FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 30 kNP2​ = 35 kNABRA​ = ?RB​1 m1 m2 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.

L = 4 mP1 = 30 kN at 1 mP2 = 35 kN at 2 m
RA = kN
2.Beam support reactionsHard
w = 5 kN/mP = 60 kNABRA​ = ?RB​2 m5 m1 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.

L = 8 mP = 60 kN at 2 mw = 5 kN/m from 2 to 7 m
RA = kN
3.Truss: method of jointsMedium
ABBCACACB10 kN6 m1 m2 m

Use the method of joints to find the force FBC in member BC. Give tension as positive and compression as negative.

span = 6 mheight = 2 mB is 1 m from Avertical load = 10 kN
FBC = kN
4.Truss: method of jointsHard
ABCDEFGH20 kN15 kN25 kN25 kN4 × 3 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

F: 20 kN ↓F: 15 kN →G: 25 kN ↓H: 25 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
5.Shear force & bending momentMedium
w = 4 kN/mABsection7.5 m0.5 m

Find the bending moment Mx at the section x = 7.5 m from support A. Use sagging moments positive and upward shear on the left face positive.

L = 8 mw = 4 kN/m from 0 to 8 mx = 7.5 m
Mx = kN·m
6.Shear force & bending momentHard
35 kN35 kN20 kNABCDEFG2 m2 m2 m2 m2 m2 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

35 kN @ 0 m35 kN @ 12 m20 kN @ 6 m
  1. 1A (x = 0 m)
  2. 2B (x = 2 m)
  3. 3C (x = 4 m)
  4. 4D (x = 6 m)
  5. 5E (x = 8 m)
  6. 6F (x = 10 m)
  7. 7G (x = 12 m)
7.Beam deflectionMedium
P = 2 kNABδ1 m3 m

A simply supported beam carries a point load P at a = 1 m from support A. Find the deflection δP under the load.

P = 2 kNa = 1 mL = 4 mE = 11 GPa (timber)I = 84 × 10⁶ mm⁴
δP = mm
8.Beam deflectionHard
w = 6 kN/mAB5 m

A propped cantilever is fixed at A and simply supported (propped) at B. It carries a uniformly distributed load w over its whole length. EI is constant. Find the reaction RB at the prop.

L = 5 mw = 6 kN/m
RB = kN
9.Column bucklingMedium
PL = 1.5 md = 50 mmcross-section

A column of length L made of steel is fixed at the base and free at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 1.5 mE = 200 GPa (steel)d = 50 mm
Pcr = kN
10.Column bucklingHard
PL = 2 md = 80 mmcross-section

A column of length L made of aluminium is fixed at the base and free at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 2 mE = 70 GPa (aluminium)d = 80 mm
σcr = MPa
11.Centroid & second moment of areaMedium
100 mm150 mm52.5 mmØ50xIx​ = ?

A 100 mm × 150 mm plate has a circular hole of diameter 50 mm on its vertical centre line, with its centre 52.5 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 100 mmh = 150 mmd = 50 mmhole centre: y = 52.5 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
280252408xM = 5 kN·mdimensions in mm

The T-section is used as a beam with the flange on top and carries a sagging bending moment of 5 kN·m. Find the size of the bending stress σtop at the top edge.

bf = 280 mmtf = 25 mmtw = 8 mmhw = 240 mmM = 5 kN·m
σtop = MPa
13.Effective stress in soilMedium
sandγd​ = 15 kN/m³γsat​ = 20 kN/m³8 mwater tableXz = 6 m

For the soil profile shown, find the pore water pressure u at point X.

z = 6 mzw = 3 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 20 kN/m³
u = kPa
14.Effective stress in soilHard
sandγd​ = 15.5 kN/m³γsat​ = 19 kN/m³6 mclayγsat​ = 17 kN/m³6 mwater tableXz = 9 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 9 mzw = 5 mγw = 9.81 kN/m³sand: γd = 15.5 kN/m³sand: γsat = 19 kN/m³clay: γsat = 17 kN/m³
σ′ = kPa
15.Consolidation settlementMedium
Δσ = 200 kPasandclayCc​ = 0.5, Cr​ = 0.05e0​ = 1.1σ′0​ = 85 kPaOCR = 33 mwater table

