/8.062 = 0.4961, cos γ = 7/8.062 = 0.8682
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 3·5 = 15 kN, acting at x̄ = 2.5 m
ΣMA = 0: RB·5 = 3·5·2.5
RB = 37.5/5 = 7.5 kN
ΣFy = 0: RA = 15 − 7.5 = 7.5 kN
Cut at x = 2.5 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 7.5·2.5 − 3·2.5·1.25 = 9.375 kN·m
Answer
Mx = 9.375 kN·m
6.Shear force & bending moment
Answer: Mx = 51.56 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 10·4 = 40 kN, acting at x̄ = 2 m
ΣMA = 0: RB·4 = 35·1.5 + 10·4·2
RB = 132.5/4 = 33.13 kN
ΣFy = 0: RA = 75 − 33.13 = 41.88 kN
Cut at x = 1.5 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 41.88·1.5 − 10·1.5·0.75 = 51.56 kN·m
Answer
Mx = 51.56 kN·m
7.Beam deflection
Answer: δP = 1.014 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 26000 N, a = 2000 mm, b = 1000 mm, L = 3000 mm
EI = 1.14 × 10¹³ N·mm²
Deflection under the load
δP = Pa²b²/(3EIL) = 26000·2000²·1000²/(3·1.14 × 10¹³·3000) = 1.014 mm
Answer
δP = 1.014 mm
8.Beam deflection
Answer: Ireq = 1.875 × 10⁶ mm⁴
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Deflection limit
δallow = L/360 = 2000/360 = 5.556 mm
Required second moment of area
I = 5wL⁴/(384·E·δallow) = 5·10·2000⁴/(384·200000·5.556) = 1.875 × 10⁶ mm⁴
Ireq = 1.875 × 10⁶ mm⁴
Answer
Ireq = 1.875 × 10⁶ mm⁴
9.Column buckling
Answer: Pcr = 62.01 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·40⁴/64 = 125664 mm⁴
Radius of gyration and slenderness
A = 1257 mm²
r = √(I/A) = √(125664/1257) = 10 mm
KL = 1·6000 = 6000 mm
KL/r = 6000/10 = 600
Critical stress
σcr = π²E/(KL/r)² = π²·70000/600² = 1.919 MPa
Answer
σcr = 1.919 MPa
11.Centroid & second moment of area
Answer: Ix = 13.68 × 10⁶ mm⁴
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 120·30 = 3600 mm², yf = 160 + 30/2 = 175 mm
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 180·30 = 5400 mm², yf = 220 + 30/2 = 235 mm
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·2 = 19.62 kPa
Effective stress
σ′ = σ − u = 86.5 − 19.62 = 66.88 kPa
Answer
σ′ = 66.88 kPa
14.Effective stress in soil
Answer: σ = 102.5 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·1 + γsat,sand·2 + γsat,clay·2.5
σ = 16.5·1 + 20.5·2 + 18·2.5 = 102.5 kPa
Answer
σ = 102.5 kPa
15.Consolidation settlement
Answer: S = 84.2 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Preconsolidation pressure
σ′p = OCR·σ′0 = 2.5·75 = 187.5 kPa
Compare with the preconsolidation pressure
σ′f = 75 + 150 = 225 kPa > 187.5 kPa
Settlement
Recompression up to σ′p, virgin compression beyond it.
