laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam (pin at A, roller at B) carries a linearly varying load that falls from 15 kN/m at A to zero at B. A point load P also acts at 2 m from A. Find the vertical support reaction RA.
L = 5 mw0 = 15 kN/mP = 75 kN at 2 m
RA = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.
L = 10 mP = 25 kN at 7 mw = 5 kN/m from 2 to 7 m
RA = kN
3.Truss: method of jointsMedium
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
D: 15 kN ↓F: 15 kN ↓H: 10 kN ↓
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member BG
13member DG
4.Truss: method of jointsHard
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
B: 15 kN ↓H: 20 kN ↓H: 10 kN ←
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member BG
13member DG
5.Shear force & bending momentMedium
The simply supported beam carries a clockwise couple M0 = 15 kN·m at x = 1 m from A, and no other load. Find the bending moment Mx just to the right of the couple. Use sagging moments positive and upward shear on the left face positive.
L = 10 mM0 = 15 kN·m clockwise, at 1 m
Mx = kN·m
6.Shear force & bending momentHard
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
40 kN @ 0 m60 kN @ 12 m50 kN @ 4 m
1A (x = 0 m)
2B (x = 2 m)
3C (x = 4 m)
4D (x = 6 m)
5E (x = 8 m)
6F (x = 10 m)
7G (x = 12 m)
7.Beam deflectionMedium
A simply supported beam carries a uniformly distributed load w over its whole span. Find the maximum deflection δmax, at midspan.
w = 12 kN/mL = 5 mE = 11 GPa (timber)I = 120 × 10⁶ mm⁴
δmax = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.
w = 20 kN/mL = 2 mE = 70 GPa (aluminium)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
A column of length L made of aluminium is fixed at the base and free at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 2.5 mE = 70 GPa (aluminium)b × h = 25 × 100 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of aluminium is fixed at the base and pinned at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 2 mE = 70 GPa (aluminium)d = 25 mm
σcr = MPa
11.Centroid & second moment of areaMedium
A 120 mm × 150 mm plate has a circular hole of diameter 60 mm on its vertical centre line, with its centre 60 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 120 mmh = 150 mmd = 60 mmhole centre: y = 60 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A 200 mm × 150 mm plate has a rectangular cut-out 80 mm wide and 40 mm high, centred on the vertical centre line with its centre 52.5 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 200 mmh = 150 mmcut-out: 80 × 40 mmhole centre: y = 52.5 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
For the soil profile shown, find the total vertical stress σ at point X.
A 4 m thick overconsolidated clay layer has Cc = 0.2, Cr = 0.03 and e₀ = 0.6. At its mid-depth the effective vertical stress is 75 kPa and the preconsolidation pressure is 185 kPa. A new building adds 200 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 2 m thick has a coefficient of consolidation cv = 0.8 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 50% average consolidation the time factor is Tv = 0.197. How many years t does the layer take to reach 50% consolidation?
A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 3 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 2 m wide sits in the wall of a tank of oil, with its top edge 0.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.
Water flows at 80 L/s through a pipe 100 m long with an inside diameter of 200 mm. Use the Darcy friction factor f = 0.03 and g = 9.81 m/s². Find the friction head loss hf.
Two open reservoirs are joined by a pipe 300 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.015. The water surface of the upper reservoir is 8 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.
A trapezoidal brickwork channel has a bottom width of 1.5 m and side slopes of 1.5:1 (horizontal:vertical). Water flows uniformly 0.8 m deep. Manning n = 0.015 and the bed slope is S = 0.0008. Find the flow rate Q in m³/s.
b = 1.5 my = 0.8 mz = 1.5n = 0.015S = 0.0008
Q = m³/s
22.Open-channel flow (Manning)Hard
A trapezoidal clean earth channel with a bottom width of 3 m and side slopes of 3:1 (horizontal:vertical) must carry 31 m³/s in uniform flow at a depth of 2.2 m. Manning n = 0.022. Find the required bed slope S (in m/m).
Q = 31 m³/sb = 3 my = 2.2 mz = 3n = 0.022
S = m/m
23.Pumps & pump powerMedium
A pump delivers 60 L/s of water (ρ = 1000 kg/m³) against a head of 20 m. The pump efficiency is 78% and the electric motor driving it has an efficiency of 95%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.
A pump moves 100 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 5 m higher. The pipe is 500 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.018; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². The pump efficiency is 72%. Find the shaft power Pshaft in kW.
You need €15 000 in 8 years. An account pays 3.6% per year, compounded monthly. How much must you deposit today? Find the present value PV.
FV = €15 0003.6% / 12n = 8
PV = €
26.Time value of moneyHard
You borrow €20 000 at 3.6% per year, compounded monthly, and repay €375 at the end of every month. How many months does it take until the loan is repaid (the last payment may be smaller)? Give the number of payments N.
P = €20 000A = €3753.6% / 12
N = payments
27.NPV & IRRMedium
An investment of €45 000 gives these cash flows at the end of years 1 to 4: €13 000, €19 000, €15 000, €14 000. The cost of capital is 10%. Find the net present value NPV.