A 3 m thick overconsolidated clay layer has Cc = 0.5, Cr = 0.05 and e₀ = 1.1. At its mid-depth the effective vertical stress is 85 kPa and the overconsolidation ratio is OCR = 3. A new building adds 200 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 3 mCc = 0.5Cr = 0.05e0 = 1.1σ′0 = 85 kPaOCR = 3Δσ = 200 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 6 m6 mimpervious rockwater table

In a laboratory oedometer test, a clay specimen 20 mm thick, drained at the top and bottom, reaches 50% consolidation in 10 min. In the field the same clay forms a layer 6 m thick. It lies on impervious rock, with sand above it, so water drains out only at the top. How many days t does the field layer take to reach 50% consolidation?

hlab = 20 mmtlab = 10 minH = 6 mfield: single drainage
t = days
17.Hydrostatic forceMedium
gated = 3 mH = 2.5 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 3 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 3 mH = 2.5 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 2.5 mH = 2 m

A vertical rectangular gate 1 m wide sits in the wall of a tank of water, with its top edge 2.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 2.5 mH = 2 mb = 1 mρ = 1000 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
V = 2.9 m/sD = 200 mmL = 300 mf = 0.022

Water (ρ = 1000 kg/m³) flows at 2.9 m/s through a horizontal pipe, 300 m long, with an inside diameter of 200 mm. Use the Darcy friction factor f = 0.022 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 2.9 m/sL = 300 mD = 200 mmf = 0.022ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 5Δz = ?L = 200 m, D = 150 mm, f = 0.0223× bend (K = 0.3)

Two open reservoirs are joined by a pipe 200 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.022. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 50 L/s?

Q = 50 L/sL = 200 mD = 150 mmf = 0.022Kentrance = 0.5Kbend = 0.3 (×3)Kvalve = 5Kexit = 1.0
Δz = m
21.Open-channel flow (Manning)Medium
b = 5.5 my = 2.1 m2 : 1n = 0.03, S = 0.001

A trapezoidal grass-lined earth channel has a bottom width of 5.5 m and side slopes of 2:1 (horizontal:vertical). Water flows uniformly 2.1 m deep. Manning n = 0.03 and the bed slope is S = 0.001. Find the flow rate Q in m³/s.

b = 5.5 my = 2.1 mz = 2n = 0.03S = 0.001
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 1.5 my = 1.5 m1.5 : 1n = 0.015, Q = 10 m³/s

A trapezoidal brickwork channel with a bottom width of 1.5 m and side slopes of 1.5:1 (horizontal:vertical) must carry 10 m³/s in uniform flow at a depth of 1.5 m. Manning n = 0.015. Find the required bed slope S (in m/m).

Q = 10 m³/sb = 1.5 my = 1.5 mz = 1.5n = 0.015
S = m/m
23.Pumps & pump powerMedium
PQ = 50 L/sH = 20 m

A pump with an efficiency of 65% delivers 50 L/s of water (ρ = 1000 kg/m³) against a head of 20 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.

Q = 50 L/sH = 20 mη = 65%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
PQ = 30 L/sΔz = 6 mL = 200 m, D = 150 mm, f = 0.02, ΣK = 8

A pump moves 30 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 6 m higher. The pipe is 200 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.02; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.

Q = 30 L/sΔz = 6 mL = 200 mD = 150 mmf = 0.02ΣK = 8
H = m
25.Time value of moneyMedium
years0123456PV = ?€20 000

You need €20 000 in 6 years. An account pays 4% per year, compounded quarterly. How much must you deposit today? Find the present value PV.

FV = €20 0004% / 4n = 6
PV = €
26.Time value of moneyHard
months0123…72€20 000A?AAA

A loan of €20 000 is repaid with equal monthly payments over 6 years. The interest rate is 7.2% per year, compounded monthly. Find the monthly payment A.

P = €20 0007.2% / 12N = 72
A = €
27.NPV & IRRMedium
years0123−60 00028 00017 00027 000

An investment of €60 000 gives these cash flows at the end of years 1 to 3: €28 000, €17 000, €27 000. The cost of capital is 9%. Find the net present value NPV.

r = 9%CF0 = −60 000CF1 = 28 000CF2 = 17 000CF3 = 27 000
NPV = €
28.NPV & IRRHard
years012−25 00014 00018 000

A project costs €25 000 and returns €14 000, €18 000 at the end of years 1 to 2. Find its internal rate of return IRR in percent.