S = 0.05·3.5/(1 + 0.65)·log₁₀(187.5/75) + 0.25·3.5/(1 + 0.65)·log₁₀(225/187.5)
S = 42.21 + 41.99 = 84.2 mm
Answer
S = 84.2 mm
16.Consolidation settlement
Answer: t = 246.2 days
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage paths
Hdr,lab = 19/2 = 9.5 mm = 0.0095 m
Hdr,field = 4/2 = 2 m
Scale the time
t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.
tfield = 8·(2/0.0095)² = 354571 min
tfield = 354571/1440 = 246.2 days
Answer
t = 246.2 days
17.Hydrostatic force
Answer: F = 206 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 2 + 3/2 = 3.5 m
A = H·b = 3·2 = 6 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3.5·6 = 206 kN
Answer
F = 206 kN
18.Hydrostatic force
Answer: ycp = 2.481 m
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1 + 2.5/2 = 2.25 m
A = H·b = 2.5·1.5 = 3.75 m²
Resultant force
F = ρ·g·yc·A = 1260·9.81·2.25·3.75 = 104.3 kN
Centre of pressure
Pressure grows with depth, so the resultant acts below the centroid.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity head
V²/(2g) = 1.4²/(2·9.81) = 0.0999 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.015·(400/0.075)·1.4²/(2·9.81) = 7.992 m
Answer
hf = 7.992 m
20.Pipe friction & head loss
Answer: Δz = 1.534 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.1/0.07069 = 1.415 m/s
V²/(2g) = 0.102 m
Loss coefficients
f·L/D = 0.022·100/0.3 = 7.333
ΣK = 0.5 + 4·0.3 + 5 + 1.0 = 7.7
Total head loss
hf = 7.333·0.102 = 0.7481 m
hm = 7.7·0.102 = 0.7855 m
Δz = hf + hm = 1.534 m
Answer
Δz = 1.534 m
21.Open-channel flow (Manning)
Answer: Q = 3.916 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = b·y = 3·1.5 = 4.5 m²
P = b + 2y = 3 + 2·1.5 = 6 m
R = A/P = 0.75 m
Velocity
V = (1/0.03)·0.752/3·0.0011/2 = 0.8701 m/s
Flow rate
Q = A·V = 4.5·0.8701 = 3.916 m³/s
Answer
Q = 3.916 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.0007928 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (4.5 + 1·2.4)·2.4 = 16.56 m²
P = b + 2y·√(1 + z²) = 4.5 + 2·2.4·√(1 + 1²) = 11.29 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.01·16 = 1.57 kW
Shaft power
Pshaft = 1.57/0.82 = 1.914 kW
Electrical power
Pel = 1.914/0.9 = 2.127 kW
Answer
Pel = 2.127 kW
24.Pumps & pump power
Answer: H = 28.99 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are open and practically at rest, so pressure and velocity terms drop out.
H = Δz + hL = 21 + 7.988 = 28.99 m
Answer
H = 28.99 m
25.Time value of money
Answer: PV = 44359 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rate and number of periods
i = 0.02/4 = 0.005
N = 4·6 = 24
Present value
PV = FV/(1 + i)N = 50 000/1.127 = €44 359.28
Answer
PV = €44 359.28
26.Time value of money
Answer: A = 328.9 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Equivalent annual cost: spread the present value of all costs over the life as an equal yearly amount (an annuity): EAC = PV·r/(1 − (1 + r)⁻ⁿ). It lets you compare machines with different lives.
Annuity factor
(1 − 1.1−9)/0.1 = 5.759
Annualised purchase price
20 000/5.759 = 3 472.81
EAC
EAC = 3 472.81 + 2 000 = €5 472.81
Answer
EAC = €5 472.81
28.NPV & IRR
Answer: IRR = 30.12 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(30%) = 86.48
NPV(35%) = −3 189.05
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
IRR ≈ 30 + 5·86.48/(86.48 − (−3 189.05)) = 30.13%
exact: NPV(30.12%) = 0 → IRR = 30.12%
Answer
IRR = 30.12%
29.Normal distribution
Answer: P = 0.8244
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z-scores
z₁ = (49.5 − 65)/10 = −1.55
z₂ = (77 − 65)/10 = 1.2
Area between
P = Φ(1.2) − Φ(−1.55) = 0.8849 − 0.06057 = 0.8244
Answer
P = 0.8244
30.Normal distribution
Answer: x = 166.5 cm
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.