A project costs €10 000 and returns €4 000, €4 500, €3 000 at the end of years 1 to 3. Cash flows can be reinvested at the cost of capital of 10%. Find the modified internal rate of return MIRR in percent.
Drag z so that the shaded area between −z and z under the standard normal curve is 0.5467. Find z to two decimals.
A = 0.5467
z =
30.Normal distributionHard
The exam scores are normally distributed with mean 65 points and standard deviation 10 points. Find the value x below which 75% of them lie (the 75th percentile).
μ = 65σ = 10P = 75%
x = points
3Solutions
1.Beam support reactions
Answer: RA = 70 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Resultant of the triangular load
W = ½·15·5 = 37.5 kN
x̄ = L/3 = 1.667 m
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·5 = 37.5·1.667 + 75·2
RB = 42.5 kN
RA = 112.5 − 42.5 = 70 kN
Answer
RA = 70 kN
2.Beam support reactions
Answer: RA = 21.25 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
UDL resultant: W = w·ℓ = 5·5 = 25 kN, acting at x̄ = 4.5 m
ΣMA = 0: RB·10 = 25·7 + 5·5·4.5
RB = 287.5/10 = 28.75 kN
ΣFy = 0: RA = 50 − 28.75 = 21.25 kN
Answer
RA = 21.25 kN
3.Truss: method of joints
Answer: member CG
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint C
BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.
ΣF⊥ = 0 → FCG = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint C
BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.
ΣF⊥ = 0 → FCG = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. An applied couple makes the bending moment diagram jump by the size of the couple.
Support reactions
Moments about A, counter-clockwise positive: RB·L − M0 = 0. Vertical balance: RA + RB = 0.
RB = M0/L = 15/10 = 1.5 kN (upward)
RA = −RB = −1.5 kN (downward)
Cut just right of the couple
The left part now contains RA and the couple.
Mx = RA·a + M0 = −1.5·1 + 15 = 13.5 kN·m
Answer
Mx = 13.5 kN·m
6.Shear force & bending moment
Answer: E (x = 8 m)
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 46.67 kN, R2 = 103.3 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = −80, MC = −66.67, MD = −153.3, ME = −240 kN·m, MF = −120, MG = 0
Answer
Mark E: ME = −240 kN·m
7.Beam deflection
Answer: δmax = 73.98 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
w = 12 N/mm, L = 5000 mm
EI = 1.32 × 10¹² N·mm²
Deflection
δmax = 5wL⁴/(384EI) = 5·12·5000⁴/(384·1.32 × 10¹²) = 73.98 mm
Answer
δmax = 73.98 mm
8.Beam deflection
Answer: Ireq = 10.71 × 10⁶ mm⁴
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Deflection limit
δallow = L/360 = 2000/360 = 5.556 mm
Required second moment of area
I = 5wL⁴/(384·E·δallow) = 5·20·2000⁴/(384·70000·5.556) = 1.071 × 10⁷ mm⁴
Ireq = 10.71 × 10⁶ mm⁴
Answer
Ireq = 10.71 × 10⁶ mm⁴
9.Column buckling
Answer: Pcr = 3.598 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·25⁴/64 = 19175 mm⁴
Radius of gyration and slenderness
A = 490.9 mm²
r = √(I/A) = √(19175/490.9) = 6.25 mm
KL = 0.7·2000 = 1400 mm
KL/r = 1400/6.25 = 224
Critical stress
σcr = π²E/(KL/r)² = π²·70000/224² = 13.77 MPa
Answer
σcr = 13.77 MPa
11.Centroid & second moment of area
Answer: Ix = 32.36 × 10⁶ mm⁴
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (18000·75 − 2827·60)/(18000 − 2827) = 77.8 mm
Full plate about ȳ
120·150³/12 + 18000·−2.795² = 33.89 × 10⁶ mm⁴
Hole about ȳ
π·60⁴/64 + 2827·−17.8² = 1.532 × 10⁶ mm⁴
Subtract
Ix = 32.36 × 10⁶ mm⁴
Answer
Ix = 32.36 × 10⁶ mm⁴
12.Centroid & second moment of area
Answer: Ix = 54.01 × 10⁶ mm⁴
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (30000·75 − 3200·52.5)/(30000 − 3200) = 77.69 mm
Full plate about ȳ
200·150³/12 + 30000·−2.687² = 56.47 × 10⁶ mm⁴
Hole about ȳ
80·40³/12 + 3200·−25.19² = 2.457 × 10⁶ mm⁴
Subtract
Ix = 54.01 × 10⁶ mm⁴
Answer
Ix = 54.01 × 10⁶ mm⁴
13.Effective stress in soil
Answer: σ = 119.5 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·3 + γsat,sand·2 + γsat,clay·4
σ = 15.5·3 + 19·2 + 19·4 = 160.5 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·6 = 58.86 kPa
Effective stress
σ′ = σ − u = 160.5 − 58.86 = 101.6 kPa
Answer
σ′ = 101.6 kPa
15.Consolidation settlement
Answer: S = 115.5 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 75 + 200 = 275 kPa > 185 kPa
Settlement
Recompression up to σ′p, virgin compression beyond it.