CF0 = −25 000CF1 = 14 000CF2 = 18 000
IRR = %
29.Normal distributionMedium
−3−2−10123zshaded area between −z and z = 0.9684

Drag z so that the shaded area between −z and z under the standard normal curve is 0.9684. Find z to two decimals.

A = 0.9684
z =
30.Normal distributionHard
0.02 mm0D − d?

Hole diameters D are normal with mean 25.02 mm and standard deviation 0.015 mm. Shaft diameters d are independent and normal with mean 25 mm and standard deviation 0.02 mm. A randomly chosen shaft fits when D − d > 0. Find the probability P that it fits. Round z to two decimals.

hole: μ = 25.02 mm, σ = 0.015 mmshaft: μ = 25 mm, σ = 0.02 mm
P =

3Solutions

1.Beam support reactions

Answer: RA = 40 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

P1​ = 30 kNP2​ = 35 kNABRA​RB​1 m1 m2 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·4 = 30·1 + 35·2
RB = 100/4 = 25 kN
ΣFy = 0: RA = 65 − 25 = 40 kN

Answer

RA = 40 kN
2.Beam support reactions

Answer: RA = 55.94 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

w = 5 kN/mP = 60 kNABRA​RB​2 m5 m1 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

UDL resultant: W = w·ℓ = 5·5 = 25 kN, acting at x̄ = 4.5 m
ΣMA = 0: RB·8 = 60·2 + 5·5·4.5
RB = 232.5/8 = 29.06 kN
ΣFy = 0: RA = 85 − 29.06 = 55.94 kN

Answer

RA = 55.94 kN
3.Truss: method of joints

Answer: FBC = −4.488 kN

Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.

ABBCACACB10 kNAy​Cy​

Support reactions

Equilibrium of the whole truss. Moments about A, counter-clockwise positive.

ΣMA = 0: Cy·6 = 10·1 → Cy = 1.667 kN
ΣFy = 0: Ay = 10 − 1.667 = 8.333 kN

Joint C

The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.

sin γ = 2/5.385 = 0.3714, cos γ = 5/5.385 = 0.9285
ΣFy = 0: Cy + FBC·sin γ = 0 → FBC = −1.667/0.3714 = −4.488 kN

Answer

FBC = −4.488 kN (compression)
4.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 36.56 kN (T), BC: 43.12 kN (T), CD: 43.12 kN (T), DE: 30.94 kN (T), FG: 36.56 kN (C), GH: 30.94 kN (C), AF: 35.94 kN (C), HE: 51.56 kN (C), BF: 8.75 kN (T), CG: 0, DH: 16.25 kN (T), BG: 10.94 kN (C), DG: 20.31 kN (C)

Answer

Zero-force member: CG
5.Shear force & bending moment

Answer: Mx = 7.5 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 4·8 = 32 kN, acting at x̄ = 4 m
ΣMA = 0: RB·8 = 4·8·4
RB = 128/8 = 16 kN
ΣFy = 0: RA = 32 − 16 = 16 kN
w = 4 kN/mABRA​ = 16RB​ = 16section7.5 m0.5 m

Cut at x = 7.5 m and keep the left part

Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.

M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 16·7.5 − 4·7.5·3.75 = 7.5 kN·m

Answer

Mx = 7.5 kN·m
6.Shear force & bending moment

Answer: E (x = 8 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 30 kN, R2 = 60 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = −70, MC = −80, MD = −90, ME = −140 kN·m, MF = −70, MG = 0

Answer

Mark E: ME = −140 kN·m
7.Beam deflection

Answer: δP = 1.623 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 2000 N, a = 1000 mm, b = 3000 mm, L = 4000 mm
EI = 9.24 × 10¹¹ N·mm²

Deflection under the load

δP = Pa²b²/(3EIL) = 2000·1000²·3000²/(3·9.24 × 10¹¹·4000) = 1.623 mm

Answer

δP = 1.623 mm
8.Beam deflection

Answer: RB = 11.25 kN

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).

Remove the prop

Without the prop the beam is a cantilever. Its free end would deflect under the load.

δload = wL⁴/(8EI)

Compatibility at the prop

The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.

RB·L³/(3EI) = wL⁴/(8EI) → RB = 3wL/8 = 3·6·5/8 = 11.25 kN

Answer

RB = 11.25 kN
9.Column buckling

Answer: Pcr = 67.29 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·50⁴/64 = 306796 mm⁴

Effective length

KL = 2·1500 = 3000 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·306796/3000² = 67288 N = 67.29 kN

Answer

Pcr = 67.29 kN
10.Column buckling

Answer: σcr = 17.27 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·80⁴/64 = 2.011 × 10⁶ mm⁴

Radius of gyration and slenderness

A = 5027 mm²
r = √(I/A) = √(2.011 × 10⁶/5027) = 20 mm
KL = 2·2000 = 4000 mm
KL/r = 4000/20 = 200

Critical stress

σcr = π²E/(KL/r)² = π²·70000/200² = 17.27 MPa

Answer

σcr = 17.27 MPa
11.Centroid & second moment of area

Answer: Ix = 26.67 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (15000·75 − 1963·52.5)/(15000 − 1963) = 78.39 mm

Full plate about ȳ

100·150³/12 + 15000·−3.389² = 28.3 × 10⁶ mm⁴

Hole about ȳ

π·50⁴/64 + 1963·−25.89² = 1.623 × 10⁶ mm⁴

Subtract

Ix = 26.67 × 10⁶ mm⁴

Answer

Ix = 26.67 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: σtop = 5.692 MPa

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 280·25 = 7000 mm², yf = 240 + 25/2 = 252.5 mm
web: Aw = 8·240 = 1920 mm², yw = 240/2 = 120 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (7000·252.5 + 1920·120)/8920 = 224 mm

Parallel-axis theorem

flange: 280·25³/12 + 7000·(252.5 − 224)² = 6.058 × 10⁶ mm⁴
web: 8·240³/12 + 1920·(120 − 224)² = 2.997 × 10⁷ mm⁴
Ix = 6.058 × 10⁶ + 2.997 × 10⁷ = 3.603 × 10⁷ mm⁴

Bending stress

The top edge is h − ȳ from the axis.

y = 265 − 224 = 41.02 mm
σ = M·y/I = 5 × 10⁶·41.02/3.603 × 10⁷ = 5.692 MPa

Answer

σtop = 5.692 MPa
13.Effective stress in soil

Answer: u = 29.43 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·3 = 29.43 kPa

Answer

u = 29.43 kPa
14.Effective stress in soil

Answer: σ′ = 108.3 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·5 + γsat,sand·1 + γsat,clay·3
σ = 15.5·5 + 19·1 + 17·3 = 147.5 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·4 = 39.24 kPa

Effective stress

σ′ = σ − u = 147.5 − 39.24 = 108.3 kPa

Answer

σ′ = 108.3 kPa
15.Consolidation settlement

Answer: S = 68.58 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Preconsolidation pressure

σ′p = OCR·σ′0 = 3·85 = 255 kPa

Compare with the preconsolidation pressure

σ′f = 85 + 200 = 285 kPa > 255 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.05·3/(1 + 1.1)·log₁₀(255/85) + 0.5·3/(1 + 1.1)·log₁₀(285/255)
S = 34.08 + 34.5 = 68.58 mm

Answer

S = 68.58 mm
16.Consolidation settlement

Answer: t = 2500 days

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage paths

Hdr,lab = 20/2 = 10 mm = 0.01 m
Hdr,field = 6 m

Scale the time

t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.

tfield = 10·(6/0.01)² = 3.6 × 10⁶ min
tfield = 3.6 × 10⁶/1440 = 2500 days

Answer

t = 2500 days
17.Hydrostatic force

Answer: F = 208.5 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 3 + 2.5/2 = 4.25 m
A = H·b = 2.5·2 = 5 m²
gated = 3 mH = 2.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·4.25·5 = 208.5 kN

Answer

F = 208.5 kN
18.Hydrostatic force

Answer: ycp = 3.595 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 2.5 + 2/2 = 3.5 m
A = H·b = 2·1 = 2 m²
gated = 2.5 mH = 2 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·3.5·2 = 68.67 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 1·2³/12 = 0.6667 m⁴
ycp = yc + Ic/(yc·A) = 3.5 + 0.6667/(3.5·2) = 3.595 m