S = 0.03·4/(1 + 0.6)·log₁₀(185/75) + 0.2·4/(1 + 0.6)·log₁₀(275/185)
S = 29.41 + 86.08 = 115.5 mm
Answer
S = 115.5 mm
16.Consolidation settlement
Answer: t = 0.985 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H = 2 m
Time
t = Tv·Hdr²/cv = 0.197·2²/0.8 = 0.985 years
Answer
t = 0.985 years
17.Hydrostatic force
Answer: F = 110.4 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 3 + 1.5/2 = 3.75 m
A = H·b = 1.5·2 = 3 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3.75·3 = 110.4 kN
Answer
F = 110.4 kN
18.Hydrostatic force
Answer: ycp = 1.4 m
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 0.5 + 1.5/2 = 1.25 m
A = H·b = 1.5·2 = 3 m²
Resultant force
F = ρ·g·yc·A = 880·9.81·1.25·3 = 32.37 kN
Centre of pressure
Pressure grows with depth, so the resultant acts below the centroid.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Mean velocity
A = π·0.2²/4 = 0.03142 m²
V = Q/A = 0.08/0.03142 = 2.546 m/s
Velocity head
V²/(2g) = 2.546²/(2·9.81) = 0.3305 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.03·(100/0.2)·2.546²/(2·9.81) = 4.958 m
Answer
hf = 4.958 m
20.Pipe friction & head loss
Answer: Q = 122 L/s
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Loss coefficients
f·L/D = 0.015·300/0.25 = 18
ΣK = 0.5 + 3·0.3 + 5 + 1.0 = 7.4
Energy equation
Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (1.5 + 1.5·0.8)·0.8 = 2.16 m²
P = b + 2y·√(1 + z²) = 1.5 + 2·0.8·√(1 + 1.5²) = 4.384 m
R = A/P = 0.4927 m
Velocity
V = (1/0.015)·0.49272/3·0.00081/2 = 1.176 m/s
Flow rate
Q = A·V = 2.16·1.176 = 2.541 m³/s
Answer
Q = 2.541 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.0007755 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (3 + 3·2.2)·2.2 = 21.12 m²
P = b + 2y·√(1 + z²) = 3 + 2·2.2·√(1 + 3²) = 16.91 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.06·20 = 11.77 kW
Shaft power
Pshaft = 11.77/0.78 = 15.09 kW
Electrical power
Pel = 15.09/0.95 = 15.89 kW
Answer
Pel = 15.89 kW
24.Pumps & pump power
Answer: Pshaft = 18.92 kW
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rate and number of periods
i = 0.036000000000000004/12 = 0.003
N = 12·8 = 96
Present value
PV = FV/(1 + i)N = 15 000/1.333 = €11 251.27
Answer
PV = €11 251.27
26.Time value of money
Answer: N = 59 payments
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rearrange the annuity formula
i = 0.003
(1 + i)−N = 1 − 20 000·0.003/375 = 0.84
Solve with logarithms
N = −ln(0.84)/ln(1.003) = 58.2
Round up to whole payments
58 full payments leave a small balance, which the last, smaller payment clears.
N = 59
Answer
N = 59 payments
27.NPV & IRR
Answer: NPV = 3353 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −45 000
CF1/(1 + 0.1)1 = 13 000/1.1 = 11 818.18
CF2/(1 + 0.1)2 = 19 000/1.21 = 15 702.48
CF3/(1 + 0.1)3 = 15 000/1.331 = 11 269.72
CF4/(1 + 0.1)4 = 14 000/1.464 = 9 562.19
Add them up
NPV = €3 352.57
Answer
NPV = €3 352.57
NPV is positive, so the project earns more than the required return.
28.NPV & IRR
Answer: MIRR = 8.548 %
Modified IRR: compound every inflow forward to the end of the project at the reinvestment rate (usually the cost of capital) to get the terminal value TV. MIRR is the rate that turns the initial investment into TV: MIRR = (TV/C₀)^(1/n) − 1.
Terminal value of the inflows
4 000·1.12 = 4 840.00
4 500·1.11 = 4 950.00
3 000·1.10 = 3 000.00
TV = 12 790.00
MIRR
MIRR = (12 790.00/10 000)1/3 − 1 = 8.548%
Answer
MIRR = 8.548%
29.Normal distribution
Answer: z = 0.75
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left of z
Φ(z) = (1 + 0.5467)/2 = 0.7734
Read the z-table backwards
Find 0.7734 inside the table and read off z.
z = 0.75
Answer
z = 0.75
30.Normal distribution
Answer: x = 71.75 points
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z for the percentile
Φ(z) = 0.75 → z = 0.6745
Back to x
x = 65 + 0.6745·10 = 71.75 points
Answer
x = 71.75 points
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.