Answer

ycp = 3.595 m
19.Pipe friction & head loss

Answer: Δp = 138.8 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.022·(300/0.2)·2.9²/(2·9.81) = 14.15 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·14.15 = 138765 Pa = 138.8 kPa

Answer

Δp = 138.8 kPa
20.Pipe friction & head loss

Answer: Δz = 14.99 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.05/0.01767 = 2.829 m/s
V²/(2g) = 0.408 m

Loss coefficients

f·L/D = 0.022·200/0.15 = 29.33
ΣK = 0.5 + 3·0.3 + 5 + 1.0 = 7.4

Total head loss

hf = 29.33·0.408 = 11.97 m
hm = 7.4·0.408 = 3.019 m
Δz = hf + hm = 14.99 m

Answer

Δz = 14.99 m
21.Open-channel flow (Manning)

Answer: Q = 26.46 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (5.5 + 2·2.1)·2.1 = 20.37 m²
P = b + 2y·√(1 + z²) = 5.5 + 2·2.1·√(1 + 2²) = 14.89 m
R = A/P = 1.368 m

Velocity

V = (1/0.03)·1.3682/3·0.0011/2 = 1.299 m/s

Flow rate

Q = A·V = 20.37·1.299 = 26.46 m³/s

Answer

Q = 26.46 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.0009353 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (1.5 + 1.5·1.5)·1.5 = 5.625 m²
P = b + 2y·√(1 + z²) = 1.5 + 2·1.5·√(1 + 1.5²) = 6.908 m
R = A/P = 0.8142 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.015·10/(5.625·0.872) = 0.03058
S = 0.03058² = 0.0009353

Answer

S = 0.0009353

That is a fall of 0.9353 m per kilometre.

23.Pumps & pump power

Answer: Pshaft = 15.09 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.05·20 = 9.81 kW

Shaft power

Pshaft = Ph/η = 9.81/0.65 = 15.09 kW

Answer

Pshaft = 15.09 kW
24.Pumps & pump power

Answer: H = 11.09 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.03/0.01767 = 1.698 m/s
V²/(2g) = 0.1469 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (26.67 + 8)·0.1469 = 5.092 m

Pump head

Both surfaces are open and practically at rest, so pressure and velocity terms drop out.

H = Δz + hL = 6 + 5.092 = 11.09 m

Answer

H = 11.09 m
25.Time value of money

Answer: PV = 15751 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate and number of periods

i = 0.04/4 = 0.01
N = 4·6 = 24

Present value

PV = FV/(1 + i)N = 20 000/1.27 = €15 751.32

Answer

PV = €15 751.32
26.Time value of money

Answer: A = 342.9 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly rate and number of payments

i = 0.07200000000000001/12 = 0.006
N = 12·6 = 72

Payment

The present value of N equal payments A is A·(1 − (1 + i)⁻ᴺ)/i. Set it equal to the loan and solve for A.

(1 + i)−N = 0.65
A = 20 000·0.006/(1 − 0.65) = €342.90

Answer

A = €342.90
27.NPV & IRR

Answer: NPV = 845.6 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of each cash flow

CF0 = −60 000
CF1/(1 + 0.09)1 = 28 000/1.09 = 25 688.07
CF2/(1 + 0.09)2 = 17 000/1.188 = 14 308.56
CF3/(1 + 0.09)3 = 27 000/1.295 = 20 848.95

Add them up

NPV = €845.59

Answer

NPV = €845.59

NPV is positive, so the project earns more than the required return.

28.NPV & IRR

Answer: IRR = 17.35 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(15%) = 784.50
NPV(20%) = −833.33

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 15 + 5·784.50/(784.50 − (−833.33)) = 17.42%
exact: NPV(17.35%) = 0 → IRR = 17.35%

Answer

IRR = 17.35%
29.Normal distribution

Answer: z = 2.15

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left of z

Φ(z) = (1 + 0.9684)/2 = 0.9842

Read the z-table backwards

Find 0.9842 inside the table and read off z.

z = 2.15

Answer

z = 2.15
30.Normal distribution

Answer: P = 0.7881

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the difference

μ = 25.02 − 25 = 0.02 mm, σ = 0.025 mm

Standardise

z = (0 − 0.02)/0.025 = −0.8

Probability

P = 1 − Φ(−0.8) = 0.7881

Answer

P = 0.7881

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.

ExamProblems · examproblems.com/courses/fe-exam-